VEHICLE DAMAGE INSPECTION REPORT

  Our File No:CS/CTI21002856/R1TF3N2
Date:28/04/2021

REFERENCE
Handling Insurer:China Taiping Insurance (Singapore) Pte. Ltd. Policy No:DMPCSNW00071422002
Claimant Vehicle No : SMV9342JInsured Vehicle No : SR89A
Date of Loss:25/02/2021 Nature of Claim:TP Claim No: SNM21D201141/C02/LEWLC

DESCRIPTION & IDENTIFICATION OF VEHICLE
Reg No:SMV9342J
Make & Model:BMW 318I, 1.5 (A) Engine No:F6023667B48B20A
Reg. Date:28/10/2020 (Man. Year: 2020) Chassis No: WBA72DY040FJ87273
Colour:Grey Odometer:6168 km
Engine Capacity:1998 cc
Market Value/New Car Price:N/A
Sum Insured (S$):Market Value/New Car Price

CONDITION OF VEHICLE AT THE TIME OF SURVEY
General Condition: Steering (Serviceable):Yes Footbrake (Serviceable):Yes
Handbrake (Serviceable):Yes Engine Modification:No Pre-accident Condition:

CONDITION OF TYRES
Front Tyre Size:225/50R17 Rear Tyre Size:225/50R17
Front Left Side: Pirelli  6 mm Rear Left Side: Pirelli  6 mm
Front Right Side:Pirelli  6 mm Rear Right Side:Pirelli  6 mm
The above values represent the remaining tyre treads depth

COST OF CLAIMS Repairer's Adjuster's DifferenceDiff %
Parts 3,051.25 2,968.45 82.80 2.71
Miscellaneous Items 0.00 0.00 0.00  
Labour 5,570.00 4,361.00 1,209.00 21.71
Paintwork Labour 0.00 0.00 0.00  
Towing 0.00 0.00 0.00  
  
Gross Total (S$) 8,621.25 7,329.45 1,291.80 14.98
+ GST 7.00/7.00% (S$) 603.49 513.06 90.43 14.98
  
Nett Amount (S$) 9,224.74 7,842.51 1,382.23 14.98
  

INSPECTION
Date of Assignment:03/03/2021
Date Inspected:08/03/2021 Inspected At:Performance Motors Limited (Alexandra)
303 Alexandra Road, Sime Darby Performance Centre
Singapore 159941
Estimated Period of Repair:5.0 days



Adjuster: MOHD RASUL   Manager: DENISE TAY KWEE CHENG
 
NOTE: This report represents our findings at the time and place of inspection stated herein. Such inspection has been carried out to the best of our knowledge and ability but any other liability under any other circumstances is hereby expressly excluded.

 
REPAIR DETAILS
Reference
Part Source:MRM-SGVersion: 1.0 (Last Synchronised: 28 Apr 2021)
Parts:143BMW 318I 1.5 (A) (Catalogue:Merimen Singapore 1.0)
Labour:Repairer's(Price-denominated Standard List) 
Print Code:(Unsubmitted, no print-code for SMV9342J)
Validity:These estimates are valid only if they contain the print code (above) on all estimate pages, running page numbers with the END OF ESTIMATES marker on the last estimate page
Further Info:Items/values not in reference catalogue are prefixed with an asterisk *.


Recommended Parts
Report was unsubmitted during this print-out.
No.Qty Part No. Particulars Condition Repairer's Amount

1 1 *ALLOY RIM 7.5X17 V SPK 775 Scratched 999.40 FS *999.40 FS
2 1 *FRT RH SIDE PANEL Bent 815.60 FS *815.60 FS
3 1 *RH RETAINING FRAME Serviceable 82.80 FS *- FS
4 1 *FRT BUMPER PANEL PRIMED (LINE PDC/P) Scratched 1,073.45 FS *1,073.45 FS
5 1 *SUNDRIES Necessary 80.00 FS *80.00 FS
F=Franchise part. S=SpcNett.
Total Parts (S$) 3,051.25 2,968.45
 
 
Recommended Miscellaneous Items
There are no new miscellaneous items selected.

Recommended Labour
Report was unsubmitted during this print-out.
NoParticulars Lab.Type Repairer's Amount

Labour Items
1 TO REPLACE FRONT BUMPER,FENDER RIGHT AND ATTACHMENTS New 2,550.00 1,700.00
2 TO PAINTING FRONT BUMPER AND FENDER RIGHT New 1,923.00 1,730.00
3 TO CHECK ELECTRICAL WIRING SYSTEM AT THE FRONT SECTION FOR PROPER FUNCTION INCLUDING ADJUSTMENT OF HEADLIGHTS New 177.00 150.00
4 TO REMOVE OLD PDC ASSEMBLY,REPLACE DAMAGED PARTS AND RECONNECT TO NEW BUMPER INCLUDING CONDUCT CHECK FOR PROPER FUNCTION New 177.00 150.00
5 TO REPLACE TYRE AND WHEEL RIM INCLUDING BALANCING (1X) New 94.00 80.00
6 TO CHECK STEERING GEOMETRY AND CONDUCT WHEEL ALIGNMENT IN ACCORDANCE WITH BMW SPECIFICATIONS (1X) New 531.00 451.00
7 TO CARRY OUT BODY CAVITY PRESERVATION (PER PANEL) New 118.00 100.00
 
Gross Labour Cost (S$) 5,570.004,361.00
 

< END OF ESTIMATES >