Adjuster Report
VEHICLE DAMAGE INSPECTION REPORT
|
AIG Asia Pacific Insurance Pte. Ltd. AIG Building, 78 Shenton Way, #09-16 Singapore 079120 |
Our File No: | CS/AIG21002392/EVD3N2 |
| Date: | 05/04/2021 |
REFERENCE |
| Insured/Claimant: | CHIN SWEE KHONG |
Policy No: | 1900161688-01 |
| Date of Loss: | 16/02/2021 |
Nature of Claim: | OD |
Claim No: |
5207785616SG
|
| DESCRIPTION & IDENTIFICATION OF VEHICLE |
| Reg No: | SMP1799J |
| Make & Model: | MITSUBISHI OUTLANDER, 2.0 (A) |
Engine No: | 4J11BJ0870 |
| Reg. Date: | 13/09/2019 (Man. Year: 2019) |
Chassis No: |
GF7W0602003 |
| Colour: | White |
Odometer: | 49833 km |
| Engine Capacity: | 1998 cc |
| Market Value/New Car Price: | S$105,000.00 |
| Sum Insured (S$): | Market Value/New Car Price |
| CONDITION OF VEHICLE AT THE TIME OF SURVEY |
| General Condition: | |
Steering (Serviceable): | Yes | Footbrake (Serviceable): | Yes |
| Handbrake (Serviceable): | Yes |
Engine Modification: | No |
Pre-accident Condition: | |
| CONDITION OF TYRES |
| Front Tyre Size: | 225/55R18 |
Rear Tyre Size: | 225/55R18 |
|
Front Left Side:
| Toyo 4 mm | |
Rear Left Side:
| Toyo 4 mm | |
| Front Right Side: | Toyo 4 mm | |
Rear Right Side: | Toyo 4 mm | |
| The above values represent the remaining tyre treads depth |
| Parts |
7,125.62 |
6,079.19
|
1,046.43 |
14.69 |
| Miscellaneous Items |
0.00 |
0.00 |
0.00 |
|
| Labour |
7,115.00 |
4,760.00 |
2,355.00 |
33.10 |
| Paintwork Labour |
0.00 |
0.00 |
0.00 |
|
| Towing |
0.00 |
0.00 |
0.00 |
|
| | |
|
Calculated Gross Total
(S$)
|
14,240.62 |
10,839.19 |
3,401.43 |
23.89 |
| - Excess (S$) |
600.00 |
600.00 |
0.00 |
0.00 |
| | |
| (S$) |
13,640.62 |
10,239.19 |
3,401.43 |
24.94 |
| +
GST 7.00/7.00% (S$)
|
954.84 |
716.74 |
238.10 |
24.94 |
| | |
| Nett Amount (S$) |
14,595.46 |
10,955.93 |
3,639.53 |
24.94 |
| | |
| INSPECTION |
| Date of Assignment: | 19/02/2021 |
| Date Inspected: | 22/02/2021 |
Inspected At: | Cycle & Carriage Automotive Pte Ltd (Pandan Gardens) 209 Pandan Gardens Singapore 609339 |
| Estimated Period of Repair: | 10.0 days |
| Adjuster: |
CHEN TSUE YEE |
|
Manager:
|
VERON CHEN
|
|
|
|
|
|
|
NOTE: This report represents our findings at the time and place of inspection stated herein. Such inspection has been carried out to the best of our knowledge and ability but any other liability under any other circumstances is hereby expressly excluded.
|
Recommended Parts
| Report was unsubmitted during this print-out. |
| No. | Qty |
Part No. |
Particulars |
Condition | Repairer's | |
Amount |
|
| 1 |
1 |
|
*PANEL ASSY,FR DOOR,LH |
Dented |
982.00 |
FL |
*982.00 |
FL |
| 2 |
1 |
|
*MLDG,F/DR WDO BELT LINE,LH |
Not Necessary |
130.00 |
FL |
*- |
FL |
| 3 |
1 |
|
*GARNISH,FR DOOR,LH |
Necessary |
190.00 |
FL |
*190.00 |
FL |
| 4 |
1 |
|
*TAPE,FR DOOR SASH,LH |
Necessary |
42.00 |
FL |
*42.00 |
FL |
| 5 |
1 |
|
*LATCH,FR DOOR,LH |
Not Necessary |
322.00 |
FL |
*- |
FL |
| 6 |
1 |
|
*PANEL ASSY,RR DOOR,LH |
Dented |
864.00 |
FL |
*864.00 |
FL |
| 7 |
1 |
|
*MLDG,R/DR WDO BELT LINE,LH |
Not Necessary |
124.00 |
FL |
*- |
FL |
| 8 |
1 |
|
*W/STRIP,R/DR OPN,LWR OTR L |
Not Necessary |
33.00 |
FL |
*- |
FL |
| 9 |
1 |
|
*HINGE,RR DOOR,UPR LH |
Not Necessary |
43.00 |
FL |
*- |
FL |
| 10 |
1 |
