Printing Options
 Hide Company Header - Leave lines blank
 Print continuously - Do not break pages
Adjuster Report
LKK Auto Consultants Pte Ltd (Co.Reg.No:199607198R)
51 Ubi Ave 1 #01-25, Paya Ubi Industrial Park
Singapore 408933
Tel: 6256-3561  Fax: 6844-8805   Email: sur@lkkauto.com;assignments@lkkauto.com

VEHICLE DAMAGE INSPECTION REPORT

  Our File No:CS/CTI21007465/UUCN2
Date:17/08/2021

REFERENCE
Handling Insurer:China Taiping Insurance (Singapore) Pte. Ltd. Policy No:DMB1SNW00007082000
Claimant Vehicle No : XE3281AInsured Vehicle No : PC6122L
Date of Loss:07/07/2021 Nature of Claim:TP Claim No: SNM21D203785/C02/LEEPG

DESCRIPTION & IDENTIFICATION OF VEHICLE
Reg No:XE3281A
Make & Model:MITSUBISHI FUSO, 12.0 D FV51SJD2DEA (M) Engine No:OM457LA457972C0333584
Reg. Date:03/08/2017 (Man. Year: 2017) Chassis No: FV51SJA20257
Colour:White Odometer:477310 km
Engine Capacity:11967 cc
Market Value/New Car Price:N/A
Sum Insured (S$):Market Value/New Car Price

CONDITION OF VEHICLE AT THE TIME OF SURVEY
General Condition: Steering (Serviceable):Yes Footbrake (Serviceable):Yes
Handbrake (Serviceable):Yes Engine Modification:No Pre-accident Condition:

CONDITION OF TYRES
Front Tyre Size:295/80R22.5 Rear Tyre Size:295/80R22.5 (D/D)
Front Left Side: Centara  6 mm Rear Left Side: Centara  6/66/6 mm
Front Right Side:Centara  6 mm Rear Right Side:Centara  6/66/6 mm
The above values represent the remaining tyre treads depth

COST OF CLAIMS Repairer's Adjuster's DifferenceDiff %
Parts 6,256.73 3,222.14 3,034.59 48.50
Miscellaneous Items 0.00 0.00 0.00  
Labour 3,300.00 1,850.00 1,450.00 43.94
Paintwork Labour 0.00 0.00 0.00  
Towing 0.00 0.00 0.00  
  
Calculated Gross Total (S$) 9,556.73 5,072.14 4,484.59 46.93
Approved Total (Overridden) (S$) 4,000.00
  
(S$) 9,556.73 4,000.00 5,556.73 58.14
+ GST 7.00/7.00% (S$) 668.97 280.00 388.97 58.14
  
Nett Amount (S$) 10,225.70 4,280.00 5,945.70 58.14
  

INSPECTION
Date of Assignment:08/07/2021
Date Inspected:09/07/2021 Inspected At:Mah Lian Motor Vehicle Repairer (HQ)
NO. 38 DEFU LANE 9
Singapore 539278
Estimated Period of Repair:4.0 days



Adjuster: MARCUS CHUA   Manager: Tan Hui Zhen
 
NOTE: This report represents our findings at the time and place of inspection stated herein. Such inspection has been carried out to the best of our knowledge and ability but any other liability under any other circumstances is hereby expressly excluded.

 
REPAIR DETAILS
Reference
Part Source: (Last Synchronised: 17 Aug 2021)
Parts:N/AMITSUBISHI FUSO 12.0 D FV51SJD2DEA (M) (Model not available in database)
Labour:Repairer's(Price-denominated Standard List) 
Print Code:(Unsubmitted, no print-code for XE3281A)
Validity:These estimates are valid only if they contain the print code (above) on all estimate pages, running page numbers with the END OF ESTIMATES marker on the last estimate page
Further Info:Items/values not in reference catalogue are prefixed with an asterisk *.


Recommended Parts
Report was unsubmitted during this print-out.
No.Qty Part No. Particulars Condition Repairer's Amount

1 1 *SIDE MIRROR STAY-LH Serviceable 499.45 FL *- FL
2 1 *SIDE MIRROR (B)-LH Broken 177.68 FL *177.68 FL
3 1 *TAIL LAMP-LH Cracked 358.51 FL *358.51 FL
4 2 *REAR MUDGUARD-RH/LH Dented/Buckled 2,600.00 FS *1,600.00 FS
5 2 *SET REAR MUDGUARD BRACKET-RH/LH Repair 1,160.00 FS *- FS
6 1 *REAR MUDGUARD RUBBER-RH/LH N/s Torn 240.00 FS *120.00 FS
7 1 *REAR TIPPER CANVASS-LH Torn 380.00 FS *300.00 FS
8 1 *REAR TIPPER FRAME-LH Distorted 1,100.00 FS *800.00 FS
F=Franchise part. S=SpcNett. L=ListItemDisc.
Sub Total (S$)6,515.64 3,356.19
- List Item Discount on L Items 25.00/25.00% (S$) 258.91134.05
 
Total Parts (S$) 6,256.73 3,222.14
 
 
Recommended Miscellaneous Items
There are no new miscellaneous items selected.

Recommended Labour
Report was unsubmitted during this print-out.
NoParticulars Lab.Type Repairer's Amount

Labour Items
1 LABOUR TO REMOVE & REFIT REAR TIPPER CANVASS,CANVASS FRAME & TO RENEW REAR MUDGUARD New 1,800.00 1,200.00
2 TO SPRAY & PAINTING ON AFFECTED AREA New 1,100.00 600.00
3 TO RUST PROOFING AT AFFECTED AREA New 400.00 50.00
 
Gross Labour Cost (S$) 3,300.001,850.00
 

< END OF ESTIMATES >