Printing Options
 Hide Company Header - Leave lines blank
 Print continuously - Do not break pages
Adjuster Report
LKK Auto Consultants Pte Ltd (Co.Reg.No:199607198R)
51 Ubi Ave 1 #01-25, Paya Ubi Industrial Park
Singapore 408933
Tel: 6256-3561  Fax: 6844-8805   Email: sur@lkkauto.com;assignments@lkkauto.com

VEHICLE DAMAGE INSPECTION REPORT

  Our File No:CS/TMI21002468/GQF3N2
Date:16/06/2021

REFERENCE
Handling Insurer:Tokio Marine Insurance Singapore Ltd Policy No:MS000953
Claimant Vehicle No : SHD7295DInsured Vehicle No : SMW1119K
Date of Loss:22/02/2021 Nature of Claim:TP Claim No: M2100891

DESCRIPTION & IDENTIFICATION OF VEHICLE
Reg No:SHD7295D
Make & Model:TOYOTA PRIUS HYBRID, 1.8 CVT (A) Engine No:2ZR2B82333
Reg. Date:06/12/2018 (Man. Year: 2018) Chassis No: JTDKB3FU103077540
Colour:Blue Odometer:312890 km
Engine Capacity:1798 cc
Market Value/New Car Price:N/A
Sum Insured (S$):Market Value/New Car Price

CONDITION OF VEHICLE AT THE TIME OF SURVEY
General Condition:Good Steering (Serviceable):Yes Footbrake (Serviceable):Yes
Handbrake (Serviceable):Yes Engine Modification:No Pre-accident Condition:Good

CONDITION OF TYRES
Front Tyre Size:195/65R15 Rear Tyre Size:195/65R15
Front Left Side: West Lake  6 mm Rear Left Side: West Lake  6 mm
Front Right Side:West Lake  6 mm Rear Right Side:West Lake  6 mm
The above values represent the remaining tyre treads depth

COST OF CLAIMS Repairer's Adjuster's DifferenceDiff %
Parts 2,349.97 1,128.95 1,221.02 51.96
Miscellaneous Items 11.00 11.00 0.00 0.00
Labour 1,120.00 640.00 480.00 42.86
Paintwork Labour 0.00 0.00 0.00  
Towing 0.00 0.00 0.00  
  
Calculated Gross Total (S$) 3,480.97 1,779.95 1,701.02 48.87
Approved Total (Overridden) (S$) 1,779.94
  
(S$) 3,480.97 1,779.94 1,701.03 48.87
+ GST 7.00/7.00% (S$) 243.67 124.60 119.07 48.87
  
Nett Amount (S$) 3,724.64 1,904.54 1,820.10 48.87
  

INSPECTION
Date of Assignment:22/02/2021 Present Location:ComfortDelGro Engineering Pte Ltd (Loyang)
Date Inspected:22/02/2021 Inspected At:ComfortDelGro Engineering Pte Ltd (Loyang)
59 Loyang Drive
Singapore 508969
Estimated Period of Repair:2.0 days



Adjuster: XING GUO QIANG   Manager: SHIAU CHAN
 
NOTE: This report represents our findings at the time and place of inspection stated herein. Such inspection has been carried out to the best of our knowledge and ability but any other liability under any other circumstances is hereby expressly excluded.

 
Different 1 cents -Finalise confirm amount: $1779.94
 
 
REPAIR DETAILS
Reference
Part Source:MRM-SGVersion: 1.0 (Last Synchronised: 16 Jun 2021)
Parts:144TOYOTA PRIUS HYBRID 1.8 CVT (A) (Catalogue:Merimen Singapore 1.0)
Labour:Repairer's(Price-denominated Standard List) 
Print Code:(Unsubmitted, no print-code for SHD7295D)
Validity:These estimates are valid only if they contain the print code (above) on all estimate pages, running page numbers with the END OF ESTIMATES marker on the last estimate page
Further Info:Items/values not in reference catalogue are prefixed with an asterisk *.


Recommended Parts
Report was unsubmitted during this print-out.
No.Qty Part No. Particulars Condition Repairer's Reference Amount

1 1 *REAR BUMPER Deformed 458.60 FL - *458.60 FL
2 1 *REAR BUMPER CENTER GUARD Deformed 552.60 FL - *552.60 FL
3 1 *REAR BUMPER REINFORCEMENT Not Necessary 318.80 FL - *- FL
4 1 *REAR BUMPER EXTENSION RH Broken 232.00 FL - *232.00 FL
5 1 *REAR BUMPER RETAINER RH Deformed 112.70 FL - *112.70 FL
6 1 *REAR BUMPER TOW COVER Cut 82.70 FL - *82.70 FL
7 1 *TAILLAMP UPR RH Not Necessary 557.90 FL - *- FL
8 1 *TAILLAMP LWR RH Not Necessary 548.40 FL - *- FL
9 10 *REAR BUMPER CLIPS Not Necessary 22.00 FL - *- FL
10 1 *REVERSE SENSOR Not Necessary 135.70 F - *- FS
11 1 *REAR BUMPER MAT Necessary 50.00 F - *50.00 FS
F=Franchise part. S=SpcNett. L=ListItemDisc.
Sub Total (S$)3,071.40 1,488.60
- List Item Discount on L Items 25.00/25.00% (S$) 721.43359.65
 
Total Parts (S$) 2,349.97    1,128.95
 
 
Recommended Miscellaneous Items
NoQtyParticulars Repairer's Amount

Miscellaneous Items
1 1 OD/TP Case (Insurer) 11.00 11.00
 
 Sub Total (S$) 11.0011.00
 

Recommended Labour
Report was unsubmitted during this print-out.
NoParticulars Lab.Type Repairer's Amount

Labour Items
1 PANEL BEATING New 400.00 350.00
2 SPRAY PAINTING New 600.00 250.00
3 R/I REVERSE SENSOR New 120.00 40.00
 
Gross Labour Cost (S$) 1,120.00640.00
 

< END OF ESTIMATES >