Adjuster Report
VEHICLE DAMAGE INSPECTION REPORT
|
AIG Asia Pacific Insurance Pte. Ltd. AIG Building, 78 Shenton Way, #09-16 Singapore 079120 |
Our File No: | CC3/AIG20012677/T1VF3N2 |
| Date: | 08/06/2021 |
REFERENCE |
| Insured/Claimant: | NICCOL SOO CHENG GHEE |
Policy No: | |
| Date of Loss: | 15/11/2020 |
Nature of Claim: | OD |
Claim No: |
0487026698SG
|
| DESCRIPTION & IDENTIFICATION OF VEHICLE |
| Reg No: | SJL3999S |
| Make & Model: | AUDI A1 SPORTBACK, 1.4 TSTI S (A) |
Engine No: | CZE814605 |
| Reg. Date: | 29/08/2018 (Man. Year: 2018) |
Chassis No: |
WAUZZZ8V2JA136060 |
| Colour: | Red |
Odometer: | 20046 km |
| Engine Capacity: | 1395 cc |
| Market Value/New Car Price: | S$95,000.00 |
| Sum Insured (S$): | Market Value/New Car Price |
| CONDITION OF VEHICLE AT THE TIME OF SURVEY |
| General Condition: | |
Steering (Serviceable): | Yes | Footbrake (Serviceable): | Yes |
| Handbrake (Serviceable): | Yes |
Engine Modification: | No |
Pre-accident Condition: | |
| CONDITION OF TYRES |
| Front Tyre Size: | 205/55R16 |
Rear Tyre Size: | 205/55R16 |
|
Front Left Side:
| Bridgestone 6 mm | |
Rear Left Side:
| Bridgestone 6 mm | |
| Front Right Side: | Bridgestone 6 mm | |
Rear Right Side: | Bridgestone 6 mm | |
| The above values represent the remaining tyre treads depth |
| Parts |
3,757.00 |
1,477.60
|
2,279.40 |
60.67 |
| Miscellaneous Items |
0.00 |
0.00 |
0.00 |
|
| Labour |
2,422.00 |
1,522.00 |
900.00 |
37.16 |
| Paintwork Labour |
0.00 |
0.00 |
0.00 |
|
| Towing |
0.00 |
0.00 |
0.00 |
|
| | |
|
Calculated Gross Total
(S$)
|
6,179.00 |
2,999.60 |
3,179.40 |
51.45 |
| - Excess (S$) |
2,000.00 |
2,000.00 |
0.00 |
0.00 |
| | |
| (S$) |
4,179.00 |
999.60 |
3,179.40 |
76.08 |
| +
GST 7.00/7.00% (S$)
|
292.53 |
69.97 |
222.56 |
76.08 |
| | |
| Nett Amount (S$) |
4,471.53 |
1,069.57 |
3,401.96 |
76.08 |
| | |
| INSPECTION |
| Date of Assignment: | 18/11/2020 |
| Date Inspected: | 17/11/2020 |
Inspected At: | 24 BENOI SECTOR SINGAPORE 629857 REPAIRER: PREMIUM AUTOMOBILES PTE LTD |
| Estimated Period of Repair: | 3.0 days |
| Adjuster: |
MOHD TAUFIKH BIN HAMID |
|
Manager:
|
VERON CHEN
|
|
|
|
|
|
|
NOTE: This report represents our findings at the time and place of inspection stated herein. Such inspection has been carried out to the best of our knowledge and ability but any other liability under any other circumstances is hereby expressly excluded.
|
Recommended Parts
| Report was unsubmitted during this print-out. |
| No. | Qty |
Part No. |
Particulars |
Condition | Repairer's | |
Amount |
|
| 1 |
1 |
|
*REAR BUMPER |
Deformed |
1,847.00 |
FS |
*1,477.60 |
FS |
| 2 |
2 |
|
*REAR BUMPER STICKY PAD |
Not Necessary |
12.00 |
FS |
*- |
FS |
| 3 |
1 |
|
*REAR BUMPER FIXING PARTS |
Not Necessary |
191.00 |
FS |
*- |
FS |
| 4 |
2 |
|
*REAR BUMPER GUIDE LOCKING MECHANISM |
Not Necessary |
28.00 |
FS |
*- |
FS |
| 5 |
1 |
|
*REAR BUMPER SPOILER |
Not Necessary |
234.00 |
FS |
*- |
FS |
| 6 |
2 |
|
*REAR BUMPER LIGHTT REFLECTOR-LH/RH |
Not Necessary |
60.00 |
FS |
*- |
FS |
| 7 |
1 |
|
*REAR REINFORCEMENT BEAM |
Not Necessary |
565.00 |
FS |
*- |
FS |
| 8 |
2 |
|
*REAR BUMPER LOWER BRACKET-LH/RH |
Not Necessary |
56.00 |
FS |
*- |
FS |
| 9 |
2 |
|
*REAR PARKING AID SENSOR |
Not Necessary |
550.00 |
FS |
*- |
FS |
| 10 |
4 |
|
*REAR PARKING SENSOR O-RING |
Not Necessary |
14.00 |
FS |
*- |
FS |
| 11 |
1 |
|
*SUNDRIES |
Not Necessary |
200.00 |
FS |
*- |
FS |
| F=Franchise part. S=SpcNett. |
|
| Total Parts (S$) |
3,757.00 | | 1,477.60 | |
| |
|
Recommended Miscellaneous Items
There are no new miscellaneous items selected. |
Recommended Labour
| Report was unsubmitted during this print-out. |
| No | Particulars |
Lab.Type | Repairer's | Amount |
|
| Labour Items |
| 1 |
TO REMOVE AND TRANSFER REAR PARKING AID.CHECK FUNCTION AND RENEW ACCORDING TO DAMAGE |
New |
280.00 | 280.00 |
| 2 |
TO DISMANTLE AND RENEW REAR BUMPER.RE-ORGANISE CRASH MANAGEMENT COMPONENTS.REINSTALL ALL PARTS REMOVED |
New |
1,050.00 | 500.00 |
| 3 |
TO RESPRAY REAR BUMPER |
New |
900.00 | 550.00 |
| 4 |
TO CARRY OUT DIAGNOSTIC CHECK |
New |
192.00 | 192.00 |
| |
|
| Gross Labour Cost (S$) |
2,422.00 | 1,522.00 |
| |
|
< END OF ESTIMATES >