Printing Options
 Hide Company Header - Leave lines blank
 Print continuously - Do not break pages
Adjuster Report
LKK Auto Consultants Pte Ltd (Co.Reg.No:199607198R)
51 Ubi Ave 1 #01-25, Paya Ubi Industrial Park
Singapore 408933
Tel: 6256-3561  Fax: 6844-8805   Email: sur@lkkauto.com;assignments@lkkauto.com

VEHICLE DAMAGE INSPECTION REPORT

  Our File No:CS/MSG21004926/BQF3N2
Date:19/05/2021

REFERENCE
Handling Insurer:MSIG Insurance (Singapore) Pte. Ltd. Policy No:1001073657
Claimant Vehicle No : SMJ971RInsured Vehicle No : SKQ1393P
Date of Loss:19/04/2021 Nature of Claim:TP Claim No: 256228

DESCRIPTION & IDENTIFICATION OF VEHICLE
Reg No:SMJ971R
Make & Model:KIA CERATO, 1.6 EX (A) Engine No:G4FGJH720803
Reg. Date:22/02/2019 (Man. Year: 2018) Chassis No: KNAF3416MK5030541
Colour:Blue Odometer:23830 km
Engine Capacity:1591 cc
Market Value/New Car Price:N/A
Sum Insured (S$):Market Value/New Car Price

CONDITION OF VEHICLE AT THE TIME OF SURVEY
General Condition: Steering (Serviceable):Yes Footbrake (Serviceable):Yes
Handbrake (Serviceable):Yes Engine Modification:No Pre-accident Condition:

CONDITION OF TYRES
Front Tyre Size:205/55R16 Rear Tyre Size:205/55R16
Front Left Side: Nexen  6 mm Rear Left Side: Nexen  6 mm
Front Right Side:Nexen  6 mm Rear Right Side:Nexen  6 mm
The above values represent the remaining tyre treads depth

COST OF CLAIMS Repairer's Adjuster's DifferenceDiff %
Parts 4,028.20 2,397.90 1,630.30 40.47
Miscellaneous Items 0.00 0.00 0.00  
Labour 1,250.00 420.00 830.00 66.40
Paintwork Labour 0.00 0.00 0.00  
Towing 0.00 0.00 0.00  
  
Calculated Gross Total (S$) 5,278.20 2,817.90 2,460.30 46.61
Approved Total (Overridden) (S$) 2,250.00
  
(S$) 5,278.20 2,250.00 3,028.20 57.37
+ GST 7.00/7.00% (S$) 369.47 157.50 211.97 57.37
  
Nett Amount (S$) 5,647.67 2,407.50 3,240.17 57.37
  

INSPECTION
Date of Assignment:21/04/2021
Date Inspected:20/04/2021 Inspected At:Bifrost Auto Pte Ltd (Kaki Bukit)
8 Kaki Bukit Ave 4, #01-49, Premier @ Kaki Bukit
Singapore 415875
Estimated Period of Repair:4.0 days



Adjuster: Lim Teow Guan   Manager: SHIAU CHAN
 
NOTE: This report represents our findings at the time and place of inspection stated herein. Such inspection has been carried out to the best of our knowledge and ability but any other liability under any other circumstances is hereby expressly excluded.

 
REPAIR DETAILS
Reference
Part Source:MRM-SGVersion: 1.0 (Last Synchronised: 19 May 2021)
Parts:143KIA CERATO 1.6 EX (A) (Catalogue:Merimen Singapore 1.0)
Labour:Repairer's(Price-denominated Standard List) 
Print Code:(Unsubmitted, no print-code for SMJ971R)
Validity:These estimates are valid only if they contain the print code (above) on all estimate pages, running page numbers with the END OF ESTIMATES marker on the last estimate page
Further Info:Items/values not in reference catalogue are prefixed with an asterisk *.


Recommended Parts
Report was unsubmitted during this print-out.
No.Qty Part No. Particulars Condition Repairer's Amount

1 1 *FRONT BUMPER Broken 633.00 FL *633.00 FL
2 1 *FRONT BUMPER CENTRE GRILLE Cut 485.00 FL *485.00 FL
3 1 *FRONT BUMPER EMBLEM Necessary 32.00 FL *32.00 FL
4 1 *FRONT BUMPER RH SIGNAL LAMP Not Damaged 143.00 FL *- FL
5 1 *FRONT BUMPER RH SIGNAL LAMP COVER Not Damaged 36.00 FL *- FL
6 1 *FRONT BUMPER RH FOG LAMP Not Damaged 303.00 FL *- FL
7 1 *FRONT GRILLE ASSY Cut 328.00 FL *262.00 FL
8 1 *RH HEADLAMP ASSY Broken 1,219.00 FL *1,219.00 FL
9 1 *LH HEADLAMP ASSY Not Damaged 1,219.00 FL *- FL
10 1 *SET FRONT BUMPER CLIPS Necessary 70.00 FS *30.00 FS
F=Franchise part. S=SpcNett. L=ListItemDisc.
Sub Total (S$)4,468.00 2,661.00
- List Item Discount on L Items 10.00/10.00% (S$) 439.80263.10
 
Total Parts (S$) 4,028.20 2,397.90
 
 
Recommended Miscellaneous Items
There are no new miscellaneous items selected.

Recommended Labour
Report was unsubmitted during this print-out.
NoParticulars Lab.Type Repairer's Amount

Labour Items
1 LABOUR CHARGES TO REMOVE,CHECK,REPLACE AND REINSTALL DAMAGES BODYPARTS.TO PANEL BEATING,CUT/WELD AND RE-ALIGN ALL AFFECTED PANELS New 600.00 200.00
2 SPRAY PAINTING ON AFFECTED PANELS New 500.00 200.00
3 CHECK WIRING AND LIGHTING SYSTEM New 60.00 0.00
4 APPLY RUST COATING ON AFFECTED AREAS New 40.00 0.00
5 REFOCUS AND ADJUST HEADLAMPS ASSY New 50.00 20.00
 
Gross Labour Cost (S$) 1,250.00420.00
 

< END OF ESTIMATES >