Adjuster Report
VEHICLE DAMAGE INSPECTION REPORT
|
AIG Asia Pacific Insurance Pte. Ltd. AIG Building, 78 Shenton Way, #09-16 Singapore 079120 |
Our File No: | CC3/AIG21004656/ATCN2 |
| Date: | 12/08/2021 |
REFERENCE |
| Insured/Claimant: | ANGELINE FOO TOONG FOONG ( ANGELINE HU DONGHONG) |
Policy No: | 1800129371 |
| Date of Loss: | 18/03/2021 |
Nature of Claim: | OD |
Claim No: |
2144382585SG
|
| DESCRIPTION & IDENTIFICATION OF VEHICLE |
| Reg No: | SMF2133B |
| Make & Model: | AUDI A3, 1.4 TFSI S-TRONIC (A) |
Engine No: | CZE846123 |
| Reg. Date: | 30/10/2018 (Man. Year: 2018) |
Chassis No: |
WAUZZZ8V7K1002744 |
| Colour: | Black |
Odometer: | 53001 km |
| Engine Capacity: | 1395 cc |
| Market Value/New Car Price: | S$90,000.00 |
| Sum Insured (S$): | Market Value/New Car Price |
| CONDITION OF VEHICLE AT THE TIME OF SURVEY |
| General Condition: | |
Steering (Serviceable): | Yes | Footbrake (Serviceable): | Yes |
| Handbrake (Serviceable): | Yes |
Engine Modification: | No |
Pre-accident Condition: | |
| CONDITION OF TYRES |
| Front Tyre Size: | 205/55R16 |
Rear Tyre Size: | 205/55R16 |
|
Front Left Side:
| Goodyear 6 mm | |
Rear Left Side:
| Goodyear 6 mm | |
| Front Right Side: | Goodyear 6 mm | |
Rear Right Side: | Goodyear 6 mm | |
| The above values represent the remaining tyre treads depth |
| Parts |
11,473.00 |
2,861.60
|
8,611.40 |
75.06 |
| Miscellaneous Items |
0.00 |
0.00 |
0.00 |
|
| Labour |
16,052.00 |
2,992.00 |
13,060.00 |
81.36 |
| Paintwork Labour |
0.00 |
0.00 |
0.00 |
|
| Towing |
0.00 |
0.00 |
0.00 |
|
| | |
|
Calculated Gross Total
(S$)
|
27,525.00 |
5,853.60 |
21,671.40 |
78.73 |
| - Excess (S$) |
600.00 |
600.00 |
0.00 |
0.00 |
| | |
| (S$) |
26,925.00 |
5,253.60 |
21,671.40 |
80.49 |
| +
GST 7.00/7.00% (S$)
|
1,884.75 |
367.75 |
1,517.00 |
80.49 |
| | |
| Nett Amount (S$) |
28,809.75 |
5,621.35 |
23,188.40 |
80.49 |
| | |
| INSPECTION |
| Date of Assignment: | 13/04/2021 |
| Date Inspected: | 13/04/2021 |
Inspected At: | Premium Automobiles Pte Ltd (UBI) 55 Ubi Road 1 Singapore 408699 |
| Estimated Period of Repair: | 5.0 days |
| Adjuster: |
ADRIAN LING |
|
Manager:
|
DENISE TAY KWEE CHENG
|
|
|
|
|
|
|
NOTE: This report represents our findings at the time and place of inspection stated herein. Such inspection has been carried out to the best of our knowledge and ability but any other liability under any other circumstances is hereby expressly excluded.
|
Recommended Parts
| Report was unsubmitted during this print-out. |
| No. | Qty |
Part No. |
Particulars |
Condition | Repairer's | |
Amount |
|
| 1 |
1 |
|
*REAR FENDER SECTIONAL PART-LH |
Repair |
4,140.00 |
FS |
*- |
FS |
| 2 |
1 |
|
*REAR WINDOW |
Not Necessary |
814.00 |
FS |
*- |
FS |
| 3 |
1 |
|
*REAR SIDE WINDOW-LH |
Not Necessary |
570.00 |
FS |
*- |
FS |
| 4 |
1 |
|
*PRIMER |
Not Necessary |
20.00 |
FS |
*- |
FS |
| 5 |
1 |
|
*REAR DOOR-LH |
Dented |
3,039.00 |
FS |
*2,431.20 |
FS |
| 6 |
1 |
|
*REAR DOOR OUTER DOOR SEAL-LH |
Necessary |
161.00 |
FS |
*128.40 |
FS |
| 7 |
1 |
|
*BONDING AGENT |
Not Necessary |
49.00 |
FS |
*- |
FS |
| 8 |
1 |
|
*CLEANING SOLUTION |
Not Necessary |
68.00 |
FS |
