Adjuster Report
VEHICLE DAMAGE INSPECTION REPORT
|
AIG Asia Pacific Insurance Pte. Ltd. AIG Building, 78 Shenton Way #07-16 Singapore 079120 |
Our File No: | CS/AIG21006136/ETF3N2 |
| Date: | 07/07/2021 |
REFERENCE |
| Insured/Claimant: | HUANG YING |
Policy No: | 2100424779 |
| Date of Loss: | 25/05/2021 |
Nature of Claim: | OD |
Claim No: |
9289985524SG
|
| DESCRIPTION & IDENTIFICATION OF VEHICLE |
| Reg No: | SKU7703T |
| Make & Model: | KIA SPORTAGE, 2.0 (A) |
Engine No: | G4NAFH826744 |
| Reg. Date: | 17/08/2015 (Man. Year: 2015) |
Chassis No: |
KNAPC81AMF7779063 |
| Colour: | Silver |
Odometer: | 100236 km |
| Engine Capacity: | 1999 cc |
| Market Value/New Car Price: | S$56,000.00 |
| Sum Insured (S$): | Market Value/New Car Price |
| CONDITION OF VEHICLE AT THE TIME OF SURVEY |
| General Condition: | |
Steering (Serviceable): | Yes | Footbrake (Serviceable): | Yes |
| Handbrake (Serviceable): | Yes |
Engine Modification: | No |
Pre-accident Condition: | |
| CONDITION OF TYRES |
| Front Tyre Size: | 225/60R17 |
Rear Tyre Size: | 225/60R17 |
|
Front Left Side:
| Kumho 5 mm | |
Rear Left Side:
| Kumho 5 mm | |
| Front Right Side: | Kumho 5 mm | |
Rear Right Side: | Kumho 5 mm | |
| The above values represent the remaining tyre treads depth |
| Parts |
2,287.80 |
2,097.60
|
190.20 |
8.31 |
| Miscellaneous Items |
0.00 |
0.00 |
0.00 |
|
| Labour |
3,190.00 |
1,770.00 |
1,420.00 |
44.51 |
| Paintwork Labour |
0.00 |
0.00 |
0.00 |
|
| Towing |
0.00 |
0.00 |
0.00 |
|
| | |
|
Calculated Gross Total
(S$)
|
5,477.80 |
3,867.60 |
1,610.20 |
29.40 |
| - Excess (S$) |
600.00 |
600.00 |
0.00 |
0.00 |
| | |
| (S$) |
4,877.80 |
3,267.60 |
1,610.20 |
33.01 |
| +
GST 7.00/7.00% (S$)
|
341.45 |
228.73 |
112.72 |
33.01 |
| | |
| Nett Amount (S$) |
5,219.25 |
3,496.33 |
1,722.92 |
33.01 |
| | |
| INSPECTION |
| Date of Assignment: | 25/05/2021 |
| Date Inspected: | 25/05/2021 |
Inspected At: | Cycle & Carriage Automotive Pte Ltd (Pandan Gardens) 209 Pandan Gardens Singapore 609339 |
| Estimated Period of Repair: | 4.0 days |
| Adjuster: |
CHEN TSUE YEE |
|
Manager:
|
DENISE TAY KWEE CHENG
|
|
|
|
|
|
|
NOTE: This report represents our findings at the time and place of inspection stated herein. Such inspection has been carried out to the best of our knowledge and ability but any other liability under any other circumstances is hereby expressly excluded.
|
Recommended Parts
| Report was unsubmitted during this print-out. |
| No. | Qty |
Part No. |
Particulars |
Condition | Repairer's | |
Amount |
|
| 1 |
1 |
|
*PANEL ASSY-FRONT DOOR,RH |
Dented |
1,115.00 |
FL |
*1,115.00 |
FL |
| 2 |
1 |
|
*PANEL ASSY-REAR DOOR,RH |
Dented |
891.00 |
FL |
*891.00 |
FL |
| 3 |
1 |
|
*TAPE-FR DR BLACK FRAME RR RH |
Necessary |
26.00 |
FL |
*26.00 |
FL |
| 4 |
1 |
|
*TAPE-RR DR BLACK FRAME FR RH |
Necessary |
25.00 |
FL |
*25.00 |
FL |
| 5 |
1 |
|
*BLACK TAPE-FR DR FRAME UPR,RH |
Necessary |
26.00 |
FL |
*26.00 |
FL |
| 6 |
1 |
|
*BLACK TAPE-RR DR FRAME UPR,RH |
Necessary |
22.00 |
FL |
*22.00 |
FL |
| 7 |
1 |
|
*GARNISH ASSY-QTR SIDE,RH |
Cut |
125.00 |
FL |
*125.00 |
FL |
| 8 |
1 |
|
*MOULDING ASSY-SIDE SILL,RH |
Cut |
320.00 |
FL |
*320.00 |
FL |
| 9 |
1 |
|
*GARNISH ASSY-RR DR RR FRAME,RH |
Not Necessary |
116.00 |
FL |
*- |
FL |
| 10 |
1 |
|
*W/STRIP ASSY-FR DR BELT O/S RH |
Not Necessary |
53.00 |
FL |
*- |
FL |
| 11 |
1 |
|
*SUNDRIES |
Necessary |
50.00 |
FS |
*20.00 |
FS |
| 12 |
1 |
|
*RH ANTI-FILM |
Not Necessary |
25.00 |
FS |
*- |
FS |
| 13 |
1 |
|
*CLIPS (X10) Supplementary |
Necessary |
30.00 |
FL |
*30.00 |
FL |
| 14 |
1 |
|
*FILM-RR DR ANTI CHIPPING,RH Supplementary |
Necessary |
17.00 |
FL |
*17.00 |
FL |
| F=Franchise part. S=SpcNett. L=ListItemDisc. |
|
| Sub Total (S$) | 2,841.00 | |
2,617.00
| |
| - List Item Discount on L Items 20.00/20.00% (S$) |
553.20 | | 519.40 | |
| |
|
| Total Parts (S$) |
2,287.80 | | 2,097.60 | |
| |
|
Recommended Miscellaneous Items
There are no new miscellaneous items selected. |
Recommended Labour
| Report was unsubmitted during this print-out. |
| No | Particulars |
Lab.Type | Repairer's | Amount |
|
| Labour Items |
| 1 |
REPLACE RH FRT & REAR DOOR,RH ROCKER PANEL & AFFECTED AREAS |
New |
1,600.00 | 680.00 |
| 2 |
SPRAY PAINT WORK ON RH FRT & REAR DOOR |
New |
1,120.00 | 700.00 |
| 3 |
TO TRANSFER RH FRT & REAR ATTACHMENTS TO NEW PANEL |
New |
240.00 | 240.00 |
| 4 |
TO PERFORM RUST PREVENTION |
New |
80.00 | 0.00 |
| 5 |
CHECK ON WIRING & CHASSIS ELECTRICAL SYSTEM |
New |
30.00 | 30.00 |
| 6 |
TO CARRY OUT DIAGNOSTIC CHECK USING HI-SCAN PRO TEST USING HI-SCAN PRO TEST |
New |
120.00 | 120.00 |
| |
|
| Gross Labour Cost (S$) |
3,190.00 | 1,770.00 |
| |
|
< END OF ESTIMATES >