Printing Options
 Hide Company Header - Leave lines blank
 Print continuously - Do not break pages
Adjuster Report
LKK Auto Consultants Pte Ltd (Co.Reg.No:199607198R)
51 Ubi Ave 1 #01-25, Paya Ubi Industrial Park
Singapore 408933
Tel: 6256-3561  Fax: 6844-8805   Email: sur@lkkauto.com;assignments@lkkauto.com

VEHICLE DAMAGE INSPECTION REPORT

  Our File No:CS/CTI21002608/KQF3N2
Date:30/04/2021

REFERENCE
Handling Insurer:China Taiping Insurance (Singapore) Pte. Ltd. Policy No:DMCVSNW00048542000
Claimant Vehicle No : YM8825UInsured Vehicle No : YN8369P
Date of Loss:22/02/2021 Nature of Claim:TP Claim No: SNM21D201049/C02

DESCRIPTION & IDENTIFICATION OF VEHICLE
Reg No:YM8825U
Make & Model:MITSUBISHI FUSO, 3.0 D FE83 (M) Engine No:4M42A56201
Reg. Date:16/05/2008 (Man. Year: 2008) Chassis No: FE83BEA10860
Colour:White Odometer:404655 km
Engine Capacity:2977 cc
Market Value/New Car Price:N/A
Sum Insured (S$):Market Value/New Car Price

CONDITION OF VEHICLE AT THE TIME OF SURVEY
General Condition: Steering (Serviceable):Yes Footbrake (Serviceable):Yes
Handbrake (Serviceable):Yes Engine Modification:No Pre-accident Condition:

CONDITION OF TYRES
Front Tyre Size:700R16X12 Rear Tyre Size:185R14X8 (D)
Front Left Side: Yokohama  3 mm Rear Left Side: Yokohama  3 mm
Front Right Side:Yokohama  3 mm Rear Right Side:Yokohama  3 mm
The above values represent the remaining tyre treads depth

COST OF CLAIMS Repairer's Adjuster's DifferenceDiff %
Parts 4,930.40 1,451.70 3,478.70 70.56
Miscellaneous Items 0.00 0.00 0.00  
Labour 2,540.00 950.00 1,590.00 62.60
Paintwork Labour 0.00 0.00 0.00  
Towing 0.00 0.00 0.00  
  
Calculated Gross Total (S$) 7,470.40 2,401.70 5,068.70 67.85
Approved Total (Overridden) (S$) 1,900.00
  
(S$) 7,470.40 1,900.00 5,570.40 74.57
+ GST 7.00/7.00% (S$) 522.93 133.00 389.93 74.57
  
Nett Amount (S$) 7,993.33 2,033.00 5,960.33 74.57
  

INSPECTION
Date of Assignment:24/02/2021
Date Inspected:19/03/2021 Inspected At:COMPLETE VMS PTE LTD (HQ)
176 Sin Ming Drive #03-14 Sin Ming Autocare Complex
Singapore 575721
Estimated Period of Repair:4.0 days



Adjuster: KENNETH KONG   Manager: SHIAU CHAN
 
NOTE: This report represents our findings at the time and place of inspection stated herein. Such inspection has been carried out to the best of our knowledge and ability but any other liability under any other circumstances is hereby expressly excluded.

 
REPAIR DETAILS
Reference
Part Source: (Last Synchronised: 30 Apr 2021)
Parts:N/AMITSUBISHI FUSO 3.0 D FE83 (M) (Model not available in database)
Labour:Repairer's(Price-denominated Standard List) 
Print Code:(Unsubmitted, no print-code for YM8825U)
Validity:These estimates are valid only if they contain the print code (above) on all estimate pages, running page numbers with the END OF ESTIMATES marker on the last estimate page
Further Info:Items/values not in reference catalogue are prefixed with an asterisk *.


Recommended Parts
Report was unsubmitted during this print-out.
No.Qty Part No. Particulars Condition Repairer's Amount

1 1 *FRONT DOOR L/H Repair 2,201.00 FL *- FL
2 1 *FRONT CORNER PANEL L/H Bent 606.00 FL *556.60 FL
3 1 *HEADLAMP L/H Mtg Cracked 677.00 FL *677.00 FL
4 1 *SIGNAL LAMP L/H Cracked 266.00 FL *266.00 FL
5 1 *FRONT BUMPER Repair 1,110.00 FL *- FL
6 1 *SIDE LAMP LOWER L/H Cracked 196.00 FL *196.00 FL
7 1 *COMPANY LOGO,TELEPHONE STICKER Necessary 380.00 FS *180.00 FS
F=Franchise part. S=SpcNett. L=ListItemDisc.
Sub Total (S$)5,436.00 1,875.60
- List Item Discount on L Items 10.00/25.00% (S$) 505.60423.90
 
Total Parts (S$) 4,930.40 1,451.70
 
 
Recommended Miscellaneous Items
There are no new miscellaneous items selected.

Recommended Labour
Report was unsubmitted during this print-out.
NoParticulars Lab.Type Repairer's Amount

Labour Items
1 TO KNOCK & STRAIGHTEN L/H DOOR FRAME & CHANGE ALL NECESSARY PARTS New 1,200.00 400.00
2 RUST PROOFING TREATMENT New 100.00 30.00
3 CHANGE HEADLAMP,SIGNAL LAMP,SIDE LAMP LOWER L/H AND CHECK ALL WIRINGS New 90.00 20.00
4 SPRAY PAINT DAMAGED AREA AFFECTED New 1,150.00 500.00
 
Gross Labour Cost (S$) 2,540.00950.00
 

< END OF ESTIMATES >