Printing Options
 Hide Company Header - Leave lines blank
 Print continuously - Do not break pages
Adjuster Report
LKK Auto Consultants Pte Ltd (Co.Reg.No:199607198R)
51 Ubi Ave 1 #01-25, Paya Ubi Industrial Park
Singapore 408933
Tel: 6256-3561  Fax: 6844-8805   Email: sur@lkkauto.com;assignments@lkkauto.com

VEHICLE DAMAGE INSPECTION REPORT

  Our File No:CS/CTI21006891/KUCN2
Date:30/06/2021

REFERENCE
Handling Insurer:China Taiping Insurance (Singapore) Pte. Ltd. Policy No:DMCVSNW00026052100
Claimant Vehicle No : SML5281EInsured Vehicle No : YQ2176C
Date of Loss:21/06/2021 Nature of Claim:TP Claim No: SNM21D203470/C02/TANCHC

DESCRIPTION & IDENTIFICATION OF VEHICLE
Reg No:SML5281E
Make & Model:HONDA FREED HYBRID, 1.5 G (A) Engine No:LEB5615642
Reg. Date:24/05/2019 (Man. Year: 2018) Chassis No: GB71079493
Colour:Metallic Pearl White Odometer:176084 km
Engine Capacity:1496 cc
Market Value/New Car Price:N/A
Sum Insured (S$):Market Value/New Car Price

CONDITION OF VEHICLE AT THE TIME OF SURVEY
General Condition: Steering (Serviceable):Yes Footbrake (Serviceable):Yes
Handbrake (Serviceable):Yes Engine Modification:No Pre-accident Condition:

CONDITION OF TYRES
Front Tyre Size:185/65R15 Rear Tyre Size:185/65R15
Front Left Side: INTERTRAC  9 mm Rear Left Side: INTERTRAC  7 mm
Front Right Side:INTERTRAC  9 mm Rear Right Side:INTERTRAC  7 mm
The above values represent the remaining tyre treads depth

COST OF CLAIMS Repairer's Adjuster's DifferenceDiff %
Parts 2,853.84 2,526.56 327.28 11.47
Miscellaneous Items 0.00 0.00 0.00  
Labour 1,170.00 920.00 250.00 21.37
Paintwork Labour 0.00 0.00 0.00  
Towing 0.00 0.00 0.00  
  
Calculated Gross Total (S$) 4,023.84 3,446.56 577.28 14.35
Approved Total (Overridden) (S$) 2,750.00
  
(S$) 4,023.84 2,750.00 1,273.84 31.66
+ GST 7.00/7.00% (S$) 281.67 192.50 89.17 31.66
  
Nett Amount (S$) 4,305.51 2,942.50 1,363.01 31.66
  

INSPECTION
Date of Assignment:22/06/2021
Date Inspected:22/06/2021 Inspected At:Optima Werkz Pte Ltd (HQ)
10 Ang Mo Kio Industrial Park 2A, #01-05 AMK Autopoint
Singapore 568047
Estimated Period of Repair:4.0 days



Adjuster: KENNETH KONG   Manager: Tan Hui Zhen
 
NOTE: This report represents our findings at the time and place of inspection stated herein. Such inspection has been carried out to the best of our knowledge and ability but any other liability under any other circumstances is hereby expressly excluded.

 
REPAIR DETAILS
Reference
Part Source:MRM-SGVersion: 1.0 (Last Synchronised: 29 Jun 2021)
Parts:M1-MPVHONDA FREED HYBRID 1.5 G (A) (Catalogue:Merimen Singapore 1.0)
Labour:Repairer's(Price-denominated Standard List) 
Print Code:(Unsubmitted, no print-code for SML5281E)
Validity:These estimates are valid only if they contain the print code (above) on all estimate pages, running page numbers with the END OF ESTIMATES marker on the last estimate page
Further Info:Items/values not in reference catalogue are prefixed with an asterisk *.


Recommended Parts
Report was unsubmitted during this print-out.
No.Qty Part No. Particulars Condition Repairer's Amount

1 1 *SIDE MIRROR ASSEMBLY LH Broken 620.20 FL *580.40 FL
2 1 *SIDE MIRROR COVER LH Missing 108.20 FL *98.20 FL
3 1 *FRONT QUARTER GLASS WITH MOULDING LH Cut 450.90 FL *450.90 FL
4 1 *FRONT DOOR LH Bent 1,050.80 FL *950.40 FL
5 1 *FRONT DOOR GLASS OUTER MOULDING LH Cut 85.60 FL *85.60 FL
6 1 *FRONT DOOR STICKER LH Necessary 137.80 FL *137.80 FL
7 1 *FRONT FENDER EMBLEM HYBRID Necessary 82.90 FL *82.90 FL
8 1 *FRONT FENDER LH (NPA) Repair 0.00 FL *- FL
9 1 *FRONT DOOR GLASS LH Cut 735.60 FL *722.00 FL
10 1 *FRONT WHEEL RIM COVER LH Serviceable 245.30 FL *- FL
11 1 *FRONT QUARTER GLASS SEALANT Necessary 40.00 FS *40.00 FS
F=Franchise part. S=SpcNett. L=ListItemDisc.
Sub Total (S$)3,557.30 3,148.20
- List Item Discount on L Items 20.00/20.00% (S$) 703.46621.64
 
Total Parts (S$) 2,853.84 2,526.56
 
 
Recommended Miscellaneous Items
There are no new miscellaneous items selected.

Recommended Labour
Report was unsubmitted during this print-out.
NoParticulars Lab.Type Repairer's Amount

Labour Items
1 LABOUR CHARGES TO REMOVE,REPLACE,REPAIR,READJUST,CHISEL,DISMANTLE ACCIDENT AREAS & ETC New 450.00 300.00
2 LABOUR CHARGES FOR PAINTING & TO SUPPLY PAINT & FURNISHING MATERIALS AT ACCIDENT AREAS & ETC New 500.00 460.00
3 LABOUR TO REMOVE AND TRANSFER DOOR COMPONENTS AND FITTING New 80.00 60.00
4 LABOUR CHARGES TO DISCONNECT & RECONNECT FRONT WIRING SYSTEM & ETC New 40.00 20.00
5 TO REMOVE AND REPLACE FRONT QUARTER GLASS LH New 60.00 50.00
6 CATIVY TREATMENT ON FRONT DOOR LH New 40.00 30.00
 
Gross Labour Cost (S$) 1,170.00920.00
 

< END OF ESTIMATES >