Printing Options
 Hide Company Header - Leave lines blank
 Print continuously - Do not break pages
Adjuster Report
LKK Auto Consultants Pte Ltd (Co.Reg.No:199607198R)
51 Ubi Ave 1 #01-25, Paya Ubi Industrial Park
Singapore 408933
Tel: 6256-3561  Fax: 6844-8805   Email: sur@lkkauto.com;assignments@lkkauto.com

VEHICLE DAMAGE INSPECTION REPORT

AIG Asia Pacific Insurance Pte. Ltd.
AIG Building, 78 Shenton Way, #09-16
Singapore 079120
Our File No:CS/AIG21002731/KVF3N2
Date:21/04/2021

REFERENCE
Insured/Claimant:DAIMLER FLEET MANAGEMENT SINGAPORE PTE. LTD. Policy No:0999993662
Date of Loss:04/02/2021 Nature of Claim:OD Claim No: 1214083463SG

DESCRIPTION & IDENTIFICATION OF VEHICLE
Reg No:SMP7790T
Make & Model:MERCEDES-BENZ A200, 1.3 (A) Engine No:28291480051523
Reg. Date:16/10/2019 (Man. Year: 2019) Chassis No: WDD1771872W014205
Colour:Metallic Black Odometer:19287 km
Engine Capacity:1332 cc
Market Value/New Car Price:S$125,000.00
Sum Insured (S$):Market Value/New Car Price

CONDITION OF VEHICLE AT THE TIME OF SURVEY
General Condition: Steering (Serviceable):Yes Footbrake (Serviceable):Yes
Handbrake (Serviceable):Yes Engine Modification:No Pre-accident Condition:

CONDITION OF TYRES
Front Tyre Size:225/45R18 Rear Tyre Size:225/45R18
Front Left Side: Hankook  7 mm Rear Left Side: Hankook  8 mm
Front Right Side:Hankook  7 mm Rear Right Side:Hankook  8 mm
The above values represent the remaining tyre treads depth

COST OF CLAIMS Repairer's Adjuster's DifferenceDiff %
Parts 3,647.65 1,673.60 1,974.05 54.12
Miscellaneous Items 0.00 0.00 0.00  
Labour 2,510.00 1,060.00 1,450.00 57.77
Paintwork Labour 0.00 0.00 0.00  
Towing 0.00 0.00 0.00  
  
Calculated Gross Total (S$) 6,157.65 2,733.60 3,424.05 55.61
- Excess (S$) 1,700.00 1,700.00 0.00 0.00
  
(S$) 4,457.65 1,033.60 3,424.05 76.81
+ GST 7.00/7.00% (S$) 312.04 72.35 239.69 76.81
  
Nett Amount (S$) 4,769.69 1,105.95 3,663.74 76.81
  

INSPECTION
Date of Assignment:01/03/2021
Date Inspected:02/03/2021 Inspected At:Tong Luck Auto Pte Ltd (HQ)
160 Sin Ming Drive, #07-01 Sin Ming AutoCity
Singapore 575722
Estimated Period of Repair:4.0 days



Adjuster: KENNETH KONG   Manager: VERON CHEN
 
NOTE: This report represents our findings at the time and place of inspection stated herein. Such inspection has been carried out to the best of our knowledge and ability but any other liability under any other circumstances is hereby expressly excluded.

 
REPAIR DETAILS


Recommended Parts
Report was unsubmitted during this print-out.
No.Qty Part No. Particulars Condition Repairer's Amount

1 1 *TAILLAMP LOWER BRACKET-RH (WCP) Serviceable 85.00 F *- F
2 1 *REAR BUMPER (WCP) Cracked 880.00 F *880.00 F
3 1 *REAR BUMPER SIDE RETAINER-RH (WCP) Distorted 98.00 F *98.00 F
4 1 *REAR BUMPER SENSOR (WCP) Serviceable 138.00 F *- F
5 6 *REAR BUMPER SENSOR SEALS (WCP) Necessary 48.00 F *48.00 F
6 1 *REAR FENDER-RH (WCP) Repair 1,350.00 F *- F
7 20 *REAR FENDER INNER SHIELD CLIPS-RH (WCP) Not Necessary 130.00 F *- F
8 1 *TAILLAMP ASSY-RH (WCP) Cracked 450.00 F *450.00 F
9 1 *REAR WINDSCREEN SEALANT Not Necessary 60.00 FS *- FS
10 1 *REAR BUMPER CLIPS
(15 Pcs)
Necessary 90.75 FS *50.00 FS
F=Franchise part. S=SpcNett.
Sub Total (S$)3,329.75 1,526.00
+ Margin on L,N Items 10.00/10.00% (S$) 317.90147.60
 
Total Parts (S$) 3,647.65 1,673.60
 
 
Recommended Miscellaneous Items
NoQtyParticulars Repairer's Amount

Miscellaneous Items
1 1 *OD/TP Case (Insurer) - 0.00
 
 Sub Total (S$) 0.000.00
 

Recommended Labour
Report was unsubmitted during this print-out.
NoParticulars Lab.Type Repairer's Amount

Labour Items
1 TO REMOVE AND REFIT REAR WINDSCREEN GLASS New 150.00 0.00
2 TO REMOVE AND REFIT RH REAR INTERIOR GARNISHES AND TRIMBOARD TO FACILITATES THE REPAIRS New 180.00 80.00
3 TO REMOVE AND REFIT REAR BUMPER SENSOR New 100.00 60.00
4 TO CHECK AND RECTIFY WIRING SYSTEM New 80.00 20.00
5 TO PANEL BEAT AND STRAIGHTEN RH REAR CHASSIS FRAME,RH REAR FENDER INNER PANEL,TO CUT AND WELD RH REAR FENDER,INCLUDING REPLACEMENT OF PARTS AND ALIGN WHERE NECESSARY,TO REFIT AND ADJUST THE SAME New 1,200.00 500.00
6 TO PUTTY AND SPRAY PAINT ON AFFECTED AREAS New 800.00 400.00
 
Gross Labour Cost (S$) 2,510.001,060.00
 

< END OF ESTIMATES >