Adjuster Report
VEHICLE DAMAGE INSPECTION REPORT
|
| |
Our File No: | CS/EGI20010417/GQF3Q2 |
| Date: | 21/10/2020 |
REFERENCE |
| Handling Insurer: | ERGO Insurance Pte. Ltd. |
Policy No: | |
| Claimant Vehicle No : | SHD296Y | Insured Vehicle No : | SLZ1555E |
| Date of Loss: | 26/09/2020 |
Nature of Claim: | TP |
Claim No: |
CDMPG20001368
|
| DESCRIPTION & IDENTIFICATION OF VEHICLE |
| Reg No: | SHD296Y |
| Make & Model: | RENAULT LATITUDE, 2.0 L (A) |
Engine No: | M9R8839C002867 |
| Reg. Date: | 04/03/2016 (Man. Year: 2015) |
Chassis No: |
VF1ABL15AUC282305 |
| Colour: | Red |
Odometer: | 464010 km |
| Engine Capacity: | 1995 cc |
| Market Value/New Car Price: | N/A |
| Sum Insured (S$): | Market Value/New Car Price |
| CONDITION OF VEHICLE AT THE TIME OF SURVEY |
| General Condition: | |
Steering (Serviceable): | Yes | Footbrake (Serviceable): | Yes |
| Handbrake (Serviceable): | Yes |
Engine Modification: | No |
Pre-accident Condition: | |
| CONDITION OF TYRES |
| Front Tyre Size: | 215/60 R16 |
Rear Tyre Size: | 215/60 R16 |
|
Front Left Side:
| Giti 5 mm | |
Rear Left Side:
| Giti 5 mm | |
| Front Right Side: | Giti 5 mm | |
Rear Right Side: | Giti 5 mm | |
| The above values represent the remaining tyre treads depth |
| Parts |
5,501.67 |
1,410.06
|
4,091.61 |
74.37 |
| Miscellaneous Items |
0.00 |
0.00 |
0.00 |
|
| Labour |
2,390.00 |
600.00 |
1,790.00 |
74.90 |
| Paintwork Labour |
0.00 |
0.00 |
0.00 |
|
| Towing |
0.00 |
0.00 |
0.00 |
|
| | |
| Calculated Gross Total (S$) |
7,891.67 |
2,010.06 |
5,881.61 |
74.53 |
| Approved Total (Overridden) (S$) |
|
1,600.00 |
| | |
| (S$) |
7,891.67 |
1,600.00 |
6,291.67 |
79.73 |
| +
GST 7.00/7.00% (S$)
|
552.42 |
112.00 |
440.42 |
79.73 |
| | |
| Nett Amount (S$) |
8,444.09 |
1,712.00 |
6,732.09 |
79.73 |
| | |
| INSPECTION |
| Date of Assignment: | 29/09/2020 |
| Date Inspected: | 29/09/2020 |
Inspected At: | Trans-Cab Services Pte Ltd (HQ) 2 Ang Mo Kio Street 63 Singapore 569111 |
| Estimated Period of Repair: | 3.0 days |
| Adjuster: |
XING GUO QIANG |
|
Manager:
|
SHIAU CHAN
|
|
|
|
|
|
|
NOTE: This report represents our findings at the time and place of inspection stated herein. Such inspection has been carried out to the best of our knowledge and ability but any other liability under any other circumstances is hereby expressly excluded.
|
Reference |
| Part Source: | MRM-SG | Version: 1.0 (Last Synchronised: 21 Oct 2020) |
| Parts: | 143 | RENAULT LATITUDE 2.0 L (A) (Catalogue:Merimen Singapore 1.0) |
| Labour: | Repairer's | (Price-denominated Standard List) | |
| Print Code: | (Unsubmitted, no print-code for SHD296Y) |
| Validity: | These estimates are valid only if they contain the print code (above) on all estimate pages, running page numbers with the END OF ESTIMATES marker on the last estimate page |
| Further Info: | Items/values not in reference catalogue are prefixed with an asterisk *. |
Recommended Parts
| Report was unsubmitted during this print-out. |
| No. | Qty |
Part No. |
Particulars |
Condition | Repairer's | |
Amount |
|
| 1 |
1 |
|
*FENDER PANEL FRT RH |
Repair |
437.10 |
FL |
*- |
FL |
| 2 |
1 |
|
*DOOR PANEL FRT RH |
Repair |
2,844.66 |
FL |
*- |
FL |
| 3 |
1 |
|
*DOOR MIRROR ASSY RH |
Distorted |
1,483.40 |
FL |
*1,483.40 |
FL |
| 4 |
1 |
|
*DOOR MIRROR GLASS RH |
Not Necessary |
242.33 |
FL |
*- |
FL |
| 5 |
1 |
|
*DOOR MIRROR BACK COVER RH |
Not Necessary |
218.46 |
FL |
*- |
FL |
| 6 |
1 |
|
*DOOR MIRROR LAMP RH |
Not Necessary |
194.18 |
FL |
*- |
FL |
| 7 |
1 |
|
*DOOR FINISHER FRT RH |
Not Necessary |
515.06 |
FL |
*- |
FL |
| 8 |
1 |
|
*FRONT DOOR STICKER TRANS-CAB |
Necessary |
80.00 |
FS |
*60.00 |
FS |
| 9 |
1 |
|
*FRONT DOOR STICKER CLASSIC |
Necessary |
80.00 |
FS |
*15.00 |
FS |
| F=Franchise part. S=SpcNett. L=ListItemDisc. |
|
| Sub Total (S$) | 6,095.19 | |
1,558.40
| |
| - List Item Discount on L Items 10.00/10.00% (S$) |
593.52 | | 148.34 | |
| |
|
| Total Parts (S$) |
5,501.67 | | 1,410.06 | |
| |
|
Recommended Miscellaneous Items
There are no new miscellaneous items selected. |
Recommended Labour
| Report was unsubmitted during this print-out. |
| No | Particulars |
Lab.Type | Repairer's | Amount |
|
| Labour Items |
| 1 |
TO RUST-PROOFING AND APPLY UNDERCOAR OF THE AFFECTED AREAS |
New |
220.00 | 0.00 |
| 2 |
PANEL BEATING ,KNOCKING AND STRAIGHTENING THE NECESSARY PORTION,REMOVE AND RENEWAL OF PARTS ,ADJUST AND REALIGN THE SAME |
New |
1,000.00 | 200.00 |
| 3 |
PUTTY AND SPRAY PAINTING OF THE AFFECTED PORTION |
New |
1,000.00 | 400.00 |
| 4 |
TO CHECK ELECTRICAL LIGHTING CONCERNED |
New |
170.00 | 0.00 |
| |
|
| Gross Labour Cost (S$) |
2,390.00 | 600.00 |
| |
|
< END OF ESTIMATES >