Printing Options
 Hide Company Header - Leave lines blank
 Print continuously - Do not break pages
Adjuster Report
LKK Auto Consultants Pte Ltd (Co.Reg.No:199607198R)
51 Ubi Ave 1 #01-25, Paya Ubi Industrial Park
Singapore 408933
Tel: 6256-3561  Fax: 6844-8805   Email: sur@lkkauto.com;assignments@lkkauto.com

VEHICLE DAMAGE INSPECTION REPORT

AIG Asia Pacific Insurance Pte. Ltd.
AIG Building, 78 Shenton Way, #09-16
Singapore 079120
Our File No:CS/AIG21002833/EQD3N2
Date:26/04/2021

REFERENCE
Insured/Claimant:KHANG GIP MENG Policy No:2100460768
Date of Loss:02/03/2021 Nature of Claim:OD Claim No: 6926632586SG

DESCRIPTION & IDENTIFICATION OF VEHICLE
Reg No:SJY3005S
Make & Model:CITROEN C4, 1.6 PICASSO (A) Engine No:10FJCC2242401
Reg. Date:13/04/2016 (Man. Year: 2016) Chassis No: VF73A5GZTGJ540467
Colour:Silver Odometer:80509 km
Engine Capacity:1598 cc
Market Value/New Car Price:S$55,000.00
Sum Insured (S$):Market Value/New Car Price

CONDITION OF VEHICLE AT THE TIME OF SURVEY
General Condition: Steering (Serviceable):Yes Footbrake (Serviceable):Yes
Handbrake (Serviceable):Yes Engine Modification:No Pre-accident Condition:

CONDITION OF TYRES
Front Tyre Size:215/55R17 Rear Tyre Size:215/55R17
Front Left Side: Yokohama  5 mm Rear Left Side: Yokohama  5 mm
Front Right Side:Yokohama  5 mm Rear Right Side:Yokohama  5 mm
The above values represent the remaining tyre treads depth

COST OF CLAIMS Repairer's Adjuster's DifferenceDiff %
Parts 4,882.80 4,517.60 365.20 7.48
Miscellaneous Items 0.00 0.00 0.00  
Labour 6,475.00 4,265.00 2,210.00 34.13
Paintwork Labour 0.00 0.00 0.00  
Towing 0.00 0.00 0.00  
  
Calculated Gross Total (S$) 11,357.80 8,782.60 2,575.20 22.67
- Excess (S$) 600.00 600.00 0.00 0.00
  
(S$) 10,757.80 8,182.60 2,575.20 23.94
+ GST 7.00/7.00% (S$) 753.05 572.78 180.27 23.94
  
Nett Amount (S$) 11,510.85 8,755.38 2,755.47 23.94
  

INSPECTION
Date of Assignment:02/03/2021
Date Inspected:03/03/2021 Inspected At:Cycle & Carriage France Pte Ltd (Pandan Gardens) (HQ)
209 PANDAN GARDENS
Singapore 609339
Estimated Period of Repair:8.0 days



Adjuster: CHEN TSUE YEE   Manager: SHIAU CHAN
 
NOTE: This report represents our findings at the time and place of inspection stated herein. Such inspection has been carried out to the best of our knowledge and ability but any other liability under any other circumstances is hereby expressly excluded.

 
REPAIR DETAILS


Recommended Parts
Report was unsubmitted during this print-out.
No.Qty Part No. Particulars Condition Repairer's Amount

1 1 *FRONT WING LH ASS Broken 566.00 FL *566.00 FL
2 1 *MUDGUARD LH ASS Not Necessary 192.00 FL *- FL
3 1 *ACCOUSTIC SEAL LH Not Necessary 61.00 FL *- FL
4 1 *FRONT WING FIX Necessary 64.00 FL *64.00 FL
5 1 *FRONT DOOR LH ASS Dented 1,332.00 FL *1,332.00 FL
6 1 *DR WEATHERSTRIP LH AV Not Necessary 79.00 FL *- FL
7 1 *DR WEATHERSTRIP LH INF Necessary 89.00 FL *89.00 FL
8 1 *DR WEATHERSTRIP LH SUP Cut 113.00 FL *113.00 FL
9 1 *MOULDING LH Necessary 97.00 FL *97.00 FL
10 1 *FRT DOOR GLASS LH Cut 199.00 FL *199.00 FL
11 1 *WINDOW OUTSIDE LH Cut 101.00 FL *101.00 FL
12 1 *WINDOW CHANNEL LH Cut 297.00 FL *297.00 FL
13 1 *EXT VIEW MIRROR LH Broken 779.00 FL *779.00 FL
14 1 *MIRROR CAPPING LH Not Necessary 87.00 FL *- FL
15 1 *ALLOY WHEEL 7 J17 CH5-50 Cut 846.00 FL *846.00 FL
16 1 *SUNDRIES Necessary 50.00 FS *20.00 FS
17 1 *FRONT BUMPER
Supplementary
Crushed 1,139.00 FL *1,139.00 FL
F=Franchise part. S=SpcNett. L=ListItemDisc.
Sub Total (S$)6,091.00 5,642.00
- List Item Discount on L Items 20.00/20.00% (S$) 1,208.201,124.40
 
Total Parts (S$) 4,882.80 4,517.60
 
 
Recommended Miscellaneous Items
NoQtyParticulars Repairer's Amount

Miscellaneous Items
1 1 *OD/TP Case (Insurer) - 0.00
 
 Sub Total (S$) 0.000.00
 

Recommended Labour
Report was unsubmitted during this print-out.
NoParticulars Lab.Type Repairer's Amount

Labour Items
1 REPLACE FRT LH FENDER,FRT LH DOOR & AFFECTED AREA.REPAIR ON REAR LH DOOR & REAR LH FENDER New 2,500.00 1,250.00
2 PAINT WORK ON FRT LH FENDER,FRT LH DOOR,REAR LH DOOR,REAR LH FENDER & REAR BUMPER New 1,900.00 1,140.00
3 REMOVE & INSTALL REAR PARKING ASSIST New 120.00 0.00
4 TO TRANSFER FRT LH DOOR ATTACHMENTS TO NEW PANEL New 150.00 150.00
5 TO REPLACE FRT LH DOOR GLASS New 120.00 120.00
6 REPLACE FRT LH DOOR GLASS SOLAR FILM New 180.00 180.00
7 PERFORM RUST PREVENTION New 120.00 40.00
8 CHECK WIRING & CHASSIS ELECTRICAL SYSTEM New 50.00 50.00
9 TO CARRY OUT DIAGNOSTIC CHECK USING HI-SCAN PRO TEST USING HI-SCAN PRO TEST New 225.00 225.00
10 TO CONDUCT COMPUTERIZE FULL WHEEL ALIGNMENT New 120.00 120.00
11 TO TRANSFER FRT LH RIM INCLUDING BALANCING New 30.00 30.00
12 REPLACE FRONT BUMPER PANEL
Supplementary
New 500.00 500.00
13 SPRAY PAINT ON FRONT BUMPER & LH WING MIRROR COVER
Supplementary
New 460.00 460.00
 
Gross Labour Cost (S$) 6,475.004,265.00
 

< END OF ESTIMATES >