Adjuster Report
VEHICLE DAMAGE INSPECTION REPORT
|
| |
Our File No: | CS/CTI21007110/UQCN2 |
| Date: | 27/07/2021 |
REFERENCE |
| Handling Insurer: | China Taiping Insurance (Singapore) Pte. Ltd. |
Policy No: | DMCVSNW00047472000 |
| Claimant Vehicle No : | YP3227M | Insured Vehicle No : | GBB8923A |
| Date of Loss: | 24/06/2021 |
Nature of Claim: | TP |
Claim No: |
SNM21D203582/C02/TOHHS
|
| DESCRIPTION & IDENTIFICATION OF VEHICLE |
| Reg No: | YP3227M |
| Make & Model: | HINO XZU710R-HKFMS3, 4.0 D (M) |
Engine No: | N04CUS28074 |
| Reg. Date: | 28/06/2016 (Man. Year: 2016) |
Chassis No: |
JHHUCS3H70K017630 |
| Colour: | White/Silver |
Odometer: | 298196 km |
| Engine Capacity: | 4009 cc |
| Market Value/New Car Price: | N/A |
| Sum Insured (S$): | Market Value/New Car Price |
| CONDITION OF VEHICLE AT THE TIME OF SURVEY |
| General Condition: | |
Steering (Serviceable): | Yes | Footbrake (Serviceable): | Yes |
| Handbrake (Serviceable): | Yes |
Engine Modification: | No |
Pre-accident Condition: | |
| CONDITION OF TYRES |
| Front Tyre Size: | 7.00 R16 |
Rear Tyre Size: | 7.00 R16 (D) |
|
Front Left Side:
| Linglong 6 mm | |
Rear Left Side:
| Linglong 6/6 mm | |
| Front Right Side: | Linglong 6 mm | |
Rear Right Side: | Linglong 6/6 mm | |
| The above values represent the remaining tyre treads depth |
| Parts |
2,174.00 |
878.00
|
1,296.00 |
59.61 |
| Miscellaneous Items |
0.00 |
0.00 |
0.00 |
|
| Labour |
1,150.00 |
440.00 |
710.00 |
61.74 |
| Paintwork Labour |
0.00 |
0.00 |
0.00 |
|
| Towing |
0.00 |
0.00 |
0.00 |
|
| | |
| Calculated Gross Total (S$) |
3,324.00 |
1,318.00 |
2,006.00 |
60.35 |
| Approved Total (Overridden) (S$) |
|
1,050.00 |
| | |
| (S$) |
3,324.00 |
1,050.00 |
2,274.00 |
68.41 |
| +
GST 7.00/7.00% (S$)
|
232.68 |
73.50 |
159.18 |
68.41 |
| | |
| Nett Amount (S$) |
3,556.68 |
1,123.50 |
2,433.18 |
68.41 |
| | |
| INSPECTION |
| Date of Assignment: | 28/06/2021 |
| Date Inspected: | 19/07/2021 |
Inspected At: | Tan Lim Motor Pte Ltd (Defu) 1 Defu Lane 6 Singapore 539365 |
| Estimated Period of Repair: | 2.0 days |
| Adjuster: |
MARCUS CHUA |
|
Manager:
|
SHIAU CHAN
|
|
|
|
|
|
|
NOTE: This report represents our findings at the time and place of inspection stated herein. Such inspection has been carried out to the best of our knowledge and ability but any other liability under any other circumstances is hereby expressly excluded.
|
Reference |
| Part Source: | | (Last Synchronised: 26 Jul 2021) |
| Parts: | N/A | HINO XZU710R-HKFMS3 4.0 D (M) (Model not available in database) |
| Labour: | Repairer's | (Price-denominated Standard List) | |
| Print Code: | (Unsubmitted, no print-code for YP3227M) |
| Validity: | These estimates are valid only if they contain the print code (above) on all estimate pages, running page numbers with the END OF ESTIMATES marker on the last estimate page |
| Further Info: | Items/values not in reference catalogue are prefixed with an asterisk *. |
Recommended Parts
| Report was unsubmitted during this print-out. |
| No. | Qty |
Part No. |
Particulars |
Condition | Repairer's | |
Amount |
|
| 1 |
2 |
|
*REAR TAILGATE LID (DENTED) |
Not Consistent With The Impact |
600.00 |
FL |
*- |
FL |
| 2 |
2 |
|
*REAR LAMP |
Cracked |
560.00 |
FL |
*560.00 |
FL |
| 3 |
1 |
|
*N/S REAR LAMP PANEL |
No such part |
150.00 |
FL |
*- |
FL |
| 4 |
1 |
|
*REAR STEP WOODEN BAR |
Cracked |
400.00 |
FL |
*400.00 |
FL |
| 5 |
1 |
|
*REAR BUMPER (BENT) |
Not Consistent With The Impact |
650.00 |
FL |
*- |
FL |
| 6 |
1 |
|
*REAR LICENCE PLATE |
Bent |
50.00 |
FS |
*14.00 |
FS |
| F=Franchise part. S=SpcNett. L=ListItemDisc. |
|
| Sub Total (S$) | 2,410.00 | |
974.00
| |
| - List Item Discount on L Items 10.00/10.00% (S$) |
236.00 | | 96.00 | |
| |
|
| Total Parts (S$) |
2,174.00 | | 878.00 | |
| |
|
Recommended Miscellaneous Items
There are no new miscellaneous items selected. |
Recommended Labour
| Report was unsubmitted during this print-out. |
| No | Particulars |
Lab.Type | Repairer's | Amount |
|
| Labour Items |
| 1 |
TO CHECK ELECTRICAL LIGHTING CONCERNED |
New |
80.00 | 20.00 |
| 2 |
TO TRANSFER OF TAILGATE FITTINGS,FIXTURE AND PERFORM WATERSEEPAGE TEST |
New |
120.00 | 0.00 |
| 3 |
PANEL BEATING,KNOCKING AND STRAIGHTEN THE NECESSARY PORTION,REMOVE AND RENEWAL OF PARTS,ADJUST AND REALIGN THE SAME |
New |
600.00 | 300.00 |
| 4 |
PUTTY AND SPRAY PAINTING OF THE AFFECTED PORTION |
New |
350.00 | 120.00 |
| |
|
| Gross Labour Cost (S$) |
1,150.00 | 440.00 |
| |
|
< END OF ESTIMATES >