Printing Options
 Hide Company Header - Leave lines blank
 Print continuously - Do not break pages
Adjuster Report
LKK Auto Consultants Pte Ltd (Co.Reg.No:199607198R)
51 Ubi Ave 1 #01-25, Paya Ubi Industrial Park
Singapore 408933
Tel: 6256-3561  Fax: 6844-8805   Email: sur@lkkauto.com;assignments@lkkauto.com

VEHICLE DAMAGE INSPECTION REPORT

AIG Asia Pacific Insurance Pte. Ltd.
AIG Building, 78 Shenton Way, #09-16
Singapore 079120
Our File No:CC3/AIG21001640/R1VF3N2
Date:28/05/2021

REFERENCE
Insured/Claimant:TEH MING HONG Policy No:1900156528
Date of Loss:29/01/2021 Nature of Claim:OD Claim No: 1504545324SG

DESCRIPTION & IDENTIFICATION OF VEHICLE
Reg No:SKE6338E
Make & Model:AUDI Q5, 2.0 (A) Engine No:DAX058548
Reg. Date:30/08/2019 (Man. Year: 2019) Chassis No: WAUZZZFY1K2125866
Colour:Grey Odometer:12016 km
Engine Capacity:1984 cc
Market Value/New Car Price:S$183,000.00
Sum Insured (S$):Market Value/New Car Price

CONDITION OF VEHICLE AT THE TIME OF SURVEY
General Condition: Steering (Serviceable):Yes Footbrake (Serviceable):Yes
Handbrake (Serviceable):Yes Engine Modification:No Pre-accident Condition:

CONDITION OF TYRES
Front Tyre Size:235/55R19 Rear Tyre Size:235/55R19
Front Left Side: Continental  6 mm Rear Left Side: Continental  6 mm
Front Right Side:Continental  6 mm Rear Right Side:Continental  6 mm
The above values represent the remaining tyre treads depth

COST OF CLAIMS Repairer's Adjuster's DifferenceDiff %
Parts 9,279.00 4,079.84 5,199.16 56.03
Miscellaneous Items 0.00 0.00 0.00  
Labour 5,752.00 3,072.00 2,680.00 46.59
Paintwork Labour 0.00 0.00 0.00  
Towing 0.00 0.00 0.00  
  
Calculated Gross Total (S$) 15,031.00 7,151.84 7,879.16 52.42
- Excess (S$) 1,000.00 1,000.00 0.00 0.00
  
(S$) 14,031.00 6,151.84 7,879.16 56.16
+ GST 7.00/7.00% (S$) 982.17 430.63 551.54 56.16
  
Nett Amount (S$) 15,013.17 6,582.47 8,430.70 56.16
  

INSPECTION
Date of Assignment:03/02/2021
Date Inspected:03/02/2021 Inspected At:281 Alexandra Rd
Singapore 159938
Repairer:Premium Automobiles Pte Ltd
Estimated Period of Repair:5.0 days



Adjuster: MOHD RASUL   Manager: VERON CHEN
 
NOTE: This report represents our findings at the time and place of inspection stated herein. Such inspection has been carried out to the best of our knowledge and ability but any other liability under any other circumstances is hereby expressly excluded.

 
REPAIR DETAILS


Recommended Parts
Report was unsubmitted during this print-out.
No.Qty Part No. Particulars Condition Repairer's Amount

1 1 *REAR DOOR-LH Bent 4,085.00 FS *3,268.00 FS
2 1 *REAR DOOR OUTER SEAL-LH Necessary 205.00 FS *164.00 FS
3 1 *BONDING AGENT Not Necessary 49.00 FS *- FS
4 1 *CLEANING SOLUTION Not Necessary 68.00 FS *- FS
5 1 *APPLICATOR Not Necessary 8.00 FS *- FS
6 1 *SEALING STRIP Necessary 17.00 FS *12.96 FS
7 1 *REAR DOOR ATTACHMENT PARTS Not Necessary 222.00 FS *- FS
8 1 *REAR DOOR SEAL BRACKET-LH Necessary 43.00 FS *33.76 FS
9 1 *REAR DOOR CATCH-LH Serviceable 146.00 FS *- FS
10 1 *REAR SILL PANEL-LH Serviceable 253.00 FS *- FS
11 1 *REAR DOOR COVER-LH Scratched 689.00 FS *551.20 FS
12 1 *FRONT DOOR COVER-LH Serviceable 790.00 FS *- FS
13 1 *REAR WHEEL ARCH TRIM-LH Serviceable 583.00 FS *- FS
14 1 *REAR ALUMINIUM RI-LH Serviceable 1,821.00 FS *- FS
15 1 *SUNDRIES Necessary 300.00 FS *49.92 FS
F=Franchise part. S=SpcNett.
Total Parts (S$) 9,279.00 4,079.84
 
 
Recommended Miscellaneous Items
There are no new miscellaneous items selected.

Recommended Labour
Report was unsubmitted during this print-out.
NoParticulars Lab.Type Repairer's Amount

Labour Items
1 TO REMOVE AND TRANSFER LHS REAR DOORS MULTI-LOCK SYSTEM AND POWER WINDOW DEVICES New 400.00 400.00
2 TO REMOVE AND REINSTALL LHS FRONT DOOR PANEL TRIM.TO REMOVE AND REINSTALL LHS WING MIRROR ASSY New 280.00 280.00
3 TO DISMANTLE AND RENEW LHS REAR DOOR.RE-ORGANIZE CRASH MANAGEMENT COMPONENTS.REINSTALL ALL PARTS REMOVED New 1,200.00 500.00
4 TO RESPRAY LHS REAR DOOR,DOOR COVERS,LHS FRONT DOOR AND LHS REAR WHEEL ARC TRIM New 3,400.00 1,700.00
5 TO RENEW LHS REAR RIM AND CARRY OUT WHEEL ALIGNMENT New 280.00 0.00
6 TO CARRY OUT DIAGNOSTIC CHECK New 192.00 192.00
 
Gross Labour Cost (S$) 5,752.003,072.00
 

< END OF ESTIMATES >