|
*HINGE,RR DOOR,LWR LH |
Bent |
43.00 |
FL |
*43.00 |
FL |
| 11 |
1 |
|
*W/STRIP R/DR OPNG,OTR LH |
Not Necessary |
139.00 |
FL |
*- |
FL |
| 12 |
1 |
|
*W/STRIP R/DR OPNG,INR LH |
Not Necessary |
195.00 |
FL |
*- |
FL |
| 13 |
1 |
|
*GARNISH,RR DOOR,LH |
Necessary |
164.00 |
FL |
*164.00 |
FL |
| 14 |
1 |
|
*TAPE,RR DOOR SASH |
Necessary |
42.00 |
FL |
*42.00 |
FL |
| 15 |
1 |
|
*TAPE,RR DOOR SASH |
Necessary |
42.00 |
FL |
*42.00 |
FL |
| 16 |
1 |
|
*LATCH,RR DOOR,LH |
Not Necessary |
321.00 |
FL |
*- |
FL |
| 17 |
1 |
|
*STRIKER,FR DOOR LATCH |
Not Necessary |
20.00 |
FL |
*- |
FL |
| 18 |
1 |
|
*CHECK,RR DOOR |
Not Necessary |
32.00 |
FL |
*- |
FL |
| 19 |
1 |
|
*PANEL,QTR,OTR LH |
Dented |
1,298.00 |
FL |
*1,298.00 |
FL |
| 20 |
1 |
|
*MOULDING,RR WHEEL ARCH,LH |
Cut |
160.00 |
FL |
*160.00 |
FL |
| 21 |
1 |
|
*MOULDING,RR BUMPER,LH |
Cut |
106.00 |
FL |
*106.00 |
FL |
| 22 |
1 |
|
*GLASS,QTR WINDOW,LH |
Necessary |
713.00 |
FL |
*713.00 |
FL |
| 23 |
1 |
|
*WHEEL,DISC LHR |
Cut |
974.00 |
FL |
*974.00 |
FL |
| 24 |
1 |
|
*BODY KIT,OUTLANDER |
Cut |
1,554.00 |
FS |
*1,554.00 |
FS |
| 25 |
1 |
|
*SUNDRIES |
Necessary |
20.00 |
FS |
*20.00 |
FS |
| 26 |
1 |
|
*BODY PNL SEALANT |
Necessary |
80.00 |
FS |
*80.00 |
FS |
| 27 |
1 |
|
*W/STRIP,RR DOOR OPNG,FR LH (Supplementary) |
Torn |
127.00 |
FL |
*127.00 |
FL |
| F=Franchise part. S=SpcNett. L=ListItemDisc. |
|
| Sub Total (S$) | 8,760.00 | |
7,401.00
| |
| - List Item Discount on L Items 23.00/23.00% (S$) |
1,634.38 | | 1,321.81 | |
| |
|
| Total Parts (S$) |
7,125.62 | | 6,079.19 | |
| |
|
Recommended Miscellaneous Items
| No | Qty | Particulars |
Repairer's |
Amount |
|
| Miscellaneous Items |
| 1 |
1 |
*OD/TP Case (Insurer) |
- |
0.00 |
| |
|
| | Sub Total (S$) |
0.00 | 0.00 |
| |
|
Recommended Labour
| Report was unsubmitted during this print-out. |
| No | Particulars |
Lab.Type | Repairer's | Amount |
|
| Labour Items |
| 1 |
RENEW LHF DOOR,LHR DOOR & LHR FENDER.REPAIR & RE-ALIGN RR BUMPER,LH CENTRE PILLAR & LH ROCKER PNL |
New |
3,150.00 | 2,025.00 |
| 2 |
RESPRAY LHF DOOR,LHR DOOR,LHR FENDER,LH CENTRE PILLAR,LH ROCKER PNL & RR BUMPER |
New |
2,100.00 | 1,050.00 |
| 3 |
REMOVE & REFIT LHF DOOR COMPONENT |
New |
120.00 | 120.00 |
| 4 |
REMOVE & REFIT LHR DOOR COMPONENT |
New |
120.00 | 120.00 |
| 5 |
REMOVE & REFIT RR FLR BOARD,TRIM CARPET & SEAT |
New |
120.00 | 120.00 |
| 6 |
RENEW LHR SPORT & TYRE |
New |
30.00 | 30.00 |
| 7 |
SUPPLY LHR TYRE-TOYO A24 225/55 R18 |
New |
480.00 | 480.00 |
| 8 |
CHECK WIRING ELECTRICAL SYSTEM |
New |
30.00 | 30.00 |
| 9 |
TO CARRY OUT DIAGNOSTIC CHECK USING HI-SCAN PRO TEST USING HI-SCAN PRO TEST |
New |
120.00 | 120.00 |
| 10 |
TO CONDUCT COMPUTERIZE FULL WHEEL ALIGNMENT |
New |
120.00 | 120.00 |
| 11 |
REMOVE & REFIT LHR FENDER QTR GLASS |
New |
120.00 | 120.00 |
| 12 |
SUPPLY QTR GLASS SEALANT |
New |
80.00 | 80.00 |
| 13 |
INSTALL QTR GLASS SOLAR FILM |
New |
100.00 | - |
| 14 |
REMOVE & REFIT REVERSE SENSOR |
New |
80.00 | 80.00 |
| 15 |
APPLY ANTI CORROSION ON AFFECTED AREAS |
New |
120.00 | 40.00 |
| 16 |
REMOVE & INSTALL FEUL TANK TO FACILITATE REPAIR (Supplementary) |
New |
225.00 | 225.00 |
| |
|
| Gross Labour Cost (S$) |
7,115.00 | 4,760.00 |
| |
|
< END OF ESTIMATES >