Adjuster Report
VEHICLE DAMAGE INSPECTION REPORT
|
AIG Asia Pacific Insurance Pte. Ltd. AIG Building, 78 Shenton Way, #09-16 Singapore 079120 |
Our File No: | CS/AIG21007156/KQF3N2 |
| Date: | 06/08/2021 |
REFERENCE |
| Insured/Claimant: | DAIMLER FLEET MANAGEMENT SINGAPORE PTE. LTD |
Policy No: | 0999993659 |
| Date of Loss: | 01/06/2021 |
Nature of Claim: | OD |
Claim No: |
2806463267SG
|
| DESCRIPTION & IDENTIFICATION OF VEHICLE |
| Reg No: | SKW5517S |
| Make & Model: | MERCEDES-BENZ E250, 2.0 SEDAN EDITION E (R18 LED SR) (A) |
Engine No: | 27492030443394 |
| Reg. Date: | 04/11/2015 (Man. Year: 2015) |
Chassis No: |
WDD2120362B212079 |
| Colour: | Metallic Grey |
Odometer: | 52560 km |
| Engine Capacity: | 1991 cc |
| Market Value/New Car Price: | S$102,000.00 |
| Sum Insured (S$): | Market Value/New Car Price |
| CONDITION OF VEHICLE AT THE TIME OF SURVEY |
| General Condition: | |
Steering (Serviceable): | Yes | Footbrake (Serviceable): | Yes |
| Handbrake (Serviceable): | Yes |
Engine Modification: | No |
Pre-accident Condition: | |
| CONDITION OF TYRES |
| Front Tyre Size: | 245/40ZR18 |
Rear Tyre Size: | 265/35ZR18 |
|
Front Left Side:
| Michelin 5 mm | |
Rear Left Side:
| Michelin 4 mm | |
| Front Right Side: | Michelin 5 mm | |
Rear Right Side: | Michelin 4 mm | |
| The above values represent the remaining tyre treads depth |
| Parts |
5,649.60 |
4,384.60
|
1,265.00 |
22.39 |
| Miscellaneous Items |
0.00 |
0.00 |
0.00 |
|
| Labour |
2,370.00 |
930.00 |
1,440.00 |
60.76 |
| Paintwork Labour |
0.00 |
0.00 |
0.00 |
|
| Towing |
0.00 |
0.00 |
0.00 |
|
| | |
|
Calculated Gross Total
(S$)
|
8,019.60 |
5,314.60 |
2,705.00 |
33.73 |
| - Excess (S$) |
1,700.00 |
1,700.00 |
0.00 |
0.00 |
| | |
| (S$) |
6,319.60 |
3,614.60 |
2,705.00 |
42.80 |
| +
GST 7.00/7.00% (S$)
|
442.37 |
253.02 |
189.35 |
42.80 |
| | |
| Nett Amount (S$) |
6,761.97 |
3,867.62 |
2,894.35 |
42.80 |
| | |
| INSPECTION |
| Date of Assignment: | 29/06/2021 |
| Date Inspected: | 30/06/2021 |
Inspected At: | Tong Luck Auto Pte Ltd (HQ) 160 Sin Ming Drive, #07-01 Sin Ming AutoCity Singapore 575722 |
| Estimated Period of Repair: | 5.0 days |
| Adjuster: |
KENNETH KONG |
|
Manager:
|
SHIAU CHAN
|
|
|
|
|
|
|
NOTE: This report represents our findings at the time and place of inspection stated herein. Such inspection has been carried out to the best of our knowledge and ability but any other liability under any other circumstances is hereby expressly excluded.
|
Recommended Parts
| Report was unsubmitted during this print-out. |
| No. | Qty |
Part No. |
Particulars |
Condition | Repairer's | |
Amount |
|
| 1 |
1 |
|
*FRONT DOOR-RH (WCP) |
Bent |
1,280.00 |
F |
*1,280.00 |
F |
| 2 |
1 |
|
*FRONT DOOR WEATHERSTRIP-RH (WCP) |
Necessary |
198.00 |
F |
*198.00 |
F |
| 3 |
1 |
|
*SIDE MIRROR ASSY-RH (WCP) |
Broken |
1,850.00 |
F |
*1,850.00 |
F |
| 4 |
1 |
|
*FRONT FENDER-RH (ALUMINIUM)(WCP) |
Bent |
590.00 |
F |
*590.00 |
F |
| 5 |
1 |
|
*FRONT DOOR EDITION EMBLEM-RH (WCP) |
Necessary |
68.00 |
F |
*68.00 |
F |
| 6 |
1 |
|
*FRONT SPORT RIM-RH (WCP) |
Serviceable |
1,150.00 |
F |
*- |
F |
| F=Franchise part. |
|
| Sub Total (S$) | 5,136.00 | |
3,986.00
| |
| + Margin on L,N Items 10.00/10.00% (S$) |
513.60 | | 398.60 | |
| |
|
| Total Parts (S$) |
5,649.60 | | 4,384.60 | |
| |
|
Recommended Miscellaneous Items
| No | Qty | Particulars |
Repairer's |
Amount |
|
| Miscellaneous Items |
| 1 |
1 |
*OD/TP Case (Insurer) |
- |
0.00 |
| |
|
| | Sub Total (S$) |
0.00 | 0.00 |
| |
|
Recommended Labour
| Report was unsubmitted during this print-out. |
| No | Particulars |
Lab.Type | Repairer's | Amount |
|
| Labour Items |
| 1 |
TO TRANSFER RH FRONT DOOR INTERIOR MECHANISM TO NEW DOOR |
New |
150.00 | 60.00 |
| 2 |
TO CHECK AND RECTIFY WIRING SYSTEM |
New |
100.00 | 20.00 |
| 3 |
TO PANEL BEAT RH FRONT DOOR PILLAR,INCLUDING REPLACEMENT OF PARTS AND ALIGN WHERE NECESSARY,TO REFIT AND ADJUST THE SAME |
New |
800.00 | 400.00 |
| 4 |
TO PUTTY & SPRAY PAINT ON AFFECTED AREAS |
New |
1,200.00 | 450.00 |
| 5 |
TO COMPUTERISE CHECK WHEEL ALIGNMENT |
New |
120.00 | 0.00 |
| |
|
| Gross Labour Cost (S$) |
2,370.00 | 930.00 |
| |
|
< END OF ESTIMATES >