Printing Options
 Hide Company Header - Leave lines blank
 Print continuously - Do not break pages
Adjuster Report
LKK Auto Consultants Pte Ltd (Co.Reg.No:199607198R)
51 Ubi Ave 1 #01-25, Paya Ubi Industrial Park
Singapore 408933
Tel: 6256-3561  Fax: 6844-8805   Email: sur@lkkauto.com;assignments@lkkauto.com

VEHICLE DAMAGE INSPECTION REPORT

AIG Asia Pacific Insurance Pte. Ltd.
AIG Building, 78 Shenton Way, #09-16
Singapore 079120
Our File No:CS/AIG21001966/KVF3N2
Date:20/04/2021

REFERENCE
Insured/Claimant:DAIMLER FLEET MANAGEMENT SINGAPORE PTE LTD Policy No:0999993651
Date of Loss:22/01/2021 Nature of Claim:OD Claim No: 3827609198SG

DESCRIPTION & IDENTIFICATION OF VEHICLE
Reg No:GBF458H
Make & Model:TOYOTA HIACE, 3.0 D TURBO 5 DR (M) Engine No:1KD2620306
Reg. Date:10/06/2016 (Man. Year: 2016) Chassis No: JTFHT02P100198163
Colour:Yellow Odometer:125516 km
Engine Capacity:2982 cc
Market Value/New Car Price:S$52,000.00
Sum Insured (S$):Market Value/New Car Price

CONDITION OF VEHICLE AT THE TIME OF SURVEY
General Condition: Steering (Serviceable):Yes Footbrake (Serviceable):Yes
Handbrake (Serviceable):Yes Engine Modification:No Pre-accident Condition:

CONDITION OF TYRES
Front Tyre Size:195R15X8 Rear Tyre Size:195R15X8
Front Left Side: Yokohama  9 mm Rear Left Side: Bridgestone  7 mm
Front Right Side:Yokohama  9 mm Rear Right Side:Bridgestone  7 mm
The above values represent the remaining tyre treads depth

COST OF CLAIMS Repairer's Adjuster's DifferenceDiff %
Parts 5,468.65 5,014.80 453.85 8.30
Miscellaneous Items 0.00 0.00 0.00  
Labour 2,230.00 1,220.00 1,010.00 45.29
Paintwork Labour 0.00 0.00 0.00  
Towing 0.00 0.00 0.00  
  
Calculated Gross Total (S$) 7,698.65 6,234.80 1,463.85 19.01
- Excess (S$) 1,900.00 1,900.00 0.00 0.00
  
(S$) 5,798.65 4,334.80 1,463.85 25.24
+ GST 7.00/7.00% (S$) 405.91 303.44 102.47 25.24
  
Nett Amount (S$) 6,204.56 4,638.24 1,566.32 25.24
  

INSPECTION
Date of Assignment:09/02/2021
Date Inspected:10/02/2021 Inspected At:Tong Luck Auto Pte Ltd (HQ)
160 Sin Ming Drive, #07-01 Sin Ming AutoCity
Singapore 575722
Estimated Period of Repair:5.0 days



Adjuster: KENNETH KONG   Manager: VERON CHEN
 
NOTE: This report represents our findings at the time and place of inspection stated herein. Such inspection has been carried out to the best of our knowledge and ability but any other liability under any other circumstances is hereby expressly excluded.

 
REPAIR DETAILS


Recommended Parts
Report was unsubmitted during this print-out.
No.Qty Part No. Particulars Condition Repairer's Amount

1 1 *BONNET (WCP) Bent 420.00 F *420.00 F
2 2 *BONNET HINGES-LH/RH (WCP) Repair 76.00 F *- F
3 1 *BONNET EMBLEM (WCP) Necessary 48.00 F *48.00 F
4 1 *BONNET LOCK (WCP) Distorted 60.00 F *60.00 F
5 1 *BONNET LOCK CABLE (WCP) Serviceable 45.00 F *- F
6 1 *SUPPORT PANEL (WCP) Bent 280.00 F *280.00 F
7 1 *BRACE PANEL (WCP) Bent 65.00 F *65.00 F
8 2 *HEADLAMP ASSY-RH/LH (WCP) O/s Mtg Cracked/N/s Mtg Broken 900.00 F *900.00 F
9 1 *FRONT GRILLE (TOP)(WCP) Cracked 165.00 F *165.00 F
10 1 *FRONT GRILLE (BOTTOM)(WCP) Cracked 225.00 F *225.00 F
11 1 *FRONT GRILLE (INNER)(WCP) Cracked 280.00 F *280.00 F
12 1 *FRONT BUMPER (WCP) Bent 380.00 F *380.00 F
13 1 *FRONT BUMPER REINFORCEMENT (WCP) Repair 180.00 F *- F
14 1 *FRONT BUMPER CENTER GRILLE (WCP) Distorted 90.00 F *90.00 F
15 1 *RADIATOR ASSY (WCP) Punctured 780.00 F *780.00 F
16 1 *AIR-CON CONDERSER (WCP) Punctured 650.00 F *650.00 F
17 2 *RADIATOR COOLANT (BOTTLE) Necessary 132.00 FS *50.00 FS
18 1 *FRONT RADIATOR TOP BEAM (WCP)
(Supplementary)
Bent 125.00 F *125.00 F
19 1 *FRONT BUMPER CLIPS
(15PCS)
Necessary 90.75 FS *50.00 FS
F=Franchise part. S=SpcNett.
Sub Total (S$)4,991.75 4,568.00
+ Margin on L,N Items 10.00/10.00% (S$) 476.90446.80
 
Total Parts (S$) 5,468.65 5,014.80
 
 
Recommended Miscellaneous Items
There are no new miscellaneous items selected.

Recommended Labour
Report was unsubmitted during this print-out.
NoParticulars Lab.Type Repairer's Amount

Labour Items
1 TO REMOVE AND REFIT AIR-CON CONDENSER,RADIATOR ASSY AND REFILL AIR-CON GAS New 150.00 100.00
2 TO CHECK AND RECTIFY WIRING SYSTEM New 80.00 20.00
3 TO PANEL BEAT AND STRAIGHTEN FRONT CHASSIS FRAME,INCLUDING REPLACEMENT OF PARTS AND ALIGN WHERE NECESSARY,TO REFIT AND ADJUST THE SAME New 1,200.00 600.00
4 TO PUTTY AND SPRAY PAINT ON AFFECTED AREAS New 800.00 500.00
 
Gross Labour Cost (S$) 2,230.001,220.00
 

< END OF ESTIMATES >