Printing Options
 Hide Company Header - Leave lines blank
 Print continuously - Do not break pages
Adjuster Report
LKK Auto Consultants Pte Ltd (Co.Reg.No:199607198R)
51 Ubi Ave 1 #01-25, Paya Ubi Industrial Park
Singapore 408933
Tel: 6256-3561  Fax: 6844-8805   Email: sur@lkkauto.com;assignments@lkkauto.com

VEHICLE DAMAGE INSPECTION REPORT

  Our File No:CS/MSG21001416/DQD3N2
Date:14/05/2021

REFERENCE
Handling Insurer:MSIG Insurance (Singapore) Pte. Ltd. Policy No:1001568515
Claimant Vehicle No : FBB3815LInsured Vehicle No : PC6786X
Date of Loss:25/01/2021 Nature of Claim:TP Claim No: 252572

DESCRIPTION & IDENTIFICATION OF VEHICLE
Reg No:FBB3815L
Make & Model:YAMAHA RXZ, 133cc (M) Engine No:5PV018315
Reg. Date:15/03/2007 (Man. Year: 2007) Chassis No: PMY5PV10070018315
Colour:Yellow Odometer:61509 km
Engine Capacity:133 cc
Market Value/New Car Price:N/A
Sum Insured (S$):Market Value/New Car Price

CONDITION OF VEHICLE AT THE TIME OF SURVEY
General Condition: Steering (Serviceable):Yes Footbrake (Serviceable):Yes
Handbrake (Serviceable):Yes Engine Modification:No Pre-accident Condition:

CONDITION OF TYRES
Front Tyre Size:80/80R18 Rear Tyre Size:80/80R18
Front Left Side: Dunlop  2 mm Rear Left Side: Dunlop  2 mm
Front Right Side:  0 mm Rear Right Side:  0 mm
The above values represent the remaining tyre treads depth

COST OF CLAIMS Repairer's Adjuster's DifferenceDiff %
Parts 4,237.20 2,222.10 2,015.10 47.56
Miscellaneous Items 0.00 0.00 0.00  
Labour 620.00 290.00 330.00 53.23
Paintwork Labour 0.00 0.00 0.00  
Towing 0.00 0.00 0.00  
  
Calculated Gross Total (S$) 4,857.20 2,512.10 2,345.10 48.28
Approved Total (Overridden) (S$) 2,000.00
  
Nett Amount (S$) 4,857.20 2,000.00 2,857.20 58.82
  

INSPECTION
Date of Assignment:29/01/2021
Date Inspected:29/01/2021 Inspected At:Sg 98 Motor Pte Ltd (HQ)
BLK 4001 ANG MO KIO INDUSTRIAL PARK 1 #01-21
Singapore 569622
Estimated Period of Repair:4.0 days



Adjuster: BRYAN TANI   Manager: SHIAU CHAN
 
NOTE: This report represents our findings at the time and place of inspection stated herein. Such inspection has been carried out to the best of our knowledge and ability but any other liability under any other circumstances is hereby expressly excluded.

 
REPAIR DETAILS
Reference
Part Source: (Last Synchronised: 14 May 2021)
Parts:N/AYAMAHA RXZ 133cc (M) (Model not available in database)
Labour:Repairer's(Price-denominated Standard List) 
Print Code:(Unsubmitted, no print-code for FBB3815L)
Validity:These estimates are valid only if they contain the print code (above) on all estimate pages, running page numbers with the END OF ESTIMATES marker on the last estimate page
Further Info:Items/values not in reference catalogue are prefixed with an asterisk *.


Recommended Parts
Report was unsubmitted during this print-out.
No.Qty Part No. Particulars Condition Repairer's Amount

1 2 *HANDLE BAR L/RH Bent 180.00 FL *180.00 FL
2 1 *CLUTCH LEVER Not Necessary 75.00 FL *- FL
3 1 *BRAKE LEVER Cut 68.00 FL *68.00 FL
4 1 *SET FORK TUBE Bent 480.00 FL *480.00 FL
5 1 *FORK UNDER BRACKET Damaged 230.00 FL *230.00 FL
6 1 *FORK OIL SEAL Necessary 120.00 FL *120.00 FL
7 1 *FRONT MUDGUARD Repair 150.00 FL *- FL
8 1 *HEAD LAMP Dislodged/Broken 580.00 FL *268.00 FL
9 1 *HEAD COWLING Dislodged/Broken 230.00 FL *230.00 FL
10 2 *FRONT SIGNAL L/RH Dislodged/Broken 130.00 FL *110.00 FL
11 1 *LAMP STAY Bent 160.00 FL *98.00 FL
12 1 *FRONT BRAKE DISC Not Necessary 250.00 FL *- FL
13 1 *FRONT RIM Repair 320.00 FL *- FL
14 1 *EXHAUST PIPE Repair 550.00 FL *- FL
15 1 *FRONT FOOTREST RH Cut/Torn 85.00 FL *85.00 FL
16 1 *FOOTREST BRACKET Not Necessary 190.00 FL *- FL
17 1 *BRAKE RESERVOIR Serviceable 150.00 FL *- FL
18 2 *MIRROR Not fitted 160.00 FL *- FL
19 1 *METER ASSY Broken 540.00 FS *540.00 FS
F=Franchise part. S=SpcNett. L=ListItemDisc.
Sub Total (S$)4,648.00 2,409.00
- List Item Discount on L Items 10.00/10.00% (S$) 410.80186.90
 
Total Parts (S$) 4,237.20 2,222.10
 
 
Recommended Miscellaneous Items
There are no new miscellaneous items selected.

Recommended Labour
Report was unsubmitted during this print-out.
NoParticulars Lab.Type Repairer's Amount

Labour Items
1 TOWING FEE New 40.00 0.00
2 REMOVE & REPLACE PARTS,ALIGN & ETC New 250.00 150.00
3 REMOVE & REPLACE FORK TUBE,TOP UP FORK OIL New 150.00 80.00
4 REMOVE & REPLACE FRONT DISC,FRONT RIM & EXHAUST PIPE New 120.00 30.00
5 RE-CONNECT ELECTRICAL WIRING New 60.00 30.00
 
Gross Labour Cost (S$) 620.00290.00
 

< END OF ESTIMATES >