Printing Options
 Hide Company Header - Leave lines blank
 Print continuously - Do not break pages
Adjuster Report
LKK Auto Consultants Pte Ltd (Co.Reg.No:199607198R)
51 Ubi Ave 1 #01-25, Paya Ubi Industrial Park
Singapore 408933
Tel: 6256-3561  Fax: 6844-8805   Email: sur@lkkauto.com;assignments@lkkauto.com

VEHICLE DAMAGE INSPECTION REPORT

  Our File No:CS/CTI20010209/AVD3N2
Date:29/04/2021

REFERENCE
Handling Insurer:China Taiping Insurance (Singapore) Pte. Ltd. Policy No:DMCVSNW00044842001
Claimant Vehicle No : SJW9669YInsured Vehicle No : GBJ6432X
Date of Loss:11/09/2020 Nature of Claim:TP Claim No: SNM20D203479/C02/CHUAKK

DESCRIPTION & IDENTIFICATION OF VEHICLE
Reg No:SJW9669Y
Make & Model:TOYOTA HARRIER, 2.0 ELEGANCE CVT (A) Engine No:3ZRB912642
Reg. Date:05/10/2017 (Man. Year: 2016) Chassis No: ZSU600092263
Colour:White Odometer:57935 km
Engine Capacity:1986 cc
Market Value/New Car Price:N/A
Sum Insured (S$):Market Value/New Car Price

CONDITION OF VEHICLE AT THE TIME OF SURVEY
General Condition: Steering (Serviceable):Yes Footbrake (Serviceable):Yes
Handbrake (Serviceable):Yes Engine Modification:No Pre-accident Condition:

CONDITION OF TYRES
Front Tyre Size:235/50R19 Rear Tyre Size:235/50R19
Front Left Side: Bridgestone  6 mm Rear Left Side: Bridgestone  6 mm
Front Right Side:Bridgestone  6 mm Rear Right Side:Bridgestone  6 mm
The above values represent the remaining tyre treads depth

COST OF CLAIMS Repairer's Adjuster's DifferenceDiff %
Parts 3,124.90 1,999.50 1,125.40 36.01
Miscellaneous Items 0.00 0.00 0.00  
Labour 710.00 530.00 180.00 25.35
Paintwork Labour 0.00 0.00 0.00  
Towing 0.00 0.00 0.00  
  
Calculated Gross Total (S$) 3,834.90 2,529.50 1,305.40 34.04
Approved Total (Overridden) (S$) 2,000.00
  
Nett Amount (S$) 3,834.90 2,000.00 1,834.90 47.85
  

INSPECTION
Date of Assignment:23/09/2020
Date Inspected:12/10/2020 Inspected At:Tk Motor Workshop (HQ)
Blk 1 Kaki Bukit Ave 6 #02-56, Autobay @ Kaki Bt
Singapore 417883
Estimated Period of Repair:3.0 days



Adjuster: ADRIAN LING   Manager: VERON CHEN
 
NOTE: This report represents our findings at the time and place of inspection stated herein. Such inspection has been carried out to the best of our knowledge and ability but any other liability under any other circumstances is hereby expressly excluded.

 
REPAIR DETAILS
Reference
Part Source:MRM-SGVersion: 1.0 (Last Synchronised: 29 Apr 2021)
Parts:M1-SUVTOYOTA HARRIER 2.0 ELEGANCE CVT (A) (Catalogue:Merimen Singapore 1.0)
Labour:Repairer's(Price-denominated Standard List) 
Print Code:(Unsubmitted, no print-code for SJW9669Y)
Validity:These estimates are valid only if they contain the print code (above) on all estimate pages, running page numbers with the END OF ESTIMATES marker on the last estimate page
Further Info:Items/values not in reference catalogue are prefixed with an asterisk *.


Recommended Parts
Report was unsubmitted during this print-out.
No.Qty Part No. Particulars Condition Repairer's Amount

1 1 *REAR BUMPER Deformed 1,406.40 F *1,406.40 FL
2 1 *REAR BUMPER SIDE LH RETAINER Not Necessary 50.10 F *- FL
3 8 *REAR BUMPER CLIP Necessary 30.40 F *30.40 FL
4 1 *REAR BUMPER LOWER SPOILER Cut 712.60 F *712.60 FL
5 8 *REAR BUMPER LOWER SPOILER CLIP Necessary 36.00 F *36.00 FL
6 1 *REAR LH TAILLAMP Cut 689.40 F *480.60 FL
7 1 *SET REAR BUMPER REVERSE SENSOR Not Necessary 200.00 FS *- FS
F=Franchise part. S=SpcNett. L=ListItemDisc.
Sub Total (S$)3,124.90 2,666.00
- List Item Discount on L Items 0.00/25.00% (S$) 0.00666.50
 
Total Parts (S$) 3,124.90 1,999.50
 
 
Recommended Miscellaneous Items
There are no new miscellaneous items selected.

Recommended Labour
Report was unsubmitted during this print-out.
NoParticulars Lab.Type Repairer's Amount

Labour Items
1 LABOUR CHARGE FOR PANEL BEATING,REMOVING ALL DAMAGE PARTS & REPLACING OF THE NEW PARTS ETC New 280.00 250.00
2 TO CHECK WIRING New 50.00 30.00
3 TO SPRAY PAINTING (PEARL WHITE) New 300.00 200.00
4 TO MEASURE,DRILL THE REPLACED REAR BUMPER,POSITION & REINSTALL REAR REVERSE SENSOR,CONTROL UNIT & TEST FOR FUNCTIONING New 80.00 50.00
 
Gross Labour Cost (S$) 710.00530.00
 

< END OF ESTIMATES >