Adjuster Report
VEHICLE DAMAGE INSPECTION REPORT
|
| |
Our File No: | CS/CTI21006045/KVCN2 |
| Date: | 11/06/2021 |
REFERENCE |
| Handling Insurer: | China Taiping Insurance (Singapore) Pte. Ltd. |
Policy No: | DMPCSNA00118032004 |
| Claimant Vehicle No : | SKW88X | Insured Vehicle No : | SLG1779B |
| Date of Loss: | 10/05/2021 |
Nature of Claim: | TP |
Claim No: |
SNM21D202740/C02/THAMYL
|
| DESCRIPTION & IDENTIFICATION OF VEHICLE |
| Reg No: | SKW88X |
| Make & Model: | MERCEDES-BENZ S400L, 3.0 (A) |
Engine No: | 27682430488605 |
| Reg. Date: | 03/01/2017 (Man. Year: 2016) |
Chassis No: |
WDD2221652A296648 |
| Colour: | Metallic Brown |
Odometer: | 47262 km |
| Engine Capacity: | 2996 cc |
| Market Value/New Car Price: | N/A |
| Sum Insured (S$): | Market Value/New Car Price |
| CONDITION OF VEHICLE AT THE TIME OF SURVEY |
| General Condition: | |
Steering (Serviceable): | Yes | Footbrake (Serviceable): | Yes |
| Handbrake (Serviceable): | Yes |
Engine Modification: | No |
Pre-accident Condition: | |
| CONDITION OF TYRES |
| Front Tyre Size: | 245/45R19 |
Rear Tyre Size: | 245/45R19 |
|
Front Left Side:
| Pirelli 8 mm | |
Rear Left Side:
| Pirelli 8 mm | |
| Front Right Side: | Pirelli 8 mm | |
Rear Right Side: | Pirelli 8 mm | |
| The above values represent the remaining tyre treads depth |
| Parts |
2,280.00 |
2,055.50
|
224.50 |
9.85 |
| Miscellaneous Items |
0.00 |
0.00 |
0.00 |
|
| Labour |
990.00 |
715.00 |
275.00 |
27.78 |
| Paintwork Labour |
0.00 |
0.00 |
0.00 |
|
| Towing |
0.00 |
0.00 |
0.00 |
|
| | |
| Gross Total (S$) |
3,270.00 |
2,770.50 |
499.50 |
15.28 |
| +
GST 7.00/7.00% (S$)
|
228.90 |
193.94 |
34.96 |
15.27 |
| | |
| Nett Amount (S$) |
3,498.90 |
2,964.44 |
534.46 |
15.28 |
| | |
| INSPECTION |
| Date of Assignment: | 21/05/2021 |
| Date Inspected: | 24/05/2021 |
Inspected At: | Ready Auto Care Pte Ltd (HQ) Blk 10 Ang Mo Kio Industrial Park 2A, #03-06, AMK Auto Point Singapore 568047 |
| Estimated Period of Repair: | 2.0 days |
| Adjuster: |
KENNETH KONG |
|
Manager:
|
VERON CHEN
|
|
|
|
|
|
|
NOTE: This report represents our findings at the time and place of inspection stated herein. Such inspection has been carried out to the best of our knowledge and ability but any other liability under any other circumstances is hereby expressly excluded.
|
Reference |
| Part Source: | MRM-SG | Version: 1.0 (Last Synchronised: 11 Jun 2021) |
| Parts: | 143 | MERCEDES-BENZ S400L 3.0 (A) (Catalogue:Merimen Singapore 1.0) |
| Labour: | Repairer's | (Price-denominated Standard List) | |
| Print Code: | (Unsubmitted, no print-code for SKW88X) |
| Validity: | These estimates are valid only if they contain the print code (above) on all estimate pages, running page numbers with the END OF ESTIMATES marker on the last estimate page |
| Further Info: | Items/values not in reference catalogue are prefixed with an asterisk *. |
Recommended Parts
| Report was unsubmitted during this print-out. |
| No. | Qty |
Part No. |
Particulars |
Condition | Repairer's | |
Amount |
|
| 1 |
1 |
|
*REAR BUMPER |
Dented/Cracked |
2,245.00 |
F |
*2,245.00 |
FL |
| 2 |
1 |
|
*REAR BUMPER REINFORCEMENT (NPA) |
Repair |
0.00 |
F |
*- |
FL |
| 3 |
1 |
|
*SET REAR BUMPER CLIPS |
Necessary |
35.00 |
FS |
*35.00 |
FS |
| F=Franchise part. S=SpcNett. L=ListItemDisc. |
|
| Sub Total (S$) | 2,280.00 | |
2,280.00
| |
| - List Item Discount on L Items 0.00/10.00% (S$) |
0.00 | | 224.50 | |
| |
|
| Total Parts (S$) |
2,280.00 | | 2,055.50 | |
| |
|
Recommended Miscellaneous Items
There are no new miscellaneous items selected. |
Recommended Labour
| Report was unsubmitted during this print-out. |
| No | Particulars |
Lab.Type | Repairer's | Amount |
|
| Labour Items |
| 1 |
TO REMOVE ALL DAMAGED PARTS,KNOCK OUT DENTS,JACK OUT DAMAGED PANEL PANEL,ADJUST,REPLACE,RESHAPE,CUT,WELD,REFIX & REALIGN BODY STRUCTURE |
New |
380.00 | 300.00 |
| 2 |
SPRAY PAINTING FOR NEW AND REPAIR PARTS INCLUDING SUPPLY OF PAINTS MATERIALS |
New |
350.00 | 280.00 |
| 3 |
COMPUTER DIAGNOSE TO RESET PARKING SENSOR FALSE MEMORY |
New |
150.00 | 120.00 |
| 4 |
CHECK WIRING,LIGHTING SYSTEM FOR PROPER FUNCTION |
New |
50.00 | 15.00 |
| 5 |
CAVITY PRESERVATION ON ALL AFFECTED AREAS |
New |
60.00 | 0.00 |
| |
|
| Gross Labour Cost (S$) |
990.00 | 715.00 |
| |
|
< END OF ESTIMATES >