Printing Options
 Hide Company Header - Leave lines blank
 Print continuously - Do not break pages
Adjuster Report
LKK Auto Consultants Pte Ltd (Co.Reg.No:199607198R)
51 Ubi Ave 1 #01-25, Paya Ubi Industrial Park
Singapore 408933
Tel: 6256-3561  Fax: 6844-8805   Email: sur@lkkauto.com;assignments@lkkauto.com

VEHICLE DAMAGE INSPECTION REPORT

  Our File No:CS/ICS21004841/KQF3N2
Date:28/05/2021

REFERENCE
Handling Insurer:ECICS Limited Policy No:MPC20P00130900
Claimant Vehicle No : SMX6857AInsured Vehicle No : SMN7559G
Date of Loss:13/04/2021 Nature of Claim:TP Claim No: DMPC2100133H

DESCRIPTION & IDENTIFICATION OF VEHICLE
Reg No:SMX6857A
Make & Model:TOYOTA PRIUS, 1.8 (A) Engine No:2ZR2G79618
Reg. Date:26/01/2021 (Man. Year: 2020) Chassis No: JTDKB3FU703091426
Colour:Metallic Silver Odometer:26092 km
Engine Capacity:1798 cc
Market Value/New Car Price:N/A
Sum Insured (S$):Market Value/New Car Price

CONDITION OF VEHICLE AT THE TIME OF SURVEY
General Condition: Steering (Serviceable):Yes Footbrake (Serviceable):Yes
Handbrake (Serviceable):Yes Engine Modification:No Pre-accident Condition:

CONDITION OF TYRES
Front Tyre Size:195/65R15 Rear Tyre Size:195/65R15
Front Left Side: Dunlop  7 mm Rear Left Side: Dunlop  7 mm
Front Right Side:Dunlop  7 mm Rear Right Side:Dunlop  7 mm
The above values represent the remaining tyre treads depth

COST OF CLAIMS Repairer's Adjuster's DifferenceDiff %
Parts 3,516.92 944.60 2,572.32 73.14
Miscellaneous Items 0.00 0.00 0.00  
Labour 10,290.00 470.00 9,820.00 95.43
Paintwork Labour 0.00 0.00 0.00  
Towing 0.00 0.00 0.00  
  
Gross Total (S$) 13,806.92 1,414.60 12,392.32 89.75
+ GST 7.00/7.00% (S$) 966.48 99.02 867.46 89.75
  
Nett Amount (S$) 14,773.40 1,513.62 13,259.78 89.75
  

INSPECTION
Date of Assignment:19/04/2021
Date Inspected:19/04/2021 Inspected At:Trans-cab Auto Services Pte Ltd
No 2 Ang Mo Kio Street 63
Singapore 569111
Estimated Period of Repair:2.0 days



Adjuster: KENNETH KONG   Manager: SHIAU CHAN
 
NOTE: This report represents our findings at the time and place of inspection stated herein. Such inspection has been carried out to the best of our knowledge and ability but any other liability under any other circumstances is hereby expressly excluded.

 
REPAIR DETAILS
Reference
Part Source:MRM-SGVersion: 1.0 (Last Synchronised: 28 May 2021)
Parts:144TOYOTA PRIUS 1.8 (A) (Catalogue:Merimen Singapore 1.0)
Labour:Repairer's(Price-denominated Standard List) 
Print Code:(Unsubmitted, no print-code for SMX6857A)
Validity:These estimates are valid only if they contain the print code (above) on all estimate pages, running page numbers with the END OF ESTIMATES marker on the last estimate page
Further Info:Items/values not in reference catalogue are prefixed with an asterisk *.


Recommended Parts
Report was unsubmitted during this print-out.
No.Qty Part No. Particulars Condition Repairer's Amount

