Printing Options
 Hide Company Header - Leave lines blank
 Print continuously - Do not break pages
Adjuster Report
LKK Auto Consultants Pte Ltd (Co.Reg.No:199607198R)
51 Ubi Ave 1 #01-25, Paya Ubi Industrial Park
Singapore 408933
Tel: 6256-3561  Fax: 6844-8805   Email: sur@lkkauto.com;assignments@lkkauto.com

VEHICLE DAMAGE INSPECTION REPORT

AIG Asia Pacific Insurance Pte. Ltd.
AIG Building, 78 Shenton Way #07-16
Singapore 079120
Our File No:CS/AIG21006236/EQF3N2
Date:03/06/2021

REFERENCE
Insured/Claimant:JONAS LIM GUO JIANN Policy No:2070008057
Date of Loss:29/05/2021 Nature of Claim:OD Claim No: 0579379644SG

DESCRIPTION & IDENTIFICATION OF VEHICLE
Reg No:SMR7746L
Make & Model:MITSUBISHI OUTLANDER, 2.0 (A) Engine No:4J11BK4228
Reg. Date:21/01/2020 (Man. Year: 2019) Chassis No: GF7W0602079
Colour:Brown Odometer:14641 km
Engine Capacity:1998 cc
Market Value/New Car Price:S$107,000.00
Sum Insured (S$):Market Value/New Car Price

CONDITION OF VEHICLE AT THE TIME OF SURVEY
General Condition: Steering (Serviceable):Yes Footbrake (Serviceable):Yes
Handbrake (Serviceable):Yes Engine Modification:No Pre-accident Condition:

CONDITION OF TYRES
Front Tyre Size:225/55R18 Rear Tyre Size:225/55R18
Front Left Side: Toyo  4 mm Rear Left Side: Toyo  4 mm
Front Right Side:Toyo  4 mm Rear Right Side:Toyo  4 mm
The above values represent the remaining tyre treads depth

COST OF CLAIMS Repairer's Adjuster's DifferenceDiff %
Parts 5,300.00 2,805.00 2,495.00 47.08
Miscellaneous Items 0.00 0.00 0.00  
Labour 4,560.00 2,645.00 1,915.00 42.00
Paintwork Labour 0.00 0.00 0.00  
Towing 0.00 0.00 0.00  
  
Gross Total (S$) 9,860.00 5,450.00 4,410.00 44.73
+ GST 7.00/7.00% (S$) 690.20 381.50 308.70 44.73
  
Nett Amount (S$) 10,550.20 5,831.50 4,718.70 44.73
  

INSPECTION
Date of Assignment:31/05/2021
Date Inspected:31/05/2021 Inspected At:Cycle & Carriage Automotive Pte Ltd (Pandan Gardens)
209 Pandan Gardens
Singapore 609339
Estimated Period of Repair:5.0 days



Adjuster: CHEN TSUE YEE   Manager: SHIAU CHAN
 
NOTE: This report represents our findings at the time and place of inspection stated herein. Such inspection has been carried out to the best of our knowledge and ability but any other liability under any other circumstances is hereby expressly excluded.

 
(REPAIR COST NOT CONCLUDE)
(EXCLUDE CHECK ITEMS S$1,428.00 NETT)
 
 
REPAIR DETAILS


Recommended Parts
Report was unsubmitted during this print-out.
No.Qty Part No. Particulars Condition Repairer's Amount

1 1 *SUNDRY Necessary 20.00 FS *20.00 FS
2 1 *FENDER, FR LH Dented 622.00 FS *622.00 FS
3 1 *PANEL ASSY, FR DOOR, LH Dented 982.00 FS *982.00 FS
4 1 *HINGE, FR DOOR, LWR LH * Check 43.00 FS *- FS
5 1 *HINGE, FR DOOR, LWR RH * Check 43.00 FS *- FS
6 1 *REGULATOR, FR DOOR WDO, LH * Check 178.00 FS *- FS
7 1 *MOTOR, F/DR POWER WDO REG, L * Check 457.00 FS *- FS
8 1 *BASE, F/DR OUTSIDE HDLE, LH Cut 135.00 FS *135.00 FS
9 1 *GASKET, F/DR OUTSIDE HANDLE Necessary 6.00 FS *6.00 FS
10 1 *COVER, F/DR OUTS HANDLE, LH Missing 50.00 FS *50.00 FS
11 1 *HANDLE, RR DOOR OUTSIDE, LH Not Necessary 93.00 FS *- FS
12 1 *LATCH, FR DOOR, LH * Check 322.00 FS *- FS
13 1 *CHECK, FR DOOR * Check 31.00 FS *- FS
14 1 *PANEL ASSY, RR DOOR, LH Dented 864.00 FS *864.00 FS
15 1 *TAPE, FR DOOR SASH, LH Necessary 42.00 FS *42.00 FS
16 1 *TAPE, RR DOOR SASH Necessary 42.00 FS *42.00 FS
17 1 *TAPE, RR DOOR SASH Necessary 42.00 FS *42.00 FS
18 1 *GARNISH, FR DOOR, LH * Check 190.00 FS *- FS
19 1 *GARNISH, RR DOOR, LH * Check 164.00 FS *- FS
20 1 *WHEEL, DISC Not Necessary 974.00 FS *- FS
F=Franchise part. S=SpcNett.
Total Parts (S$) 5,300.00 2,805.00
 
 
Recommended Miscellaneous Items
There are no new miscellaneous items selected.

Recommended Labour
Report was unsubmitted during this print-out.
NoParticulars Lab.Type Repairer's Amount

Labour Items
1 RENEW FRT FENDER LH, FRT DOOR LH, REAR DOOR LH New 1,920.00 1,125.00
2 SPRAY PAINT FOR FRT FENDER LH, FRT DOOR LH, REAR DOOR LH New 1,650.00 1,050.00
3 REMOVE & INSTALL FRT DOOR TRIMS, GLASS AND OTHERS New 300.00 120.00
4 REMOVE & INSTALL REAR DOOR TRIMS, GLASS AND OTHERS New 300.00 120.00
5 APPLY SEALANT FOR ACCIDENT PORTION New 80.00 80.00
6 CHECK WIRING & ELECTRICAL SYSTEM New 30.00 30.00
7 TO CARRY OUT DIAGNOSTIC CHECK USING HI-SCAN PRO TEST USING HI-SCAN PRO TEST New 280.00 120.00
 
Gross Labour Cost (S$) 4,560.002,645.00
 

< END OF ESTIMATES >