Printing Options
 Hide Company Header - Leave lines blank
 Print continuously - Do not break pages
Adjuster Report
LKK Auto Consultants Pte Ltd (Co.Reg.No:199607198R)
51 Ubi Ave 1 #01-25, Paya Ubi Industrial Park
Singapore 408933
Tel: 6256-3561  Fax: 6844-8805   Email: sur@lkkauto.com;assignments@lkkauto.com

VEHICLE DAMAGE INSPECTION REPORT

  Our File No:CS/MSG21004764/KVF3N2
Date:30/04/2021

REFERENCE
Handling Insurer:MSIG Insurance (Singapore) Pte. Ltd. Policy No:1001199924
Claimant Vehicle No : GBF8581GInsured Vehicle No : SKF3914G
Date of Loss:13/04/2021 Nature of Claim:TP Claim No: 255973

DESCRIPTION & IDENTIFICATION OF VEHICLE
Reg No:GBF8581G
Make & Model:TOYOTA HIACE, 3.0 D TURBO 5 DR (M) Engine No:1KD2684145
Reg. Date:29/03/2017 (Man. Year: 2016) Chassis No: JTFHT02P300215965
Colour:Silver Odometer:65679 km
Engine Capacity:2982 cc
Market Value/New Car Price:N/A
Sum Insured (S$):Market Value/New Car Price

CONDITION OF VEHICLE AT THE TIME OF SURVEY
General Condition: Steering (Serviceable):Yes Footbrake (Serviceable):Yes
Handbrake (Serviceable):Yes Engine Modification:No Pre-accident Condition:

CONDITION OF TYRES
Front Tyre Size:195R15X8 Rear Tyre Size:195R15X8
Front Left Side: Bridgestone  9 mm Rear Left Side: Bridgestone  8 mm
Front Right Side:Bridgestone  9 mm Rear Right Side:Bridgestone  8 mm
The above values represent the remaining tyre treads depth

COST OF CLAIMS Repairer's Adjuster's DifferenceDiff %
Parts 4,752.60 1,584.49 3,168.11 66.66
Miscellaneous Items 0.00 0.00 0.00  
Labour 1,900.00 1,020.00 880.00 46.32
Paintwork Labour 0.00 0.00 0.00  
Towing 0.00 0.00 0.00  
  
Calculated Gross Total (S$) 6,652.60 2,604.49 4,048.11 60.85
Approved Total (Overridden) (S$) 2,050.00
  
Nett Amount (S$) 6,652.60 2,050.00 4,602.60 69.18
  

INSPECTION
Date of Assignment:15/04/2021
Date Inspected:15/04/2021 Inspected At:CHOON HOCK MOTOR TRADING CO
BLK 176 SIN MING DRIVE
#05-03
SIN MING AUTOCARE
SINGAPORE 575721
Estimated Period of Repair:4.0 days



Adjuster: KENNETH KONG   Manager: VERON CHEN
 
NOTE: This report represents our findings at the time and place of inspection stated herein. Such inspection has been carried out to the best of our knowledge and ability but any other liability under any other circumstances is hereby expressly excluded.

 
REPAIR DETAILS
Reference
Part Source:MRM-SGVersion: 1.0 (Last Synchronised: 30 Apr 2021)
Parts:213TOYOTA HIACE 3.0 D TURBO 5 DR (M) (Catalogue:Merimen Singapore 1.0)
Labour:Repairer's(Price-denominated Standard List) 
Print Code:(Unsubmitted, no print-code for GBF8581G)
Validity:These estimates are valid only if they contain the print code (above) on all estimate pages, running page numbers with the END OF ESTIMATES marker on the last estimate page
Further Info:Items/values not in reference catalogue are prefixed with an asterisk *.


Recommended Parts
Report was unsubmitted during this print-out.
No.Qty Part No. Particulars Condition Repairer's Amount

1 1 *FRONT SIDE PANEL LH Buckled 155.00 F *155.00 FL
2 1 *FRONT HEADLAMP LH Cut 745.90 F *745.90 FL
3 1 *FRONT BUMPER ASSY Cracked 555.90 F *555.90 FL
4 1 *FRONT BUMPER FOG LIGHT COVER LH Dented 75.00 F *75.00 FL
5 1 *FRONT BUMPER SIDE RETAINER LH Missing 145.95 F *145.95 FL
6 1 *FRONT DOOR LH Repair 1,887.95 F *- FL
7 1 *FRONT DOOR LOWER HINGE LH Repair 60.00 F *- FL
8 1 *FRONT DOOR GLASS REGULATOR WITH MOTOR LH Serviceable 692.00 F *- FL
9 1 *SET FRONT DOOR GLASS REGULATOR WIRE Cut 220.00 F *220.00 FL
10 1 *WIRE HOLDER LH Cracked 112.90 F *112.90 FL
11 1 *STEP PANEL LH Dented/Cut 102.00 F *102.00 FL
F=Franchise part. L=ListItemDisc.
Sub Total (S$)4,752.60 2,112.65
- List Item Discount on L Items 0.00/25.00% (S$) 0.00528.16
 
Total Parts (S$) 4,752.60 1,584.49
 
 
Recommended Miscellaneous Items
There are no new miscellaneous items selected.

Recommended Labour
Report was unsubmitted during this print-out.
NoParticulars Lab.Type Repairer's Amount

Labour Items
1 REMOVE DOORS COMPLETE FITTINGS AND GLASS ASSY,CHECK REPLACE DAMAGED PARTS,TRANSFER ALL FITTINGS TO NEW DOOR AND REFIT New 100.00 0.00
2 WIRINGS New 120.00 20.00
3 PANEL BEATING New 800.00 400.00
4 SPRAY PAINTING New 800.00 600.00
5 RUSTPROOFING New 80.00 0.00
 
Gross Labour Cost (S$) 1,900.001,020.00
 

< END OF ESTIMATES >