Printing Options
 Hide Company Header - Leave lines blank
 Print continuously - Do not break pages
Adjuster Report
LKK Auto Consultants Pte Ltd (Co.Reg.No:199607198R)
51 Ubi Ave 1 #01-25, Paya Ubi Industrial Park
Singapore 408933
Tel: 6256-3561  Fax: 6844-8805   Email: sur@lkkauto.com;assignments@lkkauto.com

VEHICLE DAMAGE INSPECTION REPORT

  Our File No:CS/CTI21005127/EVF3N2
Date:15/06/2021

REFERENCE
Handling Insurer:China Taiping Insurance (Singapore) Pte. Ltd. Policy No:DMPCSNA00152952001
Claimant Vehicle No : SKV9649ZInsured Vehicle No : SME7329B
Date of Loss:22/04/2021 Nature of Claim:TP Claim No: SNM21D202377/C02/LEWLC

DESCRIPTION & IDENTIFICATION OF VEHICLE
Reg No:SKV9649Z
Make & Model:NISSAN ELGRAND, 2.5 (A) Engine No:QR25384690L
Reg. Date:13/10/2015 (Man. Year: 2015) Chassis No: JN1TBAE52Z0802435
Colour:Brown Odometer:75222 km
Engine Capacity:2488 cc
Market Value/New Car Price:N/A
Sum Insured (S$):Market Value/New Car Price

CONDITION OF VEHICLE AT THE TIME OF SURVEY
General Condition: Steering (Serviceable):Yes Footbrake (Serviceable):Yes
Handbrake (Serviceable):Yes Engine Modification:No Pre-accident Condition:

CONDITION OF TYRES
Front Tyre Size:225/55R18 Rear Tyre Size:225/55R18
Front Left Side: Michelin  4 mm Rear Left Side: Michelin  4 mm
Front Right Side:Michelin  4 mm Rear Right Side:Michelin  4 mm
The above values represent the remaining tyre treads depth

COST OF CLAIMS Repairer's Adjuster's DifferenceDiff %
Parts 1,742.24 565.28 1,176.96 67.55
Miscellaneous Items 0.00 0.00 0.00  
Labour 1,778.00 780.00 998.00 56.13
Paintwork Labour 0.00 0.00 0.00  
Towing 0.00 0.00 0.00  
  
Gross Total (S$) 3,520.24 1,345.28 2,174.96 61.78
+ GST 7.00/7.00% (S$) 246.42 94.17 152.25 61.78
  
Nett Amount (S$) 3,766.66 1,439.45 2,327.21 61.78
  

INSPECTION
Date of Assignment:26/04/2021
Date Inspected:07/06/2021 Inspected At:TC AutoClinic Pte Ltd (Lok Yang)
1 SIXTH LOK YANG ROAD
Singapore 628099
Estimated Period of Repair:3.0 days



Adjuster: CHEN TSUE YEE   Manager: VERON CHEN
 
NOTE: This report represents our findings at the time and place of inspection stated herein. Such inspection has been carried out to the best of our knowledge and ability but any other liability under any other circumstances is hereby expressly excluded.

 
REPAIR DETAILS
Reference
Part Source: (Last Synchronised: 14 Jun 2021)
Parts:N/ANISSAN ELGRAND 2.5 (A) (Model not available in database)
Labour:Repairer's(Price-denominated Standard List) 
Print Code:(Unsubmitted, no print-code for SKV9649Z)
Validity:These estimates are valid only if they contain the print code (above) on all estimate pages, running page numbers with the END OF ESTIMATES marker on the last estimate page
Further Info:Items/values not in reference catalogue are prefixed with an asterisk *.


Recommended Parts
Report was unsubmitted during this print-out.
No.Qty Part No. Particulars Condition Repairer's Amount

1 1 *WSTRIP ASSY-FRONT DOOR,RH Not Necessary 150.10 FN *- FN
2 1 *TAPE-FRONT DOOR OUTSIDE,RH Not Necessary 19.50 FN *- FN
3 1 *TAPE-FRONT DOOR SASH,RH Not Necessary 65.00 FN *- FN
4 1 *TAPE-FRONT DOOR SASH,RH Not Necessary 32.50 FN *- FN
5 1 *DOOR-FRONT RH Repair 1,204.10 FN *- FN
6 1 *FENDER-FRONT RH Dented 706.60 FN *706.60 FN
F=Franchise part. N=NettItemDisc.
Sub Total (S$)2,177.80 706.60
- Nett Item Discount on N Items 20.00/20.00% (S$) 435.56141.32
 
Total Parts (S$) 1,742.24 565.28
 
 
Recommended Miscellaneous Items
There are no new miscellaneous items selected.

Recommended Labour
Report was unsubmitted during this print-out.
NoParticulars Lab.Type Repairer's Amount

Labour Items
1 FOCUS & ADJUST H/LAMP,RESET HORIZONTAL & VERTICAL ALIGNMENT TO FACTORY SPECIFICATION New 48.00 0.00
2 APPLY SEALANT TO ALL AFFECTED PANEL JOINTS & RESEAL NECESSARY AREA New 100.00 0.00
3 REMOVE/INSTALL RH FRONT FENDER,RH FRONT DOOR AND AFFECTED PORTION New 560.00 280.00
4 RESPRAY PAINT RH FRONT FENDER AND RH FRONT DOOR New 750.00 500.00
5 TRANSFER RH FRONT DOOR MECHANISM TO NEW DOOR AND CHECK DOOR CENTRAL LOCKING SYSTEM New 80.00 0.00
6 TO DISCONNECT AND CONNECT VEHICLE MAIN ELECTRICAL POWER TO FACILITATE THE REPAIR New 240.00 0.00
 
Gross Labour Cost (S$) 1,778.00780.00
 

< END OF ESTIMATES >