Adjuster Report
VEHICLE DAMAGE INSPECTION REPORT
|
AIG Asia Pacific Insurance Pte. Ltd. AIG Building, 78 Shenton Way, #09-16 Singapore 079120 |
Our File No: | CC3/AIG21003800/AVF3N2 |
| Date: | 06/04/2021 |
REFERENCE |
| Insured/Claimant: | RUTH CHOECHENG KIM |
Policy No: | 1900061390 |
| Date of Loss: | 20/03/2021 |
Nature of Claim: | OD |
Claim No: |
4459491233SG
|
| DESCRIPTION & IDENTIFICATION OF VEHICLE |
| Reg No: | SMJ8928P |
| Make & Model: | AUDI A3, 1.4 SEDAN TFSI (AMBIENTE) (A) |
Engine No: | CHZC26909 |
| Reg. Date: | 14/03/2019 (Man. Year: 2018) |
Chassis No: |
WAUZZZ8V9KA048978 |
| Colour: | White |
Odometer: | 24265 km |
| Engine Capacity: | 999 cc |
| Market Value/New Car Price: | S$95,000.00 |
| Sum Insured (S$): | Market Value/New Car Price |
| CONDITION OF VEHICLE AT THE TIME OF SURVEY |
| General Condition: | |
Steering (Serviceable): | Yes | Footbrake (Serviceable): | Yes |
| Handbrake (Serviceable): | Yes |
Engine Modification: | No |
Pre-accident Condition: | |
| CONDITION OF TYRES |
| Front Tyre Size: | 205/55R16 |
Rear Tyre Size: | 205/55R16 |
|
Front Left Side:
| Michelin 6 mm | |
Rear Left Side:
| Michelin 6 mm | |
| Front Right Side: | Michelin 6 mm | |
Rear Right Side: | Michelin 6 mm | |
| The above values represent the remaining tyre treads depth |
| Parts |
1,452.00 |
851.00
|
601.00 |
41.39 |
| Miscellaneous Items |
0.00 |
0.00 |
0.00 |
|
| Labour |
5,282.00 |
2,572.00 |
2,710.00 |
51.31 |
| Paintwork Labour |
0.00 |
0.00 |
0.00 |
|
| Towing |
0.00 |
0.00 |
0.00 |
|
| | |
|
Calculated Gross Total
(S$)
|
6,734.00 |
3,423.00 |
3,311.00 |
49.17 |
| - Excess (S$) |
600.00 |
600.00 |
0.00 |
0.00 |
| | |
| (S$) |
6,134.00 |
2,823.00 |
3,311.00 |
53.98 |
| +
GST 7.00/7.00% (S$)
|
429.38 |
197.61 |
231.77 |
53.98 |
| | |
| Nett Amount (S$) |
6,563.38 |
3,020.61 |
3,542.77 |
53.98 |
| | |
| INSPECTION |
| Date of Assignment: | 24/03/2021 |
| Date Inspected: | 25/03/2021 |
Inspected At: | Premium Automobiles Pte Ltd (UBI) 55 Ubi Road 1 Singapore 408699 |
| Estimated Period of Repair: | 4.0 days |
| Adjuster: |
ADRIAN LING |
|
Manager:
|
VERON CHEN
|
|
|
|
|
|
|
NOTE: This report represents our findings at the time and place of inspection stated herein. Such inspection has been carried out to the best of our knowledge and ability but any other liability under any other circumstances is hereby expressly excluded.
|
|
|
(REPAIR COST NOT CONCLUDE) (EXCLUDE CHECK ITEMS S$270.00 NETT)
|
| |
Recommended Parts
| Report was unsubmitted during this print-out. |
| No. | Qty |
Part No. |
Particulars |
Condition | Repairer's | |
Amount |
|
| 1 |
1 |
|
*FRONT FENDER-RH |
Dented |
851.00 |
FS |
*851.00 |
FS |
| 2 |
8 |
|
*FRONT FENDER POP RIVET |
*Check |
27.00 |
FS |
*- |
FS |
| 3 |
1 |
|
*FRONT FENDER ATTACHMENT PARTS-RH |
Not Necessary |
72.00 |
FS |
*- |
FS |
| 4 |
1 |
|
*FRONT FENDER CLOSING ELEMENT-RH |
Not Necessary |
33.00 |
FS |
*- |
FS |
| 5 |
1 |
|
*FRONT FENDER INSULATION-RH |
*Check |
43.00 |
FS |
*- |
FS |
| 6 |
1 |
|
*FRONT WHEEL HOUSING LINER-RH |
Not Necessary |
169.00 |
FS |
*- |
FS |
| 7 |
1 |
|
*FRONT WHEEL HOUSING LINER ATTACHMENT PARTS |
Not Necessary |
57.00 |
FS |
*- |
FS |
| 8 |
1 |
|
*SUNDRIES |
*Check |
200.00 |
FS |
*- |
FS |
| F=Franchise part. S=SpcNett. |
|
| Total Parts (S$) |
1,452.00 | | 851.00 | |
| |
|
Recommended Miscellaneous Items
There are no new miscellaneous items selected. |
Recommended Labour
| Report was unsubmitted during this print-out. |
| No | Particulars |
Lab.Type | Repairer's | Amount |
|
| Labour Items |
| 1 |
TO REMOVE,CHECK AND REINSTALL FRONT WIRE HARNESS FOR HEADLIGHTS,HORNS,OUTSIDE TEMPERATURE SENSOR AND HEADLIGHT WASHER ASSY |
New |
360.00 | 0.00 |
| 2 |
TO REMOVE AND REINSTALL RHS FRONT DOOR PANEL TRIM.TO REMOVE AND REINSTALL RHS WING MIRROR ASSY TO FACILITATE RESPRAYING OF RHS FRONT DOOR |
New |
280.00 | 280.00 |
| 3 |
TO DISMANTLE FRONT BUMPER.TO RENEW RHS FRONT FENDER.TO REPAIR RHS FRONT DOOR.RE-ORGANIZE CRASH MANAGEMENT COMPONENTS.REINSTALL ALL PARTS REMOVED |
New |
2,450.00 | 1,000.00 |
| 4 |
TO RESPRAY RHS FRONT FENDER AND RHS FRONT DOOR |
New |
2,000.00 | 1,100.00 |
| 5 |
TO CARRY OUT DIAGNOSTIC CHECK |
New |
192.00 | 192.00 |
| |
|
| Gross Labour Cost (S$) |
5,282.00 | 2,572.00 |
| |
|
< END OF ESTIMATES >