Printing Options
 Hide Company Header - Leave lines blank
 Print continuously - Do not break pages
Adjuster Report
LKK Auto Consultants Pte Ltd (Co.Reg.No:199607198R)
51 Ubi Ave 1 #01-25, Paya Ubi Industrial Park
Singapore 408933
Tel: 6256-3561  Fax: 6844-8805   Email: sur@lkkauto.com;assignments@lkkauto.com

VEHICLE DAMAGE INSPECTION REPORT

AIG Asia Pacific Insurance Pte. Ltd.
AIG Building, 78 Shenton Way, #09-16
Singapore 079120
Our File No:CC3/AIG21000770/AQD3N2
Date:27/05/2021

REFERENCE
Insured/Claimant:FAHAD KHOWAJA Policy No:2070178446
Date of Loss:11/01/2021 Nature of Claim:OD Claim No: 6566639976SG

DESCRIPTION & IDENTIFICATION OF VEHICLE
Reg No:SMX1511E
Make & Model:AUDI A4, 2.0 TFSI QU S-TRONIC (A) Engine No:DEM027422
Reg. Date:29/12/2020 (Man. Year: 2020) Chassis No: WAUZZZF44MN004571
Colour:Grey Odometer:912 km
Engine Capacity:1984 cc
Market Value/New Car Price:S$163,000.00
Sum Insured (S$):Market Value/New Car Price

CONDITION OF VEHICLE AT THE TIME OF SURVEY
General Condition: Steering (Serviceable):Yes Footbrake (Serviceable):Yes
Handbrake (Serviceable):Yes Engine Modification:No Pre-accident Condition:

CONDITION OF TYRES
Front Tyre Size:225/50R17 Rear Tyre Size:225/50R17
Front Left Side: Hankook  6 mm Rear Left Side: Hankook  6 mm
Front Right Side:Hankook  6 mm Rear Right Side:Hankook  6 mm
The above values represent the remaining tyre treads depth

COST OF CLAIMS Repairer's Adjuster's DifferenceDiff %
Parts 6,431.00 2,357.68 4,073.32 63.34
Miscellaneous Items 0.00 0.00 0.00  
Labour 2,502.00 1,602.00 900.00 35.97
Paintwork Labour 0.00 0.00 0.00  
Towing 0.00 0.00 0.00  
  
Calculated Gross Total (S$) 8,933.00 3,959.68 4,973.32 55.67
- Excess (S$) 100.00 100.00 0.00 0.00
  
(S$) 8,833.00 3,859.68 4,973.32 56.30
+ GST 7.00/7.00% (S$) 618.31 270.18 348.13 56.30
  
Nett Amount (S$) 9,451.31 4,129.86 5,321.45 56.30
  

INSPECTION
Date of Assignment:15/01/2021
Date Inspected:15/01/2021 Inspected At:Premium Automobiles Pte Ltd (UBI)
55 Ubi Road 1
Singapore 408699
Estimated Period of Repair:3.0 days



Adjuster: ADRIAN LING   Manager: SHIAU CHAN
 
NOTE: This report represents our findings at the time and place of inspection stated herein. Such inspection has been carried out to the best of our knowledge and ability but any other liability under any other circumstances is hereby expressly excluded.

 
REPAIR DETAILS


Recommended Parts
Report was unsubmitted during this print-out.
No.Qty Part No. Particulars Condition Repairer's Amount

1 1 *REAR BUMPER Deformed 2,342.00 FS *1,873.60 FS
2 1 *REAR BUMPER FIXING PARTS Not Necessary 166.00 FS *- FS
3 1 *REAR BUMPER SECURING STRIP-UPPER Necessary 112.00 FS *89.60 FS
4 1 *REAR BUMPER SECURING STRIP-LOWER Necessary 223.00 FS *178.00 FS
5 1 *REAR BUMPER SPOILER Scratched 249.00 FS *198.80 FS
6 2 *REAR BUMPER BRACKET-LH/RH Not Necessary 408.00 FS *- FS
7 2 *REAR LIGHT REFLECTOR-LH/RH OUTER Not Necessary 86.00 FS *- FS
8 2 *REAR LIGHT REFLECTOR-LH/RH INNER Not Necessary 86.00 FS *- FS
9 1 *REAR BUMPER CARRIER Not Necessary 1,063.00 FS *- FS
10 2 *REAR BUMPER CARRIER SEAL Not Necessary 28.00 FS *- FS
11 1 *REAR BUMPER GUIDE SECTION-LH/RH N/s Cracked 46.00 FS *17.68 FS
12 2 *REAR BUMPER HOLDING STRAP-LH/RH Not Necessary 166.00 FS *- FS
13 2 *REAR PARKING AID SENSOR-INNER/OUTER Not Necessary 484.00 FS *- FS
14 4 *REAR PARKING AID SEAL RING Not Necessary 14.00 FS *- FS
15 2 *EXHAUST TAIL PIPE TRIM-LH/RH Not Necessary 708.00 FS *- FS
16 1 *SUNDRIES Not Necessary 250.00 FS *- FS
F=Franchise part. S=SpcNett.
Total Parts (S$) 6,431.00 2,357.68
 
 
Recommended Miscellaneous Items
There are no new miscellaneous items selected.

Recommended Labour
Report was unsubmitted during this print-out.
NoParticulars Lab.Type Repairer's Amount

Labour Items
1 TO REMOVE AND RENEW REAR PARKING AID AND REAR LID KICK SENSOR.CHECK FUNCTION AND RENEW ACCORDING TO DAMAGE New 360.00 360.00
2 TO DISMANTLE AND RENEW REAR BUMPER.RE-ORGANISE CRASH MANAGEMENT COMPONENTS.REINSTALL ALL PARTS REMOVED New 1,050.00 500.00
3 TO RESPRAY REAR BUMPER New 900.00 550.00
4 TO CARRY OUT DIAGNOSTIC CHECK New 192.00 192.00
 
Gross Labour Cost (S$) 2,502.001,602.00
 

< END OF ESTIMATES >