Printing Options
 Hide Company Header - Leave lines blank
 Print continuously - Do not break pages
Adjuster Report
LKK Auto Consultants Pte Ltd (Co.Reg.No:199607198R)
51 Ubi Ave 1 #01-25, Paya Ubi Industrial Park
Singapore 408933
Tel: 6256-3561  Fax: 6844-8805   Email: sur@lkkauto.com;assignments@lkkauto.com

VEHICLE DAMAGE INSPECTION REPORT

  Our File No:CS/EGI21005672/DTF3N2
Date:31/05/2021

REFERENCE
Handling Insurer:ERGO Insurance Pte. Ltd. Policy No:
Claimant Vehicle No : SJJ7772MInsured Vehicle No : YP5022Z
Date of Loss:07/05/2021 Nature of Claim:TP Claim No: CDMCG21000870

DESCRIPTION & IDENTIFICATION OF VEHICLE
Reg No:SJJ7772M
Make & Model:MAZDA 6, 2.0 4-DOOR SEDAN 2.0L SP.6EAT (A) Engine No:PE20836181
Reg. Date:29/12/2016 (Man. Year: 2016) Chassis No: JM6GL1071H0104190
Colour:Blue Odometer:51479 km
Engine Capacity:1998 cc
Market Value/New Car Price:N/A
Sum Insured (S$):Market Value/New Car Price

CONDITION OF VEHICLE AT THE TIME OF SURVEY
General Condition: Steering (Serviceable):Yes Footbrake (Serviceable):Yes
Handbrake (Serviceable):Yes Engine Modification:No Pre-accident Condition:

CONDITION OF TYRES
Front Tyre Size:225/55R17 Rear Tyre Size:225/55R17
Front Left Side: Michelin  5 mm Rear Left Side: Michelin  5 mm
Front Right Side:Michelin  5 mm Rear Right Side:Michelin  5 mm
The above values represent the remaining tyre treads depth

COST OF CLAIMS Repairer's Adjuster's DifferenceDiff %
Parts 6,835.00 3,659.28 3,175.72 46.46
Miscellaneous Items 0.00 0.00 0.00  
Labour 1,940.00 900.00 1,040.00 53.61
Paintwork Labour 0.00 0.00 0.00  
Towing 0.00 0.00 0.00  
  
Calculated Gross Total (S$) 8,775.00 4,559.28 4,215.72 48.04
Approved Total (Overridden) (S$) 3,600.00
  
Nett Amount (S$) 8,775.00 3,600.00 5,175.00 58.97
  

INSPECTION
Date of Assignment:10/05/2021
Date Inspected:11/05/2021 Inspected At:Alfred Auto (HQ)
BLK 5035 ANG MO KIO 3 #01-351, ANG MO KIO INDUSTRIAL PARK 2
Singapore 569538
Estimated Period of Repair:4.0 days



Adjuster: BRYAN TANI   Manager: DENISE TAY KWEE CHENG
 
NOTE: This report represents our findings at the time and place of inspection stated herein. Such inspection has been carried out to the best of our knowledge and ability but any other liability under any other circumstances is hereby expressly excluded.

 
REPAIR DETAILS
Reference
Part Source:MRM-SGVersion: 1.0 (Last Synchronised: 28 May 2021)
Parts:143MAZDA 6 2.0 4-DOOR SEDAN 2.0L SP.6EAT (A) (Catalogue:Merimen Singapore 1.0)
Labour:Repairer's(Price-denominated Standard List) 
Print Code:(Unsubmitted, no print-code for SJJ7772M)
Validity:These estimates are valid only if they contain the print code (above) on all estimate pages, running page numbers with the END OF ESTIMATES marker on the last estimate page
Further Info:Items/values not in reference catalogue are prefixed with an asterisk *.


Recommended Parts
Report was unsubmitted during this print-out.
No.Qty Part No. Particulars Condition Repairer's Amount

1 1 *FRONT HEAD LAMP ASSY Cut/Scratched 3,390.00 F *3,390.00 FL
2 1 *FRONT HEAD LAMP BRACKET Not Necessary 298.00 F *- FL
3 1 *FRONT BUMPER Repair 998.00 F *- FL
4 1 *FRONT BUMPER RETAINER Serviceable 286.00 F *- FL
5 10 *FRONT BUMPER CLIPS Not Necessary 60.00 F *- FL
6 1 *FRONT LH FENDER Dented 399.00 F *399.00 FL
7 1 *FRONT LH FENDER DUST GARNISH Serviceable 214.00 F *- FL
8 10 *FRONT LH DUST GARNISH CLIPS Not Necessary 60.00 F *- FL
9 1 *FRONT LH DOOR MIRROR ASSY Damaged 1,130.00 F *785.10 FL
F=Franchise part. L=ListItemDisc.
Sub Total (S$)6,835.00 4,574.10
- List Item Discount on L Items 0.00/20.00% (S$) 0.00914.82
 
Total Parts (S$) 6,835.00 3,659.28
 
 
Recommended Miscellaneous Items
There are no new miscellaneous items selected.

Recommended Labour
Report was unsubmitted during this print-out.
NoParticulars Lab.Type Repairer's Amount

Labour Items
1 TO CHECK WIRING & REFOCUS HEAD LAMP New 120.00 30.00
2 TO KNOCKING,STRAIGHTENING REPAIR & RENEW ALL ACCIDENT AFFECTED AREA New 800.00 400.00
3 TO RESPRAY PAINTING ON ALL ACCIDENT DAMAGE AFFECTED AREA New 900.00 450.00
4 TO RUST PROOF ALL ACCIDENT AFFECTED AREA New 120.00 20.00
 
Gross Labour Cost (S$) 1,940.00900.00
 

< END OF ESTIMATES >