Adjuster Report
VEHICLE DAMAGE INSPECTION REPORT
|
AIG Asia Pacific Insurance Pte. Ltd. AIG Building, 78 Shenton Way, #09-16 Singapore 079120 |
Our File No: | CC3/AIG21002212/R1TD3N2 |
| Date: | 02/08/2021 |
REFERENCE |
| Insured/Claimant: | BADER AXEL |
Policy No: | 1900079159-01 |
| Date of Loss: | 10/02/2021 |
Nature of Claim: | OD |
Claim No: |
0695577170SG
|
| DESCRIPTION & IDENTIFICATION OF VEHICLE |
| Reg No: | SMJ7843G |
| Make & Model: | AUDI A3, 1.4 TFSI (A) |
Engine No: | CHZC27715 |
| Reg. Date: | 20/03/2019 (Man. Year: 2019) |
Chassis No: |
WAUZZZ8V0KA059576 |
| Colour: | Grey |
Odometer: | 6845 km |
| Engine Capacity: | 999 cc |
| Market Value/New Car Price: | S$101,000.00 |
| Sum Insured (S$): | Market Value/New Car Price |
| CONDITION OF VEHICLE AT THE TIME OF SURVEY |
| General Condition: | |
Steering (Serviceable): | Yes | Footbrake (Serviceable): | Yes |
| Handbrake (Serviceable): | Yes |
Engine Modification: | No |
Pre-accident Condition: | |
| CONDITION OF TYRES |
| Front Tyre Size: | 205/55R16 |
Rear Tyre Size: | 205/55R16 |
|
Front Left Side:
| Bridgestone 6 mm | |
Rear Left Side:
| Bridgestone 6 mm | |
| Front Right Side: | Bridgestone 6 mm | |
Rear Right Side: | Bridgestone 6 mm | |
| The above values represent the remaining tyre treads depth |
| Parts |
11,138.00 |
8,000.64
|
3,137.36 |
28.17 |
| Miscellaneous Items |
0.00 |
0.00 |
0.00 |
|
| Labour |
14,902.00 |
9,627.00 |
5,275.00 |
35.40 |
| Paintwork Labour |
0.00 |
0.00 |
0.00 |
|
| Towing |
0.00 |
0.00 |
0.00 |
|
| | |
|
Calculated Gross Total
(S$)
|
26,040.00 |
17,627.64 |
8,412.36 |
32.31 |
| - Excess (S$) |
600.00 |
600.00 |
0.00 |
0.00 |
| | |
| (S$) |
25,440.00 |
17,027.64 |
8,412.36 |
33.07 |
| +
GST 7.00/7.00% (S$)
|
1,780.80 |
1,191.93 |
588.87 |
33.07 |
| | |
| Nett Amount (S$) |
27,220.80 |
18,219.57 |
9,001.23 |
33.07 |
| | |
| INSPECTION |
| Date of Assignment: | 16/02/2021 |
| Date Inspected: | 16/02/2021 |
Inspected At: | 281 ALEXANDR ROAD REPAIRER: PREMIUM AUTOMOBILES PTE LTD 55 UBI ROAD 1 . SINGAPORE 408699 |
| Estimated Period of Repair: | 12.0 days |
| Adjuster: |
MOHD RASUL |
|
Manager:
|
DENISE TAY KWEE CHENG
|
|
|
|
|
|
|
NOTE: This report represents our findings at the time and place of inspection stated herein. Such inspection has been carried out to the best of our knowledge and ability but any other liability under any other circumstances is hereby expressly excluded.
