Printing Options
 Hide Company Header - Leave lines blank
 Print continuously - Do not break pages
Adjuster Report
LKK Auto Consultants Pte Ltd (Co.Reg.No:199607198R)
51 Ubi Ave 1 #01-25, Paya Ubi Industrial Park
Singapore 408933
Tel: 6256-3561  Fax: 6844-8805   Email: sur@lkkauto.com;assignments@lkkauto.com

VEHICLE DAMAGE INSPECTION REPORT

AIG Asia Pacific Insurance Pte. Ltd.
AIG Building, 78 Shenton Way, #09-16
Singapore 079120
Our File No:CC3/AIG21000768/AVD3N2
Date:31/05/2021

REFERENCE
Insured/Claimant:LIM EK CHOW(LIN YICHAO) Policy No:1800024297-02
Date of Loss:13/01/2021 Nature of Claim:OD Claim No: 6301163116SG

DESCRIPTION & IDENTIFICATION OF VEHICLE
Reg No:SKM2899L
Make & Model:AUDI Q2, 999cc 1.0 TFSI S TRONIC (A) Engine No:CHZ553766
Reg. Date:13/03/2018 (Man. Year: 2017) Chassis No: WAUZZZGA9JA030672
Colour:Black Odometer:33008 km
Engine Capacity:999 cc
Market Value/New Car Price:S$92,000.00
Sum Insured (S$):Market Value/New Car Price

CONDITION OF VEHICLE AT THE TIME OF SURVEY
General Condition: Steering (Serviceable):Yes Footbrake (Serviceable):Yes
Handbrake (Serviceable):Yes Engine Modification:No Pre-accident Condition:

CONDITION OF TYRES
Front Tyre Size:215/60R16 Rear Tyre Size:215/60R16
Front Left Side: Michelin  6 mm Rear Left Side: Michelin  6 mm
Front Right Side:Michelin  6 mm Rear Right Side:Michelin  6 mm
The above values represent the remaining tyre treads depth

COST OF CLAIMS Repairer's Adjuster's DifferenceDiff %
Parts 8,337.00 3,598.40 4,738.60 56.84
Miscellaneous Items 0.00 0.00 0.00  
Labour 7,672.00 2,962.00 4,710.00 61.39
Paintwork Labour 0.00 0.00 0.00  
Towing 0.00 0.00 0.00  
  
Calculated Gross Total (S$) 16,009.00 6,560.40 9,448.60 59.02
- Excess (S$) 800.00 800.00 0.00 0.00
  
(S$) 15,209.00 5,760.40 9,448.60 62.13
+ GST 7.00/7.00% (S$) 1,064.63 403.23 661.40 62.12
  
Nett Amount (S$) 16,273.63 6,163.63 10,110.00 62.13
  

INSPECTION
Date of Assignment:15/01/2021
Date Inspected:15/01/2021 Inspected At:Premium Automobiles Pte Ltd (UBI)
55 Ubi Road 1
Singapore 408699
Estimated Period of Repair:5.0 days



Adjuster: ADRIAN LING   Manager: VERON CHEN
 
NOTE: This report represents our findings at the time and place of inspection stated herein. Such inspection has been carried out to the best of our knowledge and ability but any other liability under any other circumstances is hereby expressly excluded.

 
REPAIR DETAILS


Recommended Parts
Report was unsubmitted during this print-out.
No.Qty Part No. Particulars Condition Repairer's Amount

1 1 *FRONT DOOR-LH Repair 2,756.00 FS *- FS
2 1 *FRONT DOOR ATTACHMENT PARTS Not Necessary 94.00 FS *- FS
3 1 *FRONT DOOR CATCH Not Necessary 120.00 FS *- FS
4 1 *FRONT DOOR COVER-LH Cut 257.00 FS *205.20 FS
5 1 *REAR DOOR-LH Dented 2,756.00 FS *2,204.80 FS
6 1 *REAR DOOR OUTER SEAL-LH Necessary 135.00 FS *108.00 FS
7 1 *BONDING AGENT Not Necessary 49.00 FS *- FS
8 1 *CLEANING SOLUTION Not Necessary 68.00 FS *- FS
9 1 *REAR DOOR ATTACHMENT PARTS Not Necessary 94.00 FS *- FS
10 1 *REAR DOOR CATCH Not Necessary 120.00 FS *- FS
11 1 *REAR DOOR HINGE HALF-UPPER PART-LH UPPER Not Necessary 44.00 FS *- FS
12 1 *REAR DOOR HINGE HALF-LOWER PART-LH UPPER Not Necessary 48.00 FS *- FS
13 1 *REAR DOOR HINGE HALF-UPPER PART-LH LOWER Not Necessary 47.00 FS *- FS
14 1 *REAR DOOR HINGE HALF-LOWER PART-LH LOWER Not Necessary 44.00 FS *- FS
15 1 *REAR DOOR SEAL OUTER Not Necessary 60.00 FS *- FS
16 1 *REAR DOOR COVER-LH Cut 226.00 FS *180.40 FS
17 1 *REAR WHEEL COVER-LH Cut 170.00 FS *136.00 FS
18 1 *REAR ALUMINIUM RIM-LH Cut 949.00 FS *758.80 FS
19 1 *SUNDRIES Necessary 300.00 FS *5.20 FS
F=Franchise part. S=SpcNett.
Total Parts (S$) 8,337.00 3,598.40
 
 
Recommended Miscellaneous Items
There are no new miscellaneous items selected.

Recommended Labour
Report was unsubmitted during this print-out.
NoParticulars Lab.Type Repairer's Amount

Labour Items
1 TO REMOVE AND TRANSFER LHS FRONT AND REAR DOORS MULTI-LOCK SYSTEM AND POWER WINDOW DEVICES.INSPECT FOR DAMAGES New 800.00 640.00
2 TO DISMANTLE AND RENEW LHS FRONT AND REAR DOOR.TO REPAIR LHS REAR FENDER.TO INSPECT LHS B-PILLAR.RE-ORGANISE CRASH MANAGEMENT COMPONENTS.REINSTALL ALL PARTS REMOVED New 2,800.00 750.00
3 TO RESPRAY LHS FRONT DOOR.LHS REAR DOOR,LHS REAR FENDER AND HINGES New 3,600.00 1,100.00
4 TO RENEW LHS REAR RIM AND CARRY OUT WHEEL ALIGNMENT New 280.00 280.00
5 TO CARRY OUT DIAGNOSTIC CHECK New 192.00 192.00
 
Gross Labour Cost (S$) 7,672.002,962.00
 

< END OF ESTIMATES >