Printing Options
 Hide Company Header - Leave lines blank
 Print continuously - Do not break pages
Adjuster Report
LKK Auto Consultants Pte Ltd (Co.Reg.No:199607198R)
51 Ubi Ave 1 #01-25, Paya Ubi Industrial Park
Singapore 408933
Tel: 6256-3561  Fax: 6844-8805   Email: sur@lkkauto.com;assignments@lkkauto.com

VEHICLE DAMAGE INSPECTION REPORT

AIG Asia Pacific Insurance Pte. Ltd.
AIG Building, 78 Shenton Way, #09-16
Singapore 079120
Our File No:CC3/AIG21008001/AUCN2
Date:16/08/2021

REFERENCE
Insured/Claimant:NGAI SOOK MUN Policy No:7210012874
Date of Loss:21/07/2021 Nature of Claim:OD Claim No: 5633159214SG

DESCRIPTION & IDENTIFICATION OF VEHICLE
Reg No:SMX8155D
Make & Model:AUDI Q2 SPORT, 1.4 TFSI COD S-TRONIC (A) Engine No:CZE868357
Reg. Date:29/01/2021 (Man. Year: 2020) Chassis No: WAUZZZGA1LA068688
Colour:Red Odometer:7365 km
Engine Capacity:1395 cc
Market Value/New Car Price:S$130,000.00
Sum Insured (S$):Market Value/New Car Price

CONDITION OF VEHICLE AT THE TIME OF SURVEY
General Condition: Steering (Serviceable):Yes Footbrake (Serviceable):Yes
Handbrake (Serviceable):Yes Engine Modification:No Pre-accident Condition:

CONDITION OF TYRES
Front Tyre Size:215/55R17 Rear Tyre Size:215/55R17
Front Left Side: Bridgestone  6 mm Rear Left Side: Bridgestone  6 mm
Front Right Side:Bridgestone  6 mm Rear Right Side:Bridgestone  6 mm
The above values represent the remaining tyre treads depth

COST OF CLAIMS Repairer's Adjuster's DifferenceDiff %
Parts 6,696.00 4,132.00 2,564.00 38.29
Miscellaneous Items 0.00 0.00 0.00  
Labour 4,672.00 2,472.00 2,200.00 47.09
Paintwork Labour 0.00 0.00 0.00  
Towing 0.00 0.00 0.00  
  
Calculated Gross Total (S$) 11,368.00 6,604.00 4,764.00 41.91
- Excess (S$) 3,000.00 3,000.00 0.00 0.00
  
(S$) 8,368.00 3,604.00 4,764.00 56.93
+ GST 7.00/7.00% (S$) 585.76 252.28 333.48 56.93
  
Nett Amount (S$) 8,953.76 3,856.28 5,097.48 56.93
  

INSPECTION
Date of Assignment:28/07/2021
Date Inspected:27/07/2021 Inspected At:Premium Automobiles Pte Ltd (UBI)
55 Ubi Road 1
Singapore 408699
Estimated Period of Repair:3.0 days



Adjuster: ADRIAN LING   Manager: Tan Hui Zhen
 
NOTE: This report represents our findings at the time and place of inspection stated herein. Such inspection has been carried out to the best of our knowledge and ability but any other liability under any other circumstances is hereby expressly excluded.

 
(REPAIR COST NOT CONCLUDE)
(EXCLUDE CHECK ITEMS S$845.00 NETT)
 
 
REPAIR DETAILS


Recommended Parts
Report was unsubmitted during this print-out.
No.Qty Part No. Particulars Condition Repairer's Amount

1 1 *REAR UPPER BUMPER Deformed 1,280.00 FS *1,280.00 FS
2 1 *REAR BUMPER FIXING PART Not Necessary 77.00 FS *- FS
3 1 *REAR LOWER BUMPER Deformed 1,090.00 FS *1,090.00 FS
4 1 *REAR BUMPER TRIM-LH/RH O/s Damaged 446.00 FS *223.00 FS
5 1 *TOWING EYE COVER *Check 48.00 FS *- FS
6 1 *REAR LIGHT REFLECTOR-RH Missing 30.00 FS *30.00 FS
7 1 *TAIL LIGHT-RH Not Necessary 1,321.00 FS *- FS
8 1 *REAR BUMPER CARRIER *Check 579.00 FS *- FS
9 2 *REAR BUMPER HOLDING STRAP *Check 26.00 FS *- FS
10 1 *REAR BUMPER GUIDE SECTION Not Necessary 54.00 FS *- FS
11 1 *PARKING AID SENSOR
(Npa)
Not Necessary 0.00 FS *- FS
12 4 *PARKING AID SENSOR SEAL Not Necessary 14.00 FS *- FS
13 2 *REAR WHEEL ARCH-LH/RH Necessary 904.00 FS *904.00 FS
14 1 *SUNDRIES *Check 192.00 FS *- FS
15 1 *REAR BUMPER SPOILER Deformed 605.00 FS *605.00 FS
16 1 *TAIL LIGHT TRIM-RH Not Necessary 30.00 FS *- FS
F=Franchise part. S=SpcNett.
Total Parts (S$) 6,696.00 4,132.00
 
 
Recommended Miscellaneous Items
There are no new miscellaneous items selected.

Recommended Labour
Report was unsubmitted during this print-out.
NoParticulars Lab.Type Repairer's Amount

Labour Items
1 TO REMOVE AND REINSTALL REAR PARKING AID.CHECK FUNCTION New 280.00 280.00
2 TO DISMANTLE AND RENEW REAR BUMPER.RE-ORGANIZE CRASH MANAGEMENT COMPONENTS.REINSTALL ALL PARTS REMOVED New 1,200.00 500.00
3 TO RESPRAY REAR UPPER BUMPER,REAR LOWER BUMPER AND BOTH REAR WHEEL ARCH TRIMS New 3,000.00 1,500.00
4 TO CARRY OUT DIAGNOSTIC CHECK New 192.00 192.00
 
Gross Labour Cost (S$) 4,672.002,472.00
 

< END OF ESTIMATES >