Adjuster Report
VEHICLE DAMAGE INSPECTION REPORT
|
AIG Asia Pacific Insurance Pte. Ltd. AIG Building, 78 Shenton Way, #09-16 Singapore 079120 |
Our File No: | CC3/AIG21004036/EQCN2 |
| Date: | 09/04/2021 |
REFERENCE |
| Insured/Claimant: | LAU GUEK MING |
Policy No: | |
| Date of Loss: | 29/03/2021 |
Nature of Claim: | OD |
Claim No: |
3012746683SG
|
| DESCRIPTION & IDENTIFICATION OF VEHICLE |
| Reg No: | SMW3526E |
| Make & Model: | KIA CERATO, 1.6 (A) |
Engine No: | G4FGKH756647 |
| Reg. Date: | 17/11/2020 (Man. Year: 2019) |
Chassis No: |
KNAF3416ML5070188 |
| Colour: | Blue |
Odometer: | 3321 km |
| Engine Capacity: | 1591 cc |
| Market Value/New Car Price: | S$84,000.00 |
| Sum Insured (S$): | Market Value/New Car Price |
| CONDITION OF VEHICLE AT THE TIME OF SURVEY |
| General Condition: | |
Steering (Serviceable): | Yes | Footbrake (Serviceable): | Yes |
| Handbrake (Serviceable): | Yes |
Engine Modification: | No |
Pre-accident Condition: | |
| CONDITION OF TYRES |
| Front Tyre Size: | 205/55R16 |
Rear Tyre Size: | 205/55R16 |
|
Front Left Side:
| Nexen 4 mm | |
Rear Left Side:
| Nexen 4 mm | |
| Front Right Side: | Nexen 4 mm | |
Rear Right Side: | Nexen 4 mm | |
| The above values represent the remaining tyre treads depth |
| Parts |
3,866.00 |
1,047.20
|
2,818.80 |
72.91 |
| Miscellaneous Items |
0.00 |
0.00 |
0.00 |
|
| Labour |
2,500.00 |
900.00 |
1,600.00 |
64.00 |
| Paintwork Labour |
0.00 |
0.00 |
0.00 |
|
| Towing |
0.00 |
0.00 |
0.00 |
|
| | |
|
Calculated Gross Total
(S$)
|
6,366.00 |
1,947.20 |
4,418.80 |
69.41 |
| - Excess (S$) |
300.00 |
300.00 |
0.00 |
0.00 |
| | |
| (S$) |
6,066.00 |
1,647.20 |
4,418.80 |
72.85 |
| +
GST 7.00/7.00% (S$)
|
424.62 |
115.30 |
309.32 |
72.85 |
| | |
| Nett Amount (S$) |
6,490.62 |
1,762.50 |
4,728.12 |
72.85 |
| | |
| INSPECTION |
| Date of Assignment: | 30/03/2021 |
| Date Inspected: | 29/03/2021 |
Inspected At: | Cycle & Carriage KIA Pte Ltd (Pandan Gardens) 209 Pandan Gardens Singapore 609339 |
| Estimated Period of Repair: | 3.0 days |
| Adjuster: |
CHEN TSUE YEE |
|
Manager:
|
SHIAU CHAN
|
|
|
|
|
|
|
NOTE: This report represents our findings at the time and place of inspection stated herein. Such inspection has been carried out to the best of our knowledge and ability but any other liability under any other circumstances is hereby expressly excluded.
|
Recommended Parts
| Report was unsubmitted during this print-out. |
| No. | Qty |
Part No. |
Particulars |
Condition | Repairer's | |
Amount |
|
| 1 |
1 |
|
*COVER-FR BUMPER |
Broken |
633.00 |
F |
*633.00 |
FL |
| 2 |
1 |
|
*GRILLE-FRONT BUMPER |
Not Necessary |
262.00 |
F |
*- |
FL |
| 3 |
1 |
|
*GRILLE ASSY-RADIATOR |
Not Necessary |
328.00 |
F |
*- |
FL |
| 4 |
1 |
|
*MOULDING-FRONT BUMPER,LH |
Not Necessary |
36.00 |
F |
*- |
FL |
| 5 |
1 |
|
*ABSORBER-FRONT BUMPER ENERGY |
Broken |
84.00 |
F |
*84.00 |
FL |
| 6 |
1 |
|
*BRACKET-FR BUMPER UPR SIDE MTG |
Not Necessary |
22.00 |
F |
*- |
FL |
| 7 |
1 |
|
*LAMP ASSY-HEAD,LH |
Not Necessary |
1,219.00 |
F |
*- |
FL |
| 8 |
1 |
|
*BEAM COMPLETE-FR BUMPER |
Broken |
497.00 |
F |
*497.00 |
FL |
| 9 |
1 |
|
*CARRIER ASSY-FRONT END MUDULE |
Not Necessary |
675.00 |
F |
*- |
FL |
| 10 |
1 |
|
*ORNAMENT-KIA NO.115 |
Necessary |
32.00 |
F |
*32.00 |
FL |
| 11 |
1 |
|
*SUNDRY |
Necessary |
40.00 |
FS |
*20.00 |
FS |
| 12 |
1 |
|
*GARNISH-RADIATOR GRILLE Supplementary |
Broken |
38.00 |
F |
*38.00 |
FL |
| F=Franchise part. S=SpcNett. L=ListItemDisc. |
|
| Sub Total (S$) | 3,866.00 | |
1,304.00
| |
| - List Item Discount on L Items 0.00/20.00% (S$) |
0.00 | | 256.80 | |
| |
|
| Total Parts (S$) |
3,866.00 | | 1,047.20 | |
| |
|
Recommended Miscellaneous Items
| No | Qty | Particulars |
Repairer's |
Amount |
|
| Miscellaneous Items |
| 1 |
1 |
*OD/TP Case (Insurer) |
- |
0.00 |
| |
|
| | Sub Total (S$) |
0.00 | 0.00 |
| |
|
Recommended Labour
| Report was unsubmitted during this print-out. |
| No | Particulars |
Lab.Type | Repairer's | Amount |
|
| Labour Items |
| 1 |
RENEW FRT BUMPER,FRT SUPPORT PANEL,REPAIR BONNET |
New |
1,600.00 | 400.00 |
| 2 |
SPRAY PAINT FOR FRT BUMPER,BONNET |
New |
700.00 | 350.00 |
| 3 |
FRT NUMBER PLATE WITH FRAME |
New |
50.00 | 0.00 |
| 4 |
CHECK WIRING & ELECTRICAL SYSTEM |
New |
30.00 | 30.00 |
| 5 |
TO CARRY OUT DIAGNOSTIC CHECK USING HI-SCAN PRO TEST USING HI-SCAN PRO TEST |
New |
120.00 | 120.00 |
| |
|
| Gross Labour Cost (S$) |
2,500.00 | 900.00 |
| |
|
< END OF ESTIMATES >