1 1 *COVER,REAR BUMPER Buckled 485.60 FL *485.60 FL
2 1 *REINFORCEMENT SUB-ASSY,REAR BUMPER Bent 332.70 FL *332.70 FL
3 1 *COVER,REAR BUMPER LOWER Serviceable 22.00 FL *- FL
4 1 *GUARD,REAR BUMPER CENTER Dented/Cut 374.50 FL *374.50 FL
5 1 *RETAINER REAR BUMPER SIDE,LH No such part 132.60 FL *- FL
6 1 *RETAINER REAR BUMPER SIDE,RH No such part 132.60 FL *- FL
7 1 *REFLECTOR ASSY,REFLEX,LH Serviceable 39.00 FL *- FL
8 1 *REFLECTOR ASSY,REFLEX,RH Serviceable 39.00 FL *- FL
9 1 *COVER,FLOOR UNDER NO 1 LH Serviceable 175.10 FL *- FL
10 1 *COVER,FLOOR UNDER NO 2 RH Serviceable 241.90 FL *- FL
11 1 *COVER,REAR FLOOR CTR Serviceable 229.90 FL *- FL
12 1 *PANEL SUB-ASSY,BODY LOWER BACK Repair 651.00 FL *- FL
13 1 *SET PARKING AID Serviceable 700.00 FS *- FS
14 1 *SET REAR BUMPER CLIP Necessary 95.00 FS *50.00 FS
15 1 *REAR BUMPER PROTECTOR No such part 180.00 FS *- FS
16 2 *SEAM SEALANT Not Necessary 250.00 FS *- FS
17 1 *SET REAR BUMPER RETAINER CLIP Not Necessary 85.00 FS *- FS
18 1 *END PANEL TRIM CLIP Not Necessary 65.00 FS *- FS
F=Franchise part. S=SpcNett. L=ListItemDisc.
Sub Total (S$)4,230.90 1,242.80
- List Item Discount on L Items 25.00/25.00% (S$) 713.98298.20
 
Total Parts (S$) 3,516.92 944.60
 
 
Recommended Miscellaneous Items
There are no new miscellaneous items selected.

Recommended Labour
Report was unsubmitted during this print-out.
NoParticulars Lab.Type Repairer's Amount

Labour Items
1 TO REMOVE AND REFIT REAR BIG AND SMALL W/SCREEN GLASS TO FACILITATE BODYWORK REPAIR New 300.00 0.00
2 TO REMOVE AND REFIT INTERIOR FITTINGS,TRIMINGS,GARNISH, FITTINGS AND OTHER,TO ENABLE REPAIR New 380.00 0.00
3 PANEL BEATING,KNOCKING AND STRAIGHTENING THE NECESSARY PORTION,REMOVE AND RENEWAL OF PARTS,ADJUST AND REALIGN THE SAME New 2,200.00 200.00
4 TO TRANSFER OF REAR END PANEL FITTINGS,ATTACHMENT AND PERFORM WATER SEEPAGE TEST New 380.00 0.00
5 TO TRANSFER OF TAILGATE FITTINGS,ATTACHMENTS AND PERFORM WATER SEEPAGE TEST New 180.00 0.00
6 TO REMOVE AND REFIT ELECTRICAL WIRING,BATTERY AND OTHER NECESSARY ITEMS TO FACILITATE BODYWORK REPAIR New 480.00 0.00
7 TO TRANSFER OF FENDER FITTINGS,ATTACHMENTS AND PERFORM WATER SEEPAGE TEST New 480.00 0.00
8 TO DISMANTLE AND REFIT AIRCON ASSY AND ATTACHMENT,VACUUM AND CHARGE-IN-GAS New 380.00 0.00
9 LABOUR CHARGE TO MOUNT AND DISMOUNT VEHICLE ON JIG BENCH,TO FACILITATE REPAIR New 380.00 0.00
10 TO CHECK STEERING GEOMETRY AND COMPUTER WHEEL ALIGNMENT New 220.00 0.00
11 TO RUST-PROOFING AND APPLY UNDERCOAT OF THE AFFECTED AREAS New 250.00 0.00
12 TOWING FEES New 150.00 0.00
13 PUTTY AND SPRAY PAINTING OF THE AFFECTED PORTION New 2,200.00 220.00
14 TO REINSTALL REAR BUMPER PARKING SENSOR New 170.00 50.00
15 TO CHECK ELECTRICAL LIGHTING CONCERNED New 170.00 0.00
16 TO TRANSFER OF LUGGAGE FLOOR PANEL FITTINGS,ATTACHMENT AND PERFORM WATER SEEPAGE TEST New 380.00 0.00
17 TO TRANSFER OF TIRE,RIM AND ON WHEEL BALANCING New 220.00 0.00
18 TO REPLACE,REFIX AND TOP UP COOLANT FOR RADIATOR New 170.00 0.00
19 TO LIFT-UP/OUT ENGINE WITH GEAR BOX AND REFIT New 440.00 0.00
20 TO REMOVE AND REFIT RADIATOR SUPPORT CROSS-MEMBER AND OTHER NECESSARY ITEMS TO ENABLE BODYWORK REPAIR New 380.00 0.00
21 TO CONDUCT AND PERFORM A COMPREHENSIVE VEHICLE DIAGNOSTIC CHECK AND RESET VEHICLE WARNING INDICATORS New 380.00 0.00
 
Gross Labour Cost (S$) 10,290.00470.00
 

< END OF ESTIMATES >