Printing Options
 Hide Company Header - Leave lines blank
 Print continuously - Do not break pages
Adjuster Report
LKK Auto Consultants Pte Ltd (Co.Reg.No:199607198R)
51 Ubi Ave 1 #01-25, Paya Ubi Industrial Park
Singapore 408933
Tel: 6256-3561  Fax: 6844-8805   Email: sur@lkkauto.com;assignments@lkkauto.com

VEHICLE DAMAGE INSPECTION REPORT

  Our File No:CS/CTI21004980/R1QF3N2
Date:18/06/2021

REFERENCE
Handling Insurer:China Taiping Insurance (Singapore) Pte. Ltd. Policy No:DMPCSNW00039422100
Claimant Vehicle No : SLN7575XInsured Vehicle No : SMX9582Y
Date of Loss:16/04/2021 Nature of Claim:TP Claim No: SNM21D202235/C02/TAYHP

DESCRIPTION & IDENTIFICATION OF VEHICLE
Reg No:SLN7575X
Make & Model:PEUGEOT 5008, 1.2 ACTIVE PURETECH (A) Engine No:10XVAY1615640
Reg. Date:12/01/2021 (Man. Year: 2019) Chassis No: VF3MRHNSUKL145076
Colour:Black Odometer:6915 km
Engine Capacity:1199 cc
Market Value/New Car Price:N/A
Sum Insured (S$):Market Value/New Car Price

CONDITION OF VEHICLE AT THE TIME OF SURVEY
General Condition: Steering (Serviceable):Yes Footbrake (Serviceable):Yes
Handbrake (Serviceable):Yes Engine Modification:No Pre-accident Condition:

CONDITION OF TYRES
Front Tyre Size:225/55R18 Rear Tyre Size:225/55R18
Front Left Side: Michelin  9 mm Rear Left Side: Michelin  9 mm
Front Right Side:Michelin  9 mm Rear Right Side:Michelin  9 mm
The above values represent the remaining tyre treads depth

COST OF CLAIMS Repairer's Adjuster's DifferenceDiff %
Parts 3,175.30 3,095.30 80.00 2.52
Miscellaneous Items 0.00 0.00 0.00  
Labour 6,230.00 3,570.00 2,660.00 42.70
Paintwork Labour 0.00 0.00 0.00  
Towing 0.00 0.00 0.00  
  
Gross Total (S$) 9,405.30 6,665.30 2,740.00 29.13
+ GST 7.00/7.00% (S$) 658.37 466.57 191.80 29.13
  
Nett Amount (S$) 10,063.67 7,131.87 2,931.80 29.13
  

INSPECTION
Date of Assignment:20/04/2021
Date Inspected:03/05/2021 Inspected At:Performance Motors Limited (Alexandra)
303 Alexandra Road, Sime Darby Performance Centre
Singapore 159941
Estimated Period of Repair:4.0 days



Adjuster: XING GUO QIANG   Manager: SHIAU CHAN
 
NOTE: This report represents our findings at the time and place of inspection stated herein. Such inspection has been carried out to the best of our knowledge and ability but any other liability under any other circumstances is hereby expressly excluded.

 
REPAIR DETAILS
Reference
Part Source: (Last Synchronised: 18 Jun 2021)
Parts:N/APEUGEOT 5008 1.2 ACTIVE PURETECH (A) (Model not available in database)
Labour:Repairer's(Price-denominated Standard List) 
Print Code:(Unsubmitted, no print-code for SLN7575X)
Validity:These estimates are valid only if they contain the print code (above) on all estimate pages, running page numbers with the END OF ESTIMATES marker on the last estimate page
Further Info:Items/values not in reference catalogue are prefixed with an asterisk *.


Recommended Parts
Report was unsubmitted during this print-out.
No.Qty Part No. Particulars Condition Repairer's Amount

1 1 *FOGLAMP FINISHER SET Scratched 81.00 FS *81.00 FS
2 1 *FRONT WING MOULDING RH Scratched 189.00 FS *189.00 FS
3 1 *WEATHERSTRIP HEADLAMP Necessary 15.30 FS *15.30 FS
4 1 *BARE HEADLAMP RH Scratched 2,160.00 FS *2,160.00 FS
5 1 *ALLOY WHEEL 18 DETROIT BRILLANT Cut 630.00 FS *630.00 FS
6 1 *SUNDRIES Necessary 100.00 FS *20.00 FS
F=Franchise part. S=SpcNett.
Total Parts (S$) 3,175.30 3,095.30
 
 
Recommended Miscellaneous Items
There are no new miscellaneous items selected.

Recommended Labour
Report was unsubmitted during this print-out.
NoParticulars Lab.Type Repairer's Amount

Labour Items
1 TO REPAIR FRONT BUMPER,FRONT FENDER RH,BONNET & ALL AREAR AFFECTED BY THE ACCIDENT New 1,800.00 600.00
2 TO RESPRAY FRONT BUMPER,FRONT FENDER RH,BONNET New 2,400.00 1,800.00
3 TO TRANSFER FRONT PREDESTRIAN SENSOR New 300.00 0.00
4 TO MOUNT SPORT RIM AND CONDUCT WHEEL BALANCING New 250.00 120.00
5 TO CHECK STEERING GEOMETRY AND CONDUCT FULL ALIGNMENT New 600.00 300.00
6 TO REPROGRAMME ECU AND CLEAR FAULT CODE AFTER THE ACCIDENT REPAIR WORKS New 600.00 600.00
7 TO CHECK ELECTRICAL SYSTEM FOR PROPER FUNCTIONING New 280.00 150.00
 
Gross Labour Cost (S$) 6,230.003,570.00
 

< END OF ESTIMATES >