Adjuster Report
VEHICLE DAMAGE INSPECTION REPORT
|
| |
Our File No: | CS/MSG21005735/KQF3N2 |
| Date: | 02/06/2021 |
REFERENCE |
| Handling Insurer: | MSIG Insurance (Singapore) Pte. Ltd. |
Policy No: | 1001407266 |
| Claimant Vehicle No : | GBC9856Z | Insured Vehicle No : | SBZ7487Y |
| Date of Loss: | 09/05/2021 |
Nature of Claim: | TP |
Claim No: |
257070
|
| DESCRIPTION & IDENTIFICATION OF VEHICLE |
| Reg No: | GBC9856Z |
| Make & Model: | TOYOTA DYNA 150, 3.0 D (M) |
Engine No: | 1KD2378155 |
| Reg. Date: | 04/04/2014 (Man. Year: 2014) |
Chassis No: |
JTFAT35Y00K202845 |
| Colour: | Silver |
Odometer: | 282060 km |
| Engine Capacity: | 2982 cc |
| Market Value/New Car Price: | N/A |
| Sum Insured (S$): | Market Value/New Car Price |
| CONDITION OF VEHICLE AT THE TIME OF SURVEY |
| General Condition: | |
Steering (Serviceable): | Yes | Footbrake (Serviceable): | Yes |
| Handbrake (Serviceable): | Yes |
Engine Modification: | No |
Pre-accident Condition: | |
| CONDITION OF TYRES |
| Front Tyre Size: | 195R15X8 |
Rear Tyre Size: | 155R12X8(D) |
|
Front Left Side:
| Bridgestone 9 mm | |
Rear Left Side:
| Bridgestone 9/9 mm | |
| Front Right Side: | Bridgestone 9 mm | |
Rear Right Side: | Bridgestone 9/9 mm | |
| The above values represent the remaining tyre treads depth |
| Parts |
3,442.90 |
2,542.17
|
900.73 |
26.16 |
| Miscellaneous Items |
0.00 |
0.00 |
0.00 |
|
| Labour |
1,900.00 |
1,060.00 |
840.00 |
44.21 |
| Paintwork Labour |
0.00 |
0.00 |
0.00 |
|
| Towing |
0.00 |
0.00 |
0.00 |
|
| | |
| Calculated Gross Total (S$) |
5,342.90 |
3,602.17 |
1,740.73 |
32.58 |
| Approved Total (Overridden) (S$) |
|
2,850.00 |
| | |
| Nett Amount (S$) |
5,342.90 |
2,850.00 |
2,492.90 |
46.66 |
| | |
| INSPECTION |
| Date of Assignment: | 11/05/2021 |
| Date Inspected: | 12/05/2021 |
Inspected At: | BLK 176 SIN MING DRIVE #05-03 SIN MING AUTOCARE SINGAPORE 575721 REPAIRER: CHOON HOCK MOTOR TRADING CO |
| Estimated Period of Repair: | 4.0 days |
| Adjuster: |
KENNETH KONG |
|
Manager:
|
SHIAU CHAN
|
|
|
|
|
|
|
NOTE: This report represents our findings at the time and place of inspection stated herein. Such inspection has been carried out to the best of our knowledge and ability but any other liability under any other circumstances is hereby expressly excluded.
|
|
|
(REPAIR COST NOT CONCLUDE)
|
| |
Reference |
| Part Source: | | (Last Synchronised: 30 May 2021) |
| Parts: | N/A | TOYOTA DYNA 150 3.0 D (M) (Model not available in database) |
| Labour: | Repairer's | (Price-denominated Standard List) | |
| Print Code: | (Unsubmitted, no print-code for GBC9856Z) |
| Validity: | These estimates are valid only if they contain the print code (above) on all estimate pages, running page numbers with the END OF ESTIMATES marker on the last estimate page |
| Further Info: | Items/values not in reference catalogue are prefixed with an asterisk *. |
Recommended Parts
| Report was unsubmitted during this print-out. |
| No. | Qty |
Part No. |
Particulars |
Condition | Repairer's | |
Amount |
|
| 1 |
1 |
|
*FRONT HEADLAMP RH |
Cut |
845.00 |
F |
*845.00 |
FL |
| 2 |
1 |
|
*FRONT BUMPER ASSY |
Buckled |
555.90 |
F |
*555.90 |
FL |
| 3 |
1 |
|
*FRONT DOOR RH |
Bent |
1,580.00 |
F |
*1,580.00 |
FL |
| 4 |
1 |
|
*FRONT DOOR LOWER HINGE RH |
Repair |
60.00 |
F |
*- |
FL |
| 5 |
1 |
|
*STEP PANEL RH |
Dented/Cut |
102.00 |
F |
*102.00 |
FL |
| 6 |
1 |
|
*FRONT GRILLE ASSY |
Mtg Cracked |
280.00 |
F |
*280.00 |
FL |
| 7 |
1 |
|
*STICKER-COMPANY ADDRESS |
Necessary |
20.00 |
FS |
*20.00 |
FS |
| F=Franchise part. S=SpcNett. L=ListItemDisc. |
|
| Sub Total (S$) | 3,442.90 | |
3,382.90
| |
| - List Item Discount on L Items 0.00/25.00% (S$) |
0.00 | | 840.73 | |
| |
|
| Total Parts (S$) |
3,442.90 | | 2,542.17 | |
| |
|
Recommended Miscellaneous Items
There are no new miscellaneous items selected. |
Recommended Labour
| Report was unsubmitted during this print-out. |
| No | Particulars |
Lab.Type | Repairer's | Amount |
|
| Labour Items |
| 1 |
REMOVE DOORS FITTINGS,REFIT |
New |
100.00 | 60.00 |
| 2 |
WIRINGS |
New |
120.00 | 20.00 |
| 3 |
PANEL BEATING |
New |
800.00 | 400.00 |
| 4 |
SPRAY PAINTING |
New |
800.00 | 550.00 |
| 5 |
RUSTPROOFING |
New |
80.00 | 30.00 |
| |
|
| Gross Labour Cost (S$) |
1,900.00 | 1,060.00 |
| |
|
< END OF ESTIMATES >