Printing Options
 Hide Company Header - Leave lines blank
 Print continuously - Do not break pages
Adjuster Report
LKK Auto Consultants Pte Ltd (Co.Reg.No:199607198R)
51 Ubi Ave 1 #01-25, Paya Ubi Industrial Park
Singapore 408933
Tel: 6256-3561  Fax: 6844-8805   Email: sur@lkkauto.com;assignments@lkkauto.com

VEHICLE DAMAGE INSPECTION REPORT

AIG Asia Pacific Insurance Pte. Ltd.
AIG Building, 78 Shenton Way #07-16
Singapore 079120
Our File No:CC3/AIG21000438/R1VD3N2
Date:12/08/2021

REFERENCE
Insured/Claimant:ZHANG HANPING Policy No:1900171580
Date of Loss:10/01/2021 Nature of Claim:OD Claim No: 9624784004SG

DESCRIPTION & IDENTIFICATION OF VEHICLE
Reg No:SMP5719P
Make & Model:AUDI A5, 2.0 SPORTBACK (A) Engine No:CVK085951
Reg. Date:30/09/2019 (Man. Year: 2019) Chassis No: WAUZZZF51KA067110
Colour:White Odometer:11581 km
Engine Capacity:1984 cc
Market Value/New Car Price:S$153,000.00
Sum Insured (S$):Market Value/New Car Price

CONDITION OF VEHICLE AT THE TIME OF SURVEY
General Condition: Steering (Serviceable):Yes Footbrake (Serviceable):Yes
Handbrake (Serviceable):Yes Engine Modification:No Pre-accident Condition:

CONDITION OF TYRES
Front Tyre Size:245/40R18 Rear Tyre Size:245/40R18
Front Left Side: Hankook  6 mm Rear Left Side: Hankook  6 mm
Front Right Side:Hankook  6 mm Rear Right Side:Hankook  6 mm
The above values represent the remaining tyre treads depth

COST OF CLAIMS Repairer's Adjuster's DifferenceDiff %
Parts 12,980.00 6,227.92 6,752.08 52.02
Miscellaneous Items 0.00 0.00 0.00  
Labour 18,432.00 9,747.00 8,685.00 47.12
Paintwork Labour 0.00 0.00 0.00  
Towing 0.00 0.00 0.00  
  
Calculated Gross Total (S$) 31,412.00 15,974.92 15,437.08 49.14
- Excess (S$) 1,600.00 1,600.00 0.00 0.00
  
(S$) 29,812.00 14,374.92 15,437.08 51.78
+ GST 7.00/7.00% (S$) 2,086.84 1,006.24 1,080.60 51.78
  
Nett Amount (S$) 31,898.84 15,381.16 16,517.68 51.78
  

INSPECTION
Date of Assignment:11/01/2021
Date Inspected:11/01/2021 Inspected At:24 BENOI SECTOR
SINGAPORE 629857
REPAIRER: PREMIUM AUTOMOBILES PTE LTD
Estimated Period of Repair:13.0 days



Adjuster: MOHD RASUL   Manager: VERON CHEN
 
NOTE: This report represents our findings at the time and place of inspection stated herein. Such inspection has been carried out to the best of our knowledge and ability but any other liability under any other circumstances is hereby expressly excluded.

 
REPAIR DETAILS


Recommended Parts
Report was unsubmitted during this print-out.
No.Qty Part No. Particulars Condition Repairer's Amount

