Printing Options
 Hide Company Header - Leave lines blank
 Print continuously - Do not break pages
Adjuster Report
LKK Auto Consultants Pte Ltd (Co.Reg.No:199607198R)
51 Ubi Ave 1 #01-25, Paya Ubi Industrial Park
Singapore 408933
Tel: 6256-3561  Fax: 6844-8805   Email: sur@lkkauto.com;assignments@lkkauto.com

VEHICLE DAMAGE INSPECTION REPORT

  Our File No:CS/AIG21003595/UVD3N2
Date:31/03/2021

REFERENCE
Handling Insurer:AIG Asia Pacific Insurance Pte. Ltd. Policy No:2070124068
Claimant Vehicle No : XD6949TInsured Vehicle No : GBH1826L
Date of Loss:17/03/2021 Nature of Claim:TP Claim No: 1767071831SG

DESCRIPTION & IDENTIFICATION OF VEHICLE
Reg No:XD6949T
Make & Model:MITSUBISHI FV51JJD4RDEA, 12.9 D (M) Engine No:6M70455817
Reg. Date:15/04/2013 (Man. Year: 2013) Chassis No: FV51JJA10088
Colour:White/Blue Odometer:672429 km
Engine Capacity:12882 cc
Market Value/New Car Price:N/A
Sum Insured (S$):Market Value/New Car Price

CONDITION OF VEHICLE AT THE TIME OF SURVEY
General Condition: Steering (Serviceable):Yes Footbrake (Serviceable):Yes
Handbrake (Serviceable):Yes Engine Modification:No Pre-accident Condition:

CONDITION OF TYRES
Front Tyre Size:295/80R22.5 Rear Tyre Size:295/80R22.5(D/D)
Front Left Side: Mirage  5 mm Rear Left Side: Mirage  5/55/5 mm
Front Right Side:Mirage  5 mm Rear Right Side:Mirage  5/55/5 mm
The above values represent the remaining tyre treads depth

COST OF CLAIMS Repairer's Adjuster's DifferenceDiff %
Parts 21,004.93 12,071.05 8,933.88 42.53
Miscellaneous Items 0.00 0.00 0.00  
Labour 2,960.00 2,060.00 900.00 30.41
Paintwork Labour 0.00 0.00 0.00  
Towing 0.00 0.00 0.00  
  
Calculated Gross Total (S$) 23,964.93 14,131.05 9,833.88 41.03
Approved Total (Overridden) (S$) 11,300.00
  
(S$) 23,964.93 11,300.00 12,664.93 52.85
+ GST 7.00/7.00% (S$) 1,677.55 791.00 886.55 52.85
  
Nett Amount (S$) 25,642.48 12,091.00 13,551.48 52.85
  

INSPECTION
Date of Assignment:19/03/2021
Date Inspected:19/03/2021 Inspected At:Mah Lian Motor Vehicle Repairer (HQ)
NO. 38 DEFU LANE 9
Singapore 539278
Estimated Period of Repair:6.0 days



Adjuster: MARCUS CHUA   Manager: VERON CHEN
 
NOTE: This report represents our findings at the time and place of inspection stated herein. Such inspection has been carried out to the best of our knowledge and ability but any other liability under any other circumstances is hereby expressly excluded.

 
REPAIR DETAILS


Recommended Parts
Report was unsubmitted during this print-out.
No.Qty Part No. Particulars Condition Repairer's Amount

