Printing Options
 Hide Company Header - Leave lines blank
 Print continuously - Do not break pages
Adjuster Report
LKK Auto Consultants Pte Ltd (Co.Reg.No:199607198R)
51 Ubi Ave 1 #01-25, Paya Ubi Industrial Park
Singapore 408933
Tel: 6256-3561  Fax: 6844-8805   Email: sur@lkkauto.com;assignments@lkkauto.com

VEHICLE DAMAGE INSPECTION REPORT

  Our File No:CS/CTI21008227/UQCN2
Date:13/08/2021

REFERENCE
Handling Insurer:China Taiping Insurance (Singapore) Pte. Ltd. Policy No:DMPCSNW00073642101
Claimant Vehicle No : SJP4636LInsured Vehicle No : SKV9973L
Date of Loss:02/08/2021 Nature of Claim:TP Claim No: SNM21D204264/C02

DESCRIPTION & IDENTIFICATION OF VEHICLE
Reg No:SJP4636L
Make & Model:TOYOTA PREMIO, 1.5 F (A) Engine No:1NZD296686
Reg. Date:25/03/2009 (Man. Year: 2008) Chassis No: NZT2603038214
Colour:Maroon Odometer:126474 km
Engine Capacity:1496 cc
Market Value/New Car Price:N/A
Sum Insured (S$):Market Value/New Car Price

CONDITION OF VEHICLE AT THE TIME OF SURVEY
General Condition: Steering (Serviceable):Yes Footbrake (Serviceable):Yes
Handbrake (Serviceable):Yes Engine Modification:No Pre-accident Condition:

CONDITION OF TYRES
Front Tyre Size:205/55 R16 Rear Tyre Size:205/55 R16
Front Left Side: Continental  6 mm Rear Left Side: Continental  6 mm
Front Right Side:Continental  6 mm Rear Right Side:Continental  6 mm
The above values represent the remaining tyre treads depth

COST OF CLAIMS Repairer's Adjuster's DifferenceDiff %
Parts 1,860.50 1,021.75 838.75 45.08
Miscellaneous Items 0.00 0.00 0.00  
Labour 1,590.00 1,380.00 210.00 13.21
Paintwork Labour 0.00 0.00 0.00  
Towing 0.00 0.00 0.00  
  
Calculated Gross Total (S$) 3,450.50 2,401.75 1,048.75 30.39
Approved Total (Overridden) (S$) 1,900.00
  
(S$) 3,450.50 1,900.00 1,550.50 44.94
+ GST 7.00/7.00% (S$) 241.54 133.00 108.54 44.94
  
Nett Amount (S$) 3,692.04 2,033.00 1,659.04 44.94
  

INSPECTION
Date of Assignment:04/08/2021
Date Inspected:04/08/2021 Inspected At:Tan Lim Motor Pte Ltd (Defu)
1 Defu Lane 6
Singapore 539365
Estimated Period of Repair:4.0 days



Adjuster: MARCUS CHUA   Manager: SHIAU CHAN
 
NOTE: This report represents our findings at the time and place of inspection stated herein. Such inspection has been carried out to the best of our knowledge and ability but any other liability under any other circumstances is hereby expressly excluded.

 
REPAIR DETAILS
Reference
Part Source:MRM-SGVersion: 1.0 (Last Synchronised: 13 Aug 2021)
Parts:143TOYOTA PREMIO 1.5 F (A) (Catalogue:Merimen Singapore 1.0)
Labour:Repairer's(Price-denominated Standard List) 
Print Code:(Unsubmitted, no print-code for SJP4636L)
Validity:These estimates are valid only if they contain the print code (above) on all estimate pages, running page numbers with the END OF ESTIMATES marker on the last estimate page
Further Info:Items/values not in reference catalogue are prefixed with an asterisk *.


Recommended Parts
Report was unsubmitted during this print-out.
No.Qty Part No. Particulars Condition Repairer's Amount

1 1 *REAR BUMPER Deformed/Warped 506.00 FL *506.00 FL
2 1 *N/S REAR BUMPER SIDE RETAINER Bent 35.00 FL *35.00 FL
3 1 *N/S REAR FENDER Badly Dented 768.00 FL *768.00 FL
4 1 *N/S REAR LAMP Not Necessary 465.00 FL *- FL
5 1 *N/S REAR TYRE RIM Repair 450.00 FS *- FS
6 1 *REAR WINDSCREEN SEALANT Necessary 80.00 FS *40.00 FS
F=Franchise part. S=SpcNett. L=ListItemDisc.
Sub Total (S$)2,304.00 1,349.00
- List Item Discount on L Items 25.00/25.00% (S$) 443.50327.25
 
Total Parts (S$) 1,860.50 1,021.75
 
 
Recommended Miscellaneous Items
There are no new miscellaneous items selected.

Recommended Labour
Report was unsubmitted during this print-out.
NoParticulars Lab.Type Repairer's Amount

Labour Items
1 TO REMOVE AND REFIT INTERIOR FITTINGS,TRIMMINGS,GARNISH AND OTHER,TO ENABLE REPAIR New 60.00 60.00
2 TO CHECK ELECTRICAL LIGHTING CONCERNED New 60.00 20.00
3 TO REMOVE AND REFIT REAR WINDSCREEN GLASS New 140.00 120.00
4 PANEL BEATING,KNOCKING AND STRAIGHTEN THE NECESSARY PORTION,REMOVE AND RENEWAL OF PARTS,ADJUST AND REALIGN THE SAME New 650.00 600.00
5 PUTTY AND SPRAY PAINTING OF THE AFFECTED PORTION New 600.00 520.00
6 TO CHECK STEERING GEOMETRY AND COMPUTER WHEEL ALIGNMENT New 80.00 60.00
 
Gross Labour Cost (S$) 1,590.001,380.00
 

< END OF ESTIMATES >