Printing Options
 Hide Company Header - Leave lines blank
 Print continuously - Do not break pages
Adjuster Report
LKK Auto Consultants Pte Ltd (Co.Reg.No:199607198R)
51 Ubi Ave 1 #01-25, Paya Ubi Industrial Park
Singapore 408933
Tel: 6256-3561  Fax: 6844-8805   Email: sur@lkkauto.com;assignments@lkkauto.com

VEHICLE DAMAGE INSPECTION REPORT

AIG Asia Pacific Insurance Pte. Ltd.
AIG Building, 78 Shenton Way, #09-16
Singapore 079120
Our File No:CS/AIG21004052/EQF3N2
Date:21/04/2021

REFERENCE
Insured/Claimant:ANG HWE KHENG Policy No:1800109811
Date of Loss:28/03/2021 Nature of Claim:OD Claim No: 9795007515SG

DESCRIPTION & IDENTIFICATION OF VEHICLE
Reg No:SME2357C
Make & Model:MITSUBISHI ATTRAGE, 1.2 (A) Engine No:3A92UHG4358
Reg. Date:24/09/2018 (Man. Year: 2018) Chassis No: MMBSTA13AJH003044
Colour:Red Odometer:7105 km
Engine Capacity:1193 cc
Market Value/New Car Price:S$55,000.00
Sum Insured (S$):Market Value/New Car Price

CONDITION OF VEHICLE AT THE TIME OF SURVEY
General Condition: Steering (Serviceable):Yes Footbrake (Serviceable):Yes
Handbrake (Serviceable):Yes Engine Modification:No Pre-accident Condition:

CONDITION OF TYRES
Front Tyre Size:185/55R15 Rear Tyre Size:185/55R15
Front Left Side: Bridgestone  4 mm Rear Left Side: Bridgestone  4 mm
Front Right Side:Bridgestone  4 mm Rear Right Side:Bridgestone  4 mm
The above values represent the remaining tyre treads depth

COST OF CLAIMS Repairer's Adjuster's DifferenceDiff %
Parts 3,108.42 712.96 2,395.46 77.06
Miscellaneous Items 0.00 0.00 0.00  
Labour 4,940.00 3,325.00 1,615.00 32.69
Paintwork Labour 0.00 0.00 0.00  
Towing 0.00 0.00 0.00  
  
Calculated Gross Total (S$) 8,048.42 4,037.96 4,010.46 49.83
- Excess (S$) 600.00 600.00 0.00 0.00
  
(S$) 7,448.42 3,437.96 4,010.46 53.84
+ GST 7.00/7.00% (S$) 521.39 240.66 280.73 53.84
  
Nett Amount (S$) 7,969.81 3,678.62 4,291.19 53.84
  

INSPECTION
Date of Assignment:30/03/2021
Date Inspected:30/03/2021 Inspected At:Cycle & Carriage Automotive Pte Ltd (Pandan Gardens)
209 Pandan Gardens
Singapore 609339
Estimated Period of Repair:7.0 days



Adjuster: CHEN TSUE YEE   Manager: SHIAU CHAN
 
NOTE: This report represents our findings at the time and place of inspection stated herein. Such inspection has been carried out to the best of our knowledge and ability but any other liability under any other circumstances is hereby expressly excluded.

 
REPAIR DETAILS


Recommended Parts
Report was unsubmitted during this print-out.
No.Qty Part No. Particulars Condition Repairer's Amount

1 1 *PANEL ASSY,RR DOOR,LH Dented 803.00 FL *803.00 FL
2 1 *MLDG,R/DR WDO BELT LINE,LH Not Necessary 76.00 FL *- FL
3 1 *TAPE,RR DOOR SASH,LH Necessary 29.00 FL *29.00 FL
4 1 *REGULATOR,R/DR WINDOW,LH Not Necessary 132.00 FL *- FL
5 1 *MOTOR,R/DR PWR WDO RGLTR,R Not Necessary 391.00 FL *- FL
6 1 *BRACKET,RR BUMPER,LH Not Necessary 28.00 FL *- FL
7 4 *CLIP,RR BUMPER Necessary 16.00 FL *16.00 FL
8 1 *FACE,RR BUMPER Repair 751.00 FL *- FL
9 1 *UNPAINTED BODYKITS Repair 1,643.00 FN *- FN
10 1 *SUNDRIES Necessary 20.00 FS *20.00 FS
11 1 *BODY PNL SEALANT Necessary 60.00 FS *40.00 FS
F=Franchise part. S=SpcNett. L=ListItemDisc. N=NettItemDisc.
Sub Total (S$)3,949.00 908.00
- List Item Discount on L Items 23.00/23.00% (S$) 511.98195.04
- Nett Item Discount on N Items 20.00/20.00% (S$) 328.600.00
 
Total Parts (S$) 3,108.42 712.96
 
 
Recommended Miscellaneous Items
NoQtyParticulars Repairer's Amount

Miscellaneous Items
1 1 *OD/TP Case (Insurer) - 0.00
 
 Sub Total (S$) 0.000.00
 

Recommended Labour
Report was unsubmitted during this print-out.
NoParticulars Lab.Type Repairer's Amount

Labour Items
1 RENEW LHR DOOR,RR BUMPER & RR BUMPER BODY KIT.REPAIR LHF DOOR & LHR FENDER New 2,700.00 1,205.00
2 RESPRAY LHF DOOR,LHR DOOR,LHR FENDER,RR BUMPER & RR BUMPER BODY KIT New 1,750.00 1,750.00
3 REMOVE & REFIT LHR DOOR COMPONENT New 120.00 120.00
4 REMOVE & REFIT RR FLR BOARD,TRIM,CARPET & SEAT New 120.00 0.00
5 CHECK WIRING ELECTRICAL SYSTEM New 30.00 30.00
6 TO CARRY OUT DIAGNOSTIC CHECK USING HI-SCAN PRO TEST USING HI-SCAN PRO TEST New 120.00 120.00
7 REMOVE & REFIT REVERSE SENSOR New 60.00 60.00
8 APPLY ANTI CORROSION ON AFFECTED AREAS New 40.00 40.00
 
Gross Labour Cost (S$) 4,940.003,325.00
 

< END OF ESTIMATES >