Printing Options
 Hide Company Header - Leave lines blank
 Print continuously - Do not break pages
Adjuster Report
LKK Auto Consultants Pte Ltd (Co.Reg.No:199607198R)
51 Ubi Ave 1 #01-25, Paya Ubi Industrial Park
Singapore 408933
Tel: 6256-3561  Fax: 6844-8805   Email: sur@lkkauto.com;assignments@lkkauto.com

VEHICLE DAMAGE INSPECTION REPORT

  Our File No:CS/CTI20011792/USD3N2
Date:23/11/2020

REFERENCE
Handling Insurer:China Taiping Insurance (Singapore) Pte. Ltd. Policy No:DMCVSNA00090332000
Claimant Vehicle No : SKC4135YInsured Vehicle No : YQ2495G
Date of Loss:25/10/2020 Nature of Claim:TP Claim No: SNM20D204090/C02/LEWLC

DESCRIPTION & IDENTIFICATION OF VEHICLE
Reg No:SKC4135Y
Make & Model:HONDA ACCORD, 2.0 (A) Engine No:K20A5824204
Reg. Date:06/04/2006 (Man. Year: 2006) Chassis No: CL71200454
Colour:Blue Odometer:83871 km
Engine Capacity:1998 cc
Market Value/New Car Price:N/A
Sum Insured (S$):Market Value/New Car Price

CONDITION OF VEHICLE AT THE TIME OF SURVEY
General Condition: Steering (Serviceable):Yes Footbrake (Serviceable):Yes
Handbrake (Serviceable):Yes Engine Modification:No Pre-accident Condition:

CONDITION OF TYRES
Front Tyre Size:215/45ZR17 Rear Tyre Size:215/45ZR17
Front Left Side: Toyo  6 mm Rear Left Side: Toyo  6 mm
Front Right Side:Toyo  6 mm Rear Right Side:Toyo  6 mm
The above values represent the remaining tyre treads depth

COST OF CLAIMS Repairer's Adjuster's DifferenceDiff %
Parts 3,237.12 2,115.20 1,121.92 34.66
Miscellaneous Items 0.00 0.00 0.00  
Labour 1,770.00 1,030.00 740.00 41.81
Paintwork Labour 0.00 0.00 0.00  
Towing 0.00 0.00 0.00  
  
Calculated Gross Total (S$) 5,007.12 3,145.20 1,861.92 37.19
Approved Total (Overridden) (S$) 2,500.00
  
(S$) 5,007.12 2,500.00 2,507.12 50.07
+ GST 7.00/7.00% (S$) 350.50 175.00 175.50 50.07
  
Nett Amount (S$) 5,357.62 2,675.00 2,682.62 50.07
  

INSPECTION
Date of Assignment:29/10/2020
Date Inspected:30/10/2020 Inspected At:Focus Auto Pte Ltd (HQ)
1 Kaki Bukit Ave 6, #02-48/50 Autobay
Singapore 417883
Estimated Period of Repair:4.0 days



Adjuster: MARCUS CHUA   Manager: Hiew May Fung
 
NOTE: This report represents our findings at the time and place of inspection stated herein. Such inspection has been carried out to the best of our knowledge and ability but any other liability under any other circumstances is hereby expressly excluded.

 
REPAIR DETAILS
Reference
Part Source:MRM-SGVersion: 1.0 (Last Synchronised: 23 Nov 2020)
Parts:143HONDA ACCORD 2.0 (A) (Catalogue:Merimen Singapore 1.0)
Labour:Repairer's(Price-denominated Standard List) 
Print Code:(Unsubmitted, no print-code for SKC4135Y)
Validity:These estimates are valid only if they contain the print code (above) on all estimate pages, running page numbers with the END OF ESTIMATES marker on the last estimate page
Further Info:Items/values not in reference catalogue are prefixed with an asterisk *.


Recommended Parts
Report was unsubmitted during this print-out.
No.Qty Part No. Particulars Condition Repairer's Amount

1 1 *REAR BOOTLID Badly Dented 750.90 FL *750.90 FL
2 1 *REAR BOOT LOCK Not Necessary 189.50 FL *- FL
3 1 *REAR BOOT RUBBER Not Necessary 145.20 FL *- FL
4 1 *REAR BOOT EMBLEM Necessary 34.90 FL *34.90 FL
5 1 *REAR BOOT CENTRE LOGO Necessary 36.20 FL *36.20 FL
6 1 *REAR END PANEL Repair 550.60 FL *- FL
7 1 *REAR END PANEL TOP GARNISH Not Necessary 89.60 FL *- FL
8 1 *REAR BUMPER Deformed/Torn 950.00 FL *950.00 FL
9 1 *SET REAR BUMPER LOWER CLIPS Necessary 22.00 FL *22.00 FL
10 1 *REAR BOOT REFLECTOR-LH Not Necessary 215.00 FL *- FL
11 1 *REAR BUMPER SPOILER Deformed/Torn 850.00 FS *680.00 FS
F=Franchise part. S=SpcNett. L=ListItemDisc.
Sub Total (S$)3,833.90 2,474.00
- List Item Discount on L Items 20.00/20.00% (S$) 596.78358.80
 
Total Parts (S$) 3,237.12 2,115.20
 
 
Recommended Miscellaneous Items
There are no new miscellaneous items selected.

Recommended Labour
Report was unsubmitted during this print-out.
NoParticulars Lab.Type Repairer's Amount

Labour Items
1 PANEL BEATING New 850.00 300.00
2 CHECK WIRING New 60.00 20.00
3 RUBBER PROOFING New 60.00 30.00
4 SPRAY PAINTING New 800.00 680.00
 
Gross Labour Cost (S$) 1,770.001,030.00
 

< END OF ESTIMATES >