1 1 *FRONT CORNER PANEL-LH Cracked 1,427.69 FL *1,427.69 FL
2 1 *FRONT CORNER PANEL RUBBER SEAL-LH Necessary 127.41 FL *127.41 FL
3 1 *FRONT CORNER PANEL SIGNAL LAMP-LH Not Necessary 361.67 FL *- FL
4 1 *FRONT CORNER PANEL SIGNAL LAMP SOCKET-LH Not Necessary 116.54 FL *- FL
5 1 *FRONT BUMPER Bent 2,861.07 FL *2,200.83 FL
6 1 *FRONT BUMPER BRACKET-LH Repair 633.36 FL *- FL
7 1 *FRONT BUMPER SIDE-LH Distorted 192.41 FL *140.29 FL
8 1 *HEADLAMP ASSY-LH Cracked 1,272.03 FL *1,272.03 FL
9 1 *HEADLAMP ALUMINIUM BRACKET Not Necessary 870.06 FL *- FL
10 1 *HEADLAMP RIM-LH Twisted 153.63 FL *153.63 FL
11 1 *FOG LAMP ASSY-LH Cracked 361.67 FL *361.67 FL
12 1 *FOG LAMP RIM-LH Twisted 177.34 FL *177.34 FL
13 1 *SIDE MIRROR SQUARE-LH Not Necessary 150.81 FL *- FL
14 1 *SIDE MIRROR LOWER STAY-LH Not Necessary 166.79 FL *- FL
15 1 *SIDE MIRROR LOWER STAY BRACKET-LH Not Necessary 200.23 FL *- FL
16 1 *FRONT DOOR ASSY-LH } Dented/Bent 8,216.01 FL *5,542.31 FL
17 1 *FRONT DOOR LAMP-LH }   361.81 FL *- FL
18 1 *FRONT DOOR PILLAR-LH Repair 3,106.53 FL *- FL
19 1 *FRONT DOOR PILLAR INNER GARNISH-LH Not Necessary 364.93 FL *- FL
20 1 *FRONT DOOR PILLAR INNER PANEL-LH Repair 1,164.51 FL *- FL
21 1 *STAND PANEL-LH Cracked 2,073.81 FL *2,073.81 FL
22 1 *FRONT STEP PANEL BRACKET-LH Cracked 466.31 FL *466.31 FL
23 1 *REAR STEP PANEL BRACKET-LH Repair 355.01 FL *- FL
24 1 *STEP PANEL-LH Cracked 594.41 FL *594.41 FL
25 1 *STEP PANEL LOWER-LH Cracked 253.79 FL *253.79 FL
26 1 *STEP PANEL UNDER COVER-LH Distorted 189.18 FL *189.18 FL
27 1 *STEP ALLOY TOP-LH Cracked 520.63 FL *520.63 FL
28 1 *STEP ALLOY LOWER-LH Cracked 393.40 FL *393.40 FL
29 1 *STEP PANEL REFLECTOR-LH Not Necessary 233.53 FL *- FL
30 1 *ADVERTISEMENT CHEW HOCK SENG CONSTRUCTION PTE LTD Necessary 480.00 FS *150.00 FS
F=Franchise part. S=SpcNett. L=ListItemDisc.
Sub Total (S$)27,846.57 16,044.73
- List Item Discount on L Items 25.00/25.00% (S$) 6,841.643,973.68
 
Total Parts (S$) 21,004.93 12,071.05
 
 
Recommended Miscellaneous Items
There are no new miscellaneous items selected.

Recommended Labour
Report was unsubmitted during this print-out.
NoParticulars Lab.Type Repairer's Amount

Labour Items
1 TO REMOVE & REFIT FRONT LH/RH DOOR & REALIGNMENT & TRANSFER PARTS New 100.00 60.00
2 TO REMOVE & REFIT HEADLAMP,FOGLAMP & REFIT WIRING & REFOCUS ALL LIGHT New 200.00 30.00
3 LABOUR TO KNOCK & CUT & DISMANTLE & REFIT ALL ABOVE PARTS New 1,200.00 1,100.00
4 TO SPRAY & PAINTING AT ACCIDENT AFFECTED AREA New 980.00 820.00
5 TO RUST PROOFING ON AFFECTED AREA New 480.00 50.00
 
Gross Labour Cost (S$) 2,960.002,060.00
 

< END OF ESTIMATES >