*- |
FS |
| 9 |
1 |
|
*APPLICATOR |
Not Necessary |
8.00 |
FS |
*- |
FS |
| 10 |
1 |
|
*REAR DOOR ATTACHMENT PART-LH |
Not Necessary |
129.00 |
FS |
*- |
FS |
| 11 |
1 |
|
*REAR DOOR CATCH-LH |
Not Necessary |
94.00 |
FS |
*- |
FS |
| 12 |
1 |
|
*REAR DOOR HANDLE-LH |
Cut |
374.00 |
FS |
*298.80 |
FS |
| 13 |
1 |
|
*REAR DOOR HOUSING-LH |
Not Necessary |
52.00 |
FS |
*- |
FS |
| 14 |
1 |
|
*REAR DOOR SLIDE VALVE-LH |
Not Necessary |
22.00 |
FS |
*- |
FS |
| 15 |
1 |
|
*REAR DOOR MOUNTING BAR-LH |
Not Necessary |
162.00 |
FS |
*- |
FS |
| 16 |
1 |
|
*REAR DOOR BOWDEN CABLE-LH |
Not Necessary |
52.00 |
FS |
*- |
FS |
| 17 |
2 |
|
*REAR DOOR UNDERLAY-LH/RH |
Not Necessary |
10.00 |
FS |
*- |
FS |
| 18 |
1 |
|
*REAR WHEEL HOUSING LINER-LH |
Not Necessary |
240.00 |
FS |
*- |
FS |
| 19 |
1 |
|
*REAR WHEEL HOUSING LINER ATTACHMENT PARTS |
Not Necessary |
89.00 |
FS |
*- |
FS |
| 20 |
1 |
|
*1/4 GLASS SEALANT |
Not Necessary |
100.00 |
FS |
*- |
FS |
| 21 |
1 |
|
*ACRYLIC SEALANT |
Not Necessary |
180.00 |
FS |
*- |
FS |
| 22 |
1 |
|
*CAVITY WAX |
Not Necessary |
140.00 |
FS |
*- |
FS |
| 23 |
1 |
|
*STONE CHIP |
Not Necessary |
180.00 |
FS |
*- |
FS |
| 24 |
1 |
|
*METAL FILLER POWDER |
Not Necessary |
280.00 |
FS |
*- |
FS |
| 25 |
1 |
|
*REAR WINDSHIELD SEALANT |
Not Necessary |
200.00 |
FS |
*- |
FS |
| 26 |
1 |
|
*SUNDRIES |
Necessary |
300.00 |
FS |
*3.20 |
FS |
| F=Franchise part. S=SpcNett. |
|
| Total Parts (S$) |
11,473.00 | | 2,861.60 | |
| |
|
Recommended Miscellaneous Items
There are no new miscellaneous items selected. |
Recommended Labour
| Report was unsubmitted during this print-out. |
| No | Particulars |
Lab.Type | Repairer's | Amount |
|
| Labour Items |
| 1 |
TO REMOVE AND REINSTALL REAR PARKING AID.CHECK FUNCTION |
New |
280.00 | 0.00 |
| 2 |
TO RENEW REAR WINDSCREEN AND LHS 1/4 GLASS TO FACILITATE FENDER RENEWAL |
New |
600.00 | 0.00 |
| 3 |
TO INSTALL SOLAR FILM FOR REAR WINDSCREEN AND 1/4 GLASS |
New |
400.00 | 0.00 |
| 4 |
TO CARRY OUT WATER SEEPAGE TEST FOR 1/4 GLASS |
New |
280.00 | 0.00 |
| 5 |
TO DISLODGE AND REINSTALL REAR WIRE HARNESS FOR LIGHTS,BATTERY MANAGER,FUSE AND RELAY TRAYS,ELECTRICAL AND AUDIO EQUIPMENT.INSPECT FOR DAMAGE AND RENEW WHERE NECESSARY |
New |
1,400.00 | 0.00 |
| 6 |
TO REMOVE AND REINSTALL REAR SEAT,BACK REST,HAT TRAY,ABCD PILLAR TRIMS,LUGGAGE COMPARTMENT TRIMS.DISLODGE ROOF LINER AND DISENGAGE CURTAIN AIRBAG ETC |
New |
1,400.00 | 0.00 |
| 7 |
TO REMOVE AND TRANSFER LHS REAR DOORS MULTI-LOCK SYSTEM AND POWER WINDOW DEVICES.INSPECT FOR DAMAGES |
New |
350.00 | 350.00 |
| 8 |
TO DISMANTLE REAR BUMPER.TO RENEW LHS REAR DOOR.TO CUT OUT AND WELD LHS REAR FENDER.RE-ORGANISE CRASH MANAGEMENT COMPONENTS.REINSTALL ALL PARTS REMOVED |
New |
5,600.00 | 1,250.00 |
| 9 |
TO RESPRAY REAR BUMPER,LHS REAR FENDER,LHS SILL PANEL,LHS REAR DOOR,DOOR HANDLE,DRAIN PANEL,ROOF CHANNEL,DOOR ENTRANCE AND END PANELLING.TO CARRY OUT STONE CHIP TREATMENT,CAVITY PRESERVATION AND JOINT SEALER WORKS |
New |
5,550.00 | 1,200.00 |
| 10 |
TO CARRY OUT DIAGNOSTIC CHECK |
New |
192.00 | 192.00 |
| |
|
| Gross Labour Cost (S$) |
16,052.00 | 2,992.00 |
| |
|
< END OF ESTIMATES >