|
Recommended Parts
| Report was unsubmitted during this print-out. |
| No. | Qty |
Part No. |
Particulars |
Condition | Repairer's | |
Amount |
|
| 1 |
1 |
|
*REAR FENDER-LH |
Bent |
4,140.00 |
FS |
*3,312.00 |
FS |
| 2 |
1 |
|
*REAR SIDE WINDOW-LH |
Necessary |
292.00 |
FS |
*233.60 |
FS |
| 3 |
1 |
|
*REAR SIDE WINDOW TRIM STRIPS-LH |
Necessary |
261.00 |
FS |
*208.80 |
FS |
| 4 |
1 |
|
*REAR WHEEL HOUSING LINER-LH |
Serviceable |
240.00 |
FS |
*- |
FS |
| 5 |
1 |
|
*REAR WHEEL HOUSING LINER ATTACHMENT PARTS-LH |
Serviceable |
57.00 |
FS |
*- |
FS |
| 6 |
1 |
|
*REAR DOOR-LH |
Bent |
2,767.00 |
FS |
*2,213.60 |
FS |
| 7 |
1 |
|
*REAR DOOR OUTER SEAL-LH |
Necessary |
161.00 |
FS |
*128.40 |
FS |
| 8 |
1 |
|
*BONDING AGENT |
Not Necessary |
49.00 |
FS |
*- |
FS |
| 9 |
1 |
|
*CLEANING SOLUTION |
Not Necessary |
68.00 |
FS |
*- |
FS |
| 10 |
1 |
|
*APPLICATOR |
Not Necessary |
8.00 |
FS |
*- |
FS |
| 11 |
1 |
|
*REAR DOOR CATCH-LH |
Necessary |
94.00 |
FS |
*74.80 |
FS |
| 12 |
1 |
|
*REAR DOOR ATTACHMENT PARTS-LH |
Serviceable |
129.00 |
FS |
*- |
FS |
| 13 |
1 |
|
*REAR DOOR HANDLE EXTERIOR-LH |
Repair |
374.00 |
FS |
*- |
FS |
| 14 |
1 |
|
*REAR DOOR HANDLE HOUSING-LH |
Serviceable |
52.00 |
FS |
*- |
FS |
| 15 |
1 |
|
*REAR ALUMINIUM RIM-LH |
Scratched |
1,166.00 |
FS |
*932.80 |
FS |
| 16 |
1 |
|
*ACRYLIC SEALANT |
Necessary |
180.00 |
FS |
*180.00 |
FS |
| 17 |
1 |
|
*CAVITY WAX |
Necessary |
140.00 |
FS |
*140.00 |
FS |
| 18 |
1 |
|
*STONE CHIP |
Necessary |
180.00 |
FS |
*180.00 |
FS |
| 19 |
1 |
|
*METAL FILLER POWDER |
Necessary |
280.00 |
FS |
*280.00 |
FS |
| 20 |
1 |
|
*1/4 GLASS SEALANT |
Necessary |
100.00 |
FS |
*100.00 |
FS |
| 21 |
1 |
|
*SUNDRIES |
Necessary |
400.00 |
FS |
*16.64 |
FS |
| F=Franchise part. S=SpcNett. |
|
| Total Parts (S$) |
11,138.00 | | 8,000.64 | |
| |
|
Recommended Miscellaneous Items
There are no new miscellaneous items selected. |
Recommended Labour
| Report was unsubmitted during this print-out. |
| No | Particulars |
Lab.Type | Repairer's | Amount |
|
| Labour Items |
| 1 |
TO REMOVE AND RENEW REAR PARKING AID.CHECK FUNCTION AND RENEW ACCORDING TO DAMAGE |
New |
280.00 | 280.00 |
| 2 |
TO RENEW 1/4 GLASS TO FACILITATE FENDER RENEWAL |
New |
300.00 | 300.00 |
| 3 |
TO INSTALL SOLAR FILM FOR 1/4 GLASS |
New |
400.00 | 0.00 |
| 4 |
TO CARRY OUT WATER SEEPAGE TEST FOR 1/4 GLASS |
New |
200.00 | 200.00 |
| 5 |
TO DISLODGE AND REINSTALL REAR WIRE HARNESS FOR LIGHTS,BATTERY MANAGER,FUSE AND RELAY TRAYS,ELECTRICAL AND AUDIO EQUIPMENT |
New |
1,400.00 | 1,400.00 |
| 6 |
TO REMOVE AND REINSTALL REAR SEAT,BACK REST,HAT TRAY,ABCD PILLAR TRIMS,LUGGAGE COMPARTMENT TRIMS.DISLODGE ROOF LINER AND DISENGAGE CURTAIN AIRBAG ETC |
New |
1,400.00 | 1,400.00 |
| 7 |
TO DISMANTLE AND REINSTALL REAR BUMPER.TO RENEW LHS REAR DOOR.CUT OUT AND WELD LHS REAR FENDER.RE-ORGANISE CRASH MANAGEMENT COMPONENTS.REINSTALL ALL PARTS REMOVED |
New |
5,600.00 | 3,000.00 |
| 8 |
TO RESPRAY REAR BUMPER,LHS REAR DOOR,LHS REAR FENDER,DOOR HANDLE,DOOR ENTRANCES,ROOF CHANNEL,DRAIN PANEL AND END PANELLING .TO CARRY OUT STONE CHIP TREATMENT ABD JOINT SEALER WORKS |
New |
4,850.00 | 2,575.00 |
| 9 |
TO RENEW LHS REAR RIM AND CARRY OUT WHEEL ALIGNMENT |
New |
280.00 | 280.00 |
| 10 |
TO CARRY OUT DIAGNOSTIC CHECK |
New |
192.00 | 192.00 |
| |
|
| Gross Labour Cost (S$) |
14,902.00 | 9,627.00 |
| |
|
< END OF ESTIMATES >