Printing Options
 Hide Company Header - Leave lines blank
 Print continuously - Do not break pages
Adjuster Report
LKK Auto Consultants Pte Ltd (Co.Reg.No:199607198R)
51 Ubi Ave 1 #01-25, Paya Ubi Industrial Park
Singapore 408933
Tel: 6256-3561  Fax: 6844-8805   Email: sur@lkkauto.com;assignments@lkkauto.com

VEHICLE DAMAGE INSPECTION REPORT

  Our File No:CC3/MSG21006048/UVF3N2
Date:03/06/2021

REFERENCE
Handling Insurer:MSIG Insurance (Singapore) Pte. Ltd. Policy No:30001622721
Claimant Vehicle No : PA6860AInsured Vehicle No : SLQ2114K
Date of Loss:21/05/2021 Nature of Claim:TP Claim No: 257875

DESCRIPTION & IDENTIFICATION OF VEHICLE
Reg No:PA6860A
Make & Model:ISUZU LT134P, 7.8 D (A) Engine No:6HK1450858
Reg. Date:12/06/2007 (Man. Year: 2007) Chassis No: JALLT134P77000082
Colour:Multi-colour Odometer:480595 km
Engine Capacity:7790 cc
Market Value/New Car Price:N/A
Sum Insured (S$):Market Value/New Car Price

CONDITION OF VEHICLE AT THE TIME OF SURVEY
General Condition: Steering (Serviceable):Yes Footbrake (Serviceable):Yes
Handbrake (Serviceable):Yes Engine Modification:No Pre-accident Condition:

CONDITION OF TYRES
Front Tyre Size:275/80 R22.5 Rear Tyre Size:275/80 R22.5(D)
Front Left Side: Pirelli  6 mm Rear Left Side: Pirelli  6/6 mm
Front Right Side:Pirelli  6 mm Rear Right Side:Pirelli  6/6 mm
The above values represent the remaining tyre treads depth

COST OF CLAIMS Repairer's Adjuster's DifferenceDiff %
Parts 26,150.00 6,763.50 19,386.50 74.14
Miscellaneous Items 0.00 0.00 0.00  
Labour 5,950.00 2,270.00 3,680.00 61.85
Paintwork Labour 0.00 0.00 0.00  
Towing 0.00 0.00 0.00  
  
Calculated Gross Total (S$) 32,100.00 9,033.50 23,066.50 71.86
Approved Total (Overridden) (S$) 7,200.00
  
(S$) 32,100.00 7,200.00 24,900.00 77.57
+ GST 7.00/7.00% (S$) 2,247.00 504.00 1,743.00 77.57
  
Nett Amount (S$) 34,347.00 7,704.00 26,643.00 77.57
  

INSPECTION
Date of Assignment:25/05/2021
Date Inspected:21/05/2021 Inspected At:Fastech Auto Pte Ltd (HQ)
1 Kaki Bukit Ave 6, #01-46/48/50 Autobay
Singapore 417883
Estimated Period of Repair:4.0 days



Adjuster: MARCUS CHUA   Manager: VERON CHEN
 
NOTE: This report represents our findings at the time and place of inspection stated herein. Such inspection has been carried out to the best of our knowledge and ability but any other liability under any other circumstances is hereby expressly excluded.

 
REPAIR DETAILS
Reference
Part Source: (Last Synchronised: 03 Jun 2021)
Parts:N/AISUZU LT134P 7.8 D (A) (Model not available in database)
Labour:Repairer's(Price-denominated Standard List) 
Print Code:(Unsubmitted, no print-code for PA6860A)
Validity:These estimates are valid only if they contain the print code (above) on all estimate pages, running page numbers with the END OF ESTIMATES marker on the last estimate page
Further Info:Items/values not in reference catalogue are prefixed with an asterisk *.


Recommended Parts
Report was unsubmitted during this print-out.
No.Qty Part No. Particulars Condition Repairer's Amount

1 1 *FRONT BUMPER DOME Cracked 4,850.00 F *2,050.00 FL
2 1 *FRONT SIGNAL LAMP N/S Scratched 265.00 F *185.00 FL
3 1 *FRONT SIDE LAMP N/S Not Necessary 250.00 F *- FL
4 1 *HEADLAMP N/S Not Necessary 980.00 F *- FL
5 1 *FRONT DOOR N/S Dented/Warped 4,580.00 F *3,280.00 FL
6 1 *FRONT DOOR RUBBER N/S (FRT) Torn 650.00 F *600.00 FL
7 1 *FRONT DOOR RUBBER N/S (REAR) Cut 650.00 F *600.00 FL
8 1 *FRONT DOOR PILLAR ALUMINIUM PLATE N/S (FRT) Distorted 800.00 F *800.00 FL
9 1 *FRONT DOOR PILLAR ALUMINIUM PLATE N/S (REAR) Repair 800.00 F *- FL
10 1 *FRONT DOOR PUMP ASST N/S Serviceable 2,500.00 F *- FL
11 1 *FRONT DOOR OPENING LEVEL N/S Not Necessary 625.00 F *- FL
12 1 *REAR COMPARTMENT DOOR N/S (CRACKED) Not Consistent With The Impact 4,650.00 F *- FL
13 1 *REAR COMPARTMENT DOOR NO 2 N/S Not Necessary 4,550.00 F *- FL
F=Franchise part. L=ListItemDisc.
Sub Total (S$)26,150.00 7,515.00
- List Item Discount on L Items 0.00/10.00% (S$) 0.00751.50
 
Total Parts (S$) 26,150.00 6,763.50
 
 
Recommended Miscellaneous Items
There are no new miscellaneous items selected.

Recommended Labour
Report was unsubmitted during this print-out.
NoParticulars Lab.Type Repairer's Amount

Labour Items
1 TO CHECK WIRING New 50.00 20.00
2 TO SPRAY RUST PROOFING New 100.00 0.00
3 LABOUR FOR PANEL BEATING & REPLACED PARTS New 2,800.00 1,400.00
4 TO PUTTY & SPRAY PAINTING New 3,000.00 850.00
 
Gross Labour Cost (S$) 5,950.002,270.00
 

< END OF ESTIMATES >