Printing Options
 Hide Company Header - Leave lines blank
 Print continuously - Do not break pages
Adjuster Report
LKK Auto Consultants Pte Ltd (Co.Reg.No:199607198R)
51 Ubi Ave 1 #01-25, Paya Ubi Industrial Park
Singapore 408933
Tel: 6256-3561  Fax: 6844-8805   Email: sur@lkkauto.com;assignments@lkkauto.com

VEHICLE DAMAGE INSPECTION REPORT

  Our File No:CS/AIG21005101/AQF3N2
Date:16/07/2021

REFERENCE
Handling Insurer:AIG Asia Pacific Insurance Pte. Ltd. Policy No:
Claimant Vehicle No : FBM857CInsured Vehicle No : GBC5772H
Date of Loss:01/12/2020 Nature of Claim:TP Claim No: 1346912506SG

DESCRIPTION & IDENTIFICATION OF VEHICLE
Reg No:FBM857C
Make & Model:HONDA CB400SF, 399cc Engine No:NC42E1207450
Reg. Date:13/07/2017 (Man. Year: 2016) Chassis No: NC421803031
Colour:White Odometer:138536 km
Engine Capacity:399 cc
Market Value/New Car Price:N/A
Sum Insured (S$):Market Value/New Car Price

CONDITION OF VEHICLE AT THE TIME OF SURVEY
General Condition: Steering (Serviceable):Yes Footbrake (Serviceable):Yes
Handbrake (Serviceable):Yes Engine Modification:No Pre-accident Condition:

CONDITION OF TYRES
Front Tyre Size:120/60R17 Rear Tyre Size:160/60R17
Front Left Side: Bridgestone  6 mm Rear Left Side: Bridgestone  6 mm
Front Right Side:  0 mm Rear Right Side:  0 mm
The above values represent the remaining tyre treads depth

COST OF CLAIMS Repairer's Adjuster's DifferenceDiff %
Parts 10,005.00 2,632.20 7,372.80 73.69
Miscellaneous Items 0.00 0.00 0.00  
Labour 1,900.00 530.00 1,370.00 72.11
Paintwork Labour 0.00 0.00 0.00  
Towing 0.00 0.00 0.00  
  
Calculated Gross Total (S$) 11,905.00 3,162.20 8,742.80 73.44
Approved Total (Overridden) (S$) 2,500.00
  
Nett Amount (S$) 11,905.00 2,500.00 9,405.00 79.00
  

INSPECTION
Date of Assignment:26/04/2021
Date Inspected:29/04/2021 Inspected At:Yi Heng Motor Workshop (HQ)
Blk 1 Kaki Bt Ave 6 #02-19
Singapore 417883
Estimated Period of Repair:4.0 days



Adjuster: ADRIAN LING   Manager: SHIAU CHAN
 
NOTE: This report represents our findings at the time and place of inspection stated herein. Such inspection has been carried out to the best of our knowledge and ability but any other liability under any other circumstances is hereby expressly excluded.

 
REPAIR DETAILS


Recommended Parts
Report was unsubmitted during this print-out.
No.Qty Part No. Particulars Condition Repairer's Amount

1 1 *FRONT FENDER Repair 280.00 FL *- FL
2 1 *FRONT FORK ASSEMBLY Not Necessary 1,900.00 FL *- FL
3 1 *FRONT SIGNAL LAMP (LH) Cracked 110.00 FL *58.00 FL
4 1 *HEADLAMP Not Necessary 480.00 FL *- FL
5 1 *SET HEADLAMP BRACKET Not Necessary 255.00 FL *- FL
6 2 *HEADLAMP INNER BRACKET Not Necessary 560.00 FL *- FL
7 1 *METER ASSEMBLY Cut 950.00 FL *950.00 FL
8 1 *METER BRACKET Not Necessary 320.00 FL *- FL
9 1 *HANDLE BAR Bent 180.00 FL *180.00 FL
10 1 *HANDLE BAR BALANCER Cut 65.00 FL *65.00 FL
11 1 *WING MIRROR (RH) Cut 280.00 FL *150.00 FL
12 1 *RADIATOR Not Necessary 1,140.00 FL *- FL
13 1 *RADIATOR ALUMINIUM GUARD (LH) Dented 85.00 FL *85.00 FL
14 1 *ENGINE SIDE GUARD O/s Bent 560.00 FL *280.00 FL
15 1 *FUEL TANK Repair 1,440.00 FL *- FL
16 1 *PILLION FOOT REST (LH) Cut 70.00 FL *45.00 FL
17 1 *BRAKE HANDLE Bent 45.00 FL *45.00 FL
18 1 *FRONT LICENCE PLATE Not Necessary 55.00 FS *- FS
19 1 *RADIATOR COOLANT Not Necessary 60.00 FS *- FS
20 1 *FORK OIL Not Necessary 60.00 FS *- FS
21 1 *FORK OIL SEAL Not Necessary 60.00 FS *- FS
22 1 *REAR BOX (ACCESSORIES) Cut 500.00 FS *280.00 FS
23 2 *FUEL TANK STICKER HONDA Necessary 117.00 FS *80.00 FS
24 1 *EXHAUST PIPE Dented 1,305.00 FS *600.00 FS
F=Franchise part. S=SpcNett. L=ListItemDisc.
Sub Total (S$)10,877.00 2,818.00
- List Item Discount on L Items 10.00/10.00% (S$) 872.00185.80
 
Total Parts (S$) 10,005.00 2,632.20
 
 
Recommended Miscellaneous Items
There are no new miscellaneous items selected.

Recommended Labour
Report was unsubmitted during this print-out.
NoParticulars Lab.Type Repairer's Amount

Labour Items
1 TO CHECK WIRING & LIGHTING SYSTEM New 120.00 30.00
2 TO REMOVE & REFIX FRONT FORK TUBES New 300.00 0.00
3 TO REPLACE,REALIGN,READJUST NEW PARTS New 800.00 250.00
4 TO RESPRAY ON THE AFFECTED AREAS New 680.00 250.00
 
Gross Labour Cost (S$) 1,900.00530.00
 

< END OF ESTIMATES >