Printing Options
 Hide Company Header - Leave lines blank
 Print continuously - Do not break pages
Adjuster Report
LKK Auto Consultants Pte Ltd (Co.Reg.No:199607198R)
51 Ubi Ave 1 #01-25, Paya Ubi Industrial Park
Singapore 408933
Tel: 6256-3561  Fax: 6844-8805   Email: sur@lkkauto.com;assignments@lkkauto.com

VEHICLE DAMAGE INSPECTION REPORT

AIG Asia Pacific Insurance Pte. Ltd.
AIG Building, 78 Shenton Way, #09-16
Singapore 079120
Our File No:CS/AIG21003600/KQD3N2
Date:23/06/2021

REFERENCE
Insured/Claimant:DAIMLER FLEET MANAGEMENT SINGAPORE PTE. LTD. Policy No:0999993670
Date of Loss:08/03/2021 Nature of Claim:OD Claim No: 5439612118SG

DESCRIPTION & IDENTIFICATION OF VEHICLE
Reg No:SMD3827L
Make & Model:MERCEDES-BENZ S400L, 3.0 (A) Engine No:27682430300477
Reg. Date:23/03/2016 (Man. Year: 2015) Chassis No: WDD2221652A225764
Colour:Metallic Dark Grey Odometer:101772 km
Engine Capacity:2996 cc
Market Value/New Car Price:S$210,000.00
Sum Insured (S$):Market Value/New Car Price

CONDITION OF VEHICLE AT THE TIME OF SURVEY
General Condition: Steering (Serviceable):Yes Footbrake (Serviceable):Yes
Handbrake (Serviceable):Yes Engine Modification:No Pre-accident Condition:

CONDITION OF TYRES
Front Tyre Size:245/45R19 Rear Tyre Size:275/40R19
Front Left Side: Pirelli  8 mm Rear Left Side: Pirelli  5 mm
Front Right Side:Pirelli  8 mm Rear Right Side:Pirelli  5 mm
The above values represent the remaining tyre treads depth

COST OF CLAIMS Repairer's Adjuster's DifferenceDiff %
Parts 7,779.05 7,639.30 139.75 1.80
Miscellaneous Items 0.00 0.00 0.00  
Labour 2,130.00 1,130.00 1,000.00 46.95
Paintwork Labour 0.00 0.00 0.00  
Towing 0.00 0.00 0.00  
  
Calculated Gross Total (S$) 9,909.05 8,769.30 1,139.75 11.50
- Excess (S$) 2,000.00 2,000.00 0.00 0.00
  
(S$) 7,909.05 6,769.30 1,139.75 14.41
+ GST 7.00/7.00% (S$) 553.63 473.85 79.78 14.41
  
Nett Amount (S$) 8,462.68 7,243.15 1,219.53 14.41
  

INSPECTION
Date of Assignment:19/03/2021
Date Inspected:19/03/2021 Inspected At:Tong Luck Auto Pte Ltd (HQ)
160 Sin Ming Drive, #07-01 Sin Ming AutoCity
Singapore 575722
Estimated Period of Repair:4.0 days



Adjuster: KENNETH KONG   Manager: SHIAU CHAN
 
NOTE: This report represents our findings at the time and place of inspection stated herein. Such inspection has been carried out to the best of our knowledge and ability but any other liability under any other circumstances is hereby expressly excluded.

 
REPAIR DETAILS


Recommended Parts
Report was unsubmitted during this print-out.
No.Qty Part No. Particulars Condition Repairer's Amount

1 1 *SUPPORT PANEL (WCP) Cracked 580.00 F *580.00 F
2 1 *FRONT BUMPER (WCP) Buckled/Dented 1,120.00 F *1,120.00 F
3 1 *FRONT BUMPER REINFORCEMENT (WCP) Bent 480.00 F *480.00 F
4 1 *FRONT BUMPER SPONGE (WCP) Cracked 185.00 F *185.00 F
5 2 *FRONT BUMPER SENSOR (WCP) Shorted 276.00 F *276.00 F
6 6 *FRONT BUMPER SENSOR SEALS (WCP) Necessary 48.00 F *48.00 F
7 1 *FRONT BUMPER CENTER GRILLE (WCP) Dented 98.00 F *98.00 F
8 1 *FRONT NUMBER PLATE GARNISH (WCP) Cracked 108.00 F *108.00 F
9 1 *HEADLAMP ASSY-LH (WCP) Cracked 3,300.00 F *3,300.00 F
10 1 *FRONT GRILLE ASSY (WCP) Cracked 550.00 F *550.00 F
11 1 *FRONT NUMBER PLATE Bent 40.00 FS *40.00 FS
12 1 *AIR DUCT (WCP) Cracked 118.00 F *118.00 F
13 1 *AIR GUIDE-LH (WCP) Serviceable 75.00 F *- F
14 1 *FRONT BUMPER CLIPS
(15PCS)
Necessary 107.25 FS *50.00 FS
F=Franchise part. S=SpcNett.
Sub Total (S$)7,085.25 6,953.00
+ Margin on L,N Items 10.00/10.00% (S$) 693.80686.30
 
Total Parts (S$) 7,779.05 7,639.30
 
 
Recommended Miscellaneous Items
NoQtyParticulars Repairer's Amount

Miscellaneous Items
1 1 *OD/TP Case (Insurer) - 0.00
 
 Sub Total (S$) 0.000.00
 

Recommended Labour
Report was unsubmitted during this print-out.
NoParticulars Lab.Type Repairer's Amount

Labour Items
1 TO REMOVE AND REFIT AIR-CON CONDENSER,RADIATOR AND REFILL AIR-CON GAS New 150.00 100.00
2 TO REMOVE & REFIT FRONT BUMPER SENSOR New 100.00 60.00
3 TO CHECK AND RECTIFY WIRING SYSTEM New 80.00 20.00
4 TO PANEL BEAT AND STRAIGHTEN FRONT CHASSIS FRAME,INCLUDING REPLACEMENT OF PARTS AND ALIGN WHERE NECESSARY,TO REFIT AND ADJUST THE SAME New 1,000.00 500.00
5 TO PUTTY AND SPRAY PAINT ON AFFECTED AREAS New 800.00 450.00
 
Gross Labour Cost (S$) 2,130.001,130.00
 

< END OF ESTIMATES >