Printing Options
 Hide Company Header - Leave lines blank
 Print continuously - Do not break pages
Adjuster Report
LKK Auto Consultants Pte Ltd (Co.Reg.No:199607198R)
51 Ubi Ave 1 #01-25, Paya Ubi Industrial Park
Singapore 408933
Tel: 6256-3561  Fax: 6844-8805   Email: sur@lkkauto.com;assignments@lkkauto.com

VEHICLE DAMAGE INSPECTION REPORT

AIG Asia Pacific Insurance Pte. Ltd.
AIG Building, 78 Shenton Way, #09-16
Singapore 079120
Our File No:CS/AIG21002876/KVF3N2
Date:30/03/2021

REFERENCE
Insured/Claimant:DAIMLER FLEET MANAGEMENT SINGAPORE PTE. LTD. Policy No:0999993662
Date of Loss:23/02/2021 Nature of Claim:OD Claim No: 5651414737SG

DESCRIPTION & IDENTIFICATION OF VEHICLE
Reg No:SBK3168Z
Make & Model:TOYOTA VELLFIRE, 2.5 ELEGANCE MOONROOF (A) Engine No:2ARJ211217
Reg. Date:24/12/2018 (Man. Year: 2018) Chassis No: JTNGF3DH508020174
Colour:Metallic Black Odometer:127591 km
Engine Capacity:2494 cc
Market Value/New Car Price:S$138,000.00
Sum Insured (S$):Market Value/New Car Price

CONDITION OF VEHICLE AT THE TIME OF SURVEY
General Condition: Steering (Serviceable):Yes Footbrake (Serviceable):Yes
Handbrake (Serviceable):Yes Engine Modification:No Pre-accident Condition:

CONDITION OF TYRES
Front Tyre Size:235/50R18 Rear Tyre Size:235/50R18
Front Left Side: Michelin  7 mm Rear Left Side: Michelin  7 mm
Front Right Side:Michelin  7 mm Rear Right Side:Michelin  7 mm
The above values represent the remaining tyre treads depth

COST OF CLAIMS Repairer's Adjuster's DifferenceDiff %
Parts 5,418.10 4,676.50 741.60 13.69
Miscellaneous Items 0.00 0.00 0.00  
Labour 2,930.00 1,250.00 1,680.00 57.34
Paintwork Labour 0.00 0.00 0.00  
Towing 0.00 0.00 0.00  
  
Calculated Gross Total (S$) 8,348.10 5,926.50 2,421.60 29.01
- Excess (S$) 5,500.00 5,500.00 0.00 0.00
  
(S$) 2,848.10 426.50 2,421.60 85.03
+ GST 7.00/7.00% (S$) 199.37 29.86 169.51 85.02
  
Nett Amount (S$) 3,047.47 456.36 2,591.11 85.02
  

INSPECTION
Date of Assignment:03/03/2021
Date Inspected:04/03/2021 Inspected At:Tong Luck Auto Pte Ltd (HQ)
160 Sin Ming Drive, #07-01 Sin Ming AutoCity
Singapore 575722
Estimated Period of Repair:4.0 days



Adjuster: KENNETH KONG   Manager: VERON CHEN
 
NOTE: This report represents our findings at the time and place of inspection stated herein. Such inspection has been carried out to the best of our knowledge and ability but any other liability under any other circumstances is hereby expressly excluded.

 
(REPAIR COST NOT CONCLUDE)
(EXCLUDE CHECK ITEMS S$149.60 NETT)
 
 
REPAIR DETAILS


Recommended Parts
Report was unsubmitted during this print-out.
No.Qty Part No. Particulars Condition Repairer's Amount

1 1 *REAR WINDSCREEN GLASS (WCP) Shattered 650.00 F *650.00 F
2 1 *TAILGATE (WCP) Bent 920.00 F *920.00 F
3 1 *TAILGATE CENTER CHROME (WCP) Cracked 480.00 F *480.00 F
4 1 *TAILGATE SPOILER (WCP) Bent/Cracked 1,050.00 F *1,050.00 F
5 1 *TAILGATE CENTER LOGO (WCP) Necessary 78.00 F *78.00 F
6 1 *TAILGATE VELLFIRE EMBLEM (WCP) Necessary 62.00 F *62.00 F
7 2 *TAILGATE HINGES-RH/LH (WCP) *Check 136.00 F *- F
8 1 *TAILLAMP ASSY (INNER)-RH (WCP) Cracked 480.00 F *480.00 F
9 1 *TAILLAMP ASSY (OUTER)-RH (WCP) Serviceable 520.00 F *- F
10 1 *REAR BUMPER (WCP) Buckled 420.00 F *420.00 F
11 15 *REAR BUMPER CLIPS (WCP) Necessary 75.00 F *75.00 F
12 1 *REAR WINDSCREEN SEALANT Necessary 60.00 FS *40.00 FS
F=Franchise part. S=SpcNett.
Sub Total (S$)4,931.00 4,255.00
+ Margin on L,N Items 10.00/10.00% (S$) 487.10421.50
 
Total Parts (S$) 5,418.10 4,676.50
 
 
Recommended Miscellaneous Items
NoQtyParticulars Repairer's Amount

Miscellaneous Items
1 1 *OD/TP Case (Insurer) - 0.00
 
 Sub Total (S$) 0.000.00
 

Recommended Labour
Report was unsubmitted during this print-out.
NoParticulars Lab.Type Repairer's Amount

Labour Items
1 TO REMOVE AND REFIT REAR WINDSCREEN GLASS New 150.00 120.00
2 TO TRANSFER DAMAGED TAILGATE INTERIOR MECHANISM TO NEW TAILGATE New 180.00 60.00
3 TO REMOVE AND REFIT REAR BUMPER SENSOR New 100.00 50.00
4 TO CHECK AND RECTIFY WIRING SYSTEM New 100.00 20.00
5 TO PANEL BEAT AND STRAIGHTEN ROOF TOP PANEL,REAR END PANEL,INCLUDING REPLACEMENT OF PARTS AND ALIGN WHERE NECESSARY,TO REFIT AND ADJUST THE SAME New 1,200.00 400.00
6 TO PUTTY AND SPRAY PAINT ON AFFECTED AREAS New 1,200.00 600.00
 
Gross Labour Cost (S$) 2,930.001,250.00
 

< END OF ESTIMATES >