1 1 *REAR FENDER-RH Bent 3,791.00 FS *3,032.80 FS
2 1 *1/4 GLASS-RH Necessary 717.00 FS *573.20 FS
3 1 *PRIMER Necessary 20.00 FS *15.76 FS
4 1 *REAR DOOR-RH Repair 3,884.00 FS *- FS
5 1 *REAR DOOR OUTER SEAL-RH Serviceable 222.00 FS *- FS
6 1 *BONDING AGENT Not Necessary 49.00 FS *- FS
7 1 *CLEANING SOLUTION Not Necessary 68.00 FS *- FS
8 1 *REAR DOOR CATCH Serviceable 120.00 FS *- FS
9 1 *REAR DOOR ATTACHMENT PARTS Not Necessary 129.00 FS *- FS
10 1 *DOOR HANDLE TRIM PLATE-RH Scratched 88.00 FS *69.92 FS
11 1 *DOOR TRIM-RH Serviceable 136.00 FS *- FS
12 1 *SILL PANEL ATTACHMENT PARTS Necessary 130.00 FS *104.00 FS
13 1 *SILL PANEL ADHESIVE TAPES Necessary 212.00 FS *169.60 FS
14 1 *REAR ALUMINIUM RIM-RH Scratched 1,690.00 FS *1,352.00 FS
15 1 *WHEEL HOUSING LINER-RH Serviceable 275.00 FS *- FS
16 1 *WHEEL HOUSING LINER ATTACHMENT PARTS Not Necessary 169.00 FS *- FS
17 1 *1/4 GLASS SEALANT Necessary 100.00 FS *100.00 FS
18 1 *METAL FILLER POWDER Necessary 280.00 FS *280.00 FS
19 1 *STONE CHIP Necessary 180.00 FS *180.00 FS
20 1 *CAVITY WAX Necessary 140.00 FS *140.00 FS
21 1 *ACRYLIC SEALANT Necessary 180.00 FS *180.00 FS
22 1 *SUNDRIES Necessary 400.00 FS *30.64 FS
F=Franchise part. S=SpcNett.
Total Parts (S$) 12,980.00 6,227.92
 
 
Recommended Miscellaneous Items
There are no new miscellaneous items selected.

Recommended Labour
Report was unsubmitted during this print-out.
NoParticulars Lab.Type Repairer's Amount

Labour Items
1 TO REMOVE AND REINSTALL REAR PARKING AID AND REAR LID KICK SENSOR.CHECK FUNCTION AND RENEW ACCORDING TO DAMAGE New 360.00 0.00
2 TO RENEW 1/4 GLASS TO FACILITATE FENDER RENEWAL New 300.00 300.00
3 TO INSTALL SOLAR FILM FOR 1/4 GLASS New 400.00 400.00
4 TO CARRY OUT WATER SEEPAGE TEST FOR 1/4 GLASS New 200.00 200.00
5 TO DISLODGE AND REINSTALL REAR WIRE HARNESS FOR LIGHTS,BATTERY MANAGER AND FUSE RELAY TRAYS,ELECTRICAL AND AUDIO EQUIPMENT New 1,400.00 1,400.00
6 TO REMOVE AND REINSTALL REAR SEAT,BACK REST,HAT TRAY,ABCD PILLAR TRIMS,LUGGAGE COMPARTMENT TRIMS.DISLODGE ROOF LINER AND DISENGAGE CURTAIN AIRBAG ETC New 1,400.00 1,400.00
7 TO REMOVE AND TRANSFER RHS REAR DOORS MULTI-LOCK SYSTEM AND POWER WINDOW DEVICES.INSPECT OF DAMAGES New 400.00 0.00
8 TO DISMANTLE REAR BUMPER,RHS REAR DOOR AND RHS SILL PANEL TRIM.CUT OUT AND WELD RHS REAR FENDER.TO RENEW RHS REAR DOOR.RE-ORGANISE CRASH MANAGEMENT COMPONENTS.REINSTALL ALL PARTS REMOVED New 7,200.00 3,000.00
9 TO RESPRAY RHS REAR FENDER,RHS REAR DOOR,RHS SILL PANEL TRIM.DOOR HANDLE,RHS SILL PANEL,DOOR ENTRANCES,ROOF CHANNEL,DRIN PANEL AND END PANELLING.TO CARRY OUT STONE CHIP TREATMENT AND JOINT SEALER WORKS New 6,300.00 2,575.00
10 TO RENEW RHS REAR RIM.TO CARRY OUT PRE AND POST WHEEL ALIGNMENT New 280.00 280.00
11 TO CARRY OUT DIAGNOSTIC CHECK New 192.00 192.00
 
Gross Labour Cost (S$) 18,432.009,747.00
 

< END OF ESTIMATES >