Printing Options
 Hide Company Header - Leave lines blank
 Print continuously - Do not break pages
Adjuster Report
LKK Auto Consultants Pte Ltd (Co.Reg.No:199607198R)
51 Ubi Ave 1 #01-25, Paya Ubi Industrial Park
Singapore 408933
Tel: 6256-3561  Fax: 6844-8805   Email: sur@lkkauto.com;assignments@lkkauto.com

VEHICLE DAMAGE INSPECTION REPORT

  Our File No:CS/CTI20008717/USF3N2
Date:02/09/2020

REFERENCE
Handling Insurer:China Taiping Insurance (Singapore) Pte. Ltd. Policy No:DMCVSNW00047962000
Claimant Vehicle No : SKP3363TInsured Vehicle No : GBJ6237T
Date of Loss:18/08/2020 Nature of Claim:TP Claim No: SNM20D202933C02

DESCRIPTION & IDENTIFICATION OF VEHICLE
Reg No:SKP3363T
Make & Model:BMW 320I, 2.0 (A) Engine No:B7510574N20B20B
Reg. Date:28/02/2014 (Man. Year: 2013) Chassis No: WBA3B16040NS50426
Colour:Silver Odometer:68452 km
Engine Capacity:1997 cc
Market Value/New Car Price:N/A
Sum Insured (S$):Market Value/New Car Price

CONDITION OF VEHICLE AT THE TIME OF SURVEY
General Condition: Steering (Serviceable):Yes Footbrake (Serviceable):Yes
Handbrake (Serviceable):Yes Engine Modification:No Pre-accident Condition:

CONDITION OF TYRES
Front Tyre Size:205/60R16 Rear Tyre Size:205/60R16
Front Left Side: Pirelli  6 mm Rear Left Side: Pirelli  6 mm
Front Right Side:Pirelli  6 mm Rear Right Side:Pirelli  6 mm
The above values represent the remaining tyre treads depth

COST OF CLAIMS Repairer's Adjuster's DifferenceDiff %
Parts 4,375.35 1,731.87 2,643.48 60.42
Miscellaneous Items 0.00 0.00 0.00  
Labour 1,610.00 780.00 830.00 51.55
Paintwork Labour 0.00 0.00 0.00  
Towing 0.00 0.00 0.00  
  
Calculated Gross Total (S$) 5,985.35 2,511.87 3,473.48 58.03
Approved Total (Overridden) (S$) 2,000.00
  
Nett Amount (S$) 5,985.35 2,000.00 3,985.35 66.59
  

INSPECTION
Date of Assignment:28/08/2020
Date Inspected:24/08/2020 Inspected At:Super Zee Motor Service (HQ)
BLK 14 DEFU LANE 10 #01-402
Singapore 539195
Estimated Period of Repair:3.0 days



Adjuster: MARCUS CHUA   Manager: Hiew May Fung
 
NOTE: This report represents our findings at the time and place of inspection stated herein. Such inspection has been carried out to the best of our knowledge and ability but any other liability under any other circumstances is hereby expressly excluded.

 
REPAIR DETAILS
Reference
Part Source: (Last Synchronised: 02 Sep 2020)
Parts:N/ABMW 320I 2.0 (A) (Model not available in database)
Labour:Repairer's(Price-denominated Standard List) 
Print Code:(Unsubmitted, no print-code for SKP3363T)
Validity:These estimates are valid only if they contain the print code (above) on all estimate pages, running page numbers with the END OF ESTIMATES marker on the last estimate page
Further Info:Items/values not in reference catalogue are prefixed with an asterisk *.


Recommended Parts
Report was unsubmitted during this print-out.
No.Qty Part No. Particulars Condition Repairer's Amount

1 1 *REAR BUMPER Deformed/Cracked 1,305.80 FL *1,305.80 FL
2 1 *REAR BUMPER LOWER CARRIER No such part 79.90 FL *- FL
3 1 *REAR BUMPER REINFORCEMENT Serviceable 515.20 FL *- FL
4 2 *REAR BUMPER RETAINERS Not Necessary 122.40 FL *- FL
5 10 *REAR BUMPER CLIPS Necessary 65.00 FL *65.00 FL
6 1 *REAR BOOTLID Repair 1,234.80 FL *- FL
7 1 *REAR BOOTLID EMBLEM-LOGO Not Necessary 79.40 FL *- FL
8 1 *REAR BOOTLID EMBLEM-320I Necessary 78.70 FL *78.70 FL
9 1 *REAR END PANEL Repair 596.60 FL *- FL
10 1 *REAR END PANEL TOP GARNISH Not Necessary 95.30 FL *- FL
11 10 *REAR END PANEL TOP GARNISH CLIPS Not Necessary 65.00 FL *- FL
12 1 *REAR EXHAUST CHROME TAILPIPE Not Necessary 148.60 FL *- FL
13 2 *PARKING SENSORS Shorted 474.80 FL *474.80 FL
F=Franchise part. L=ListItemDisc.
Sub Total (S$)4,861.50 1,924.30
- List Item Discount on L Items 10.00/10.00% (S$) 486.15192.43
 
Total Parts (S$) 4,375.35 1,731.87
 
 
Recommended Miscellaneous Items
There are no new miscellaneous items selected.

Recommended Labour
Report was unsubmitted during this print-out.
NoParticulars Lab.Type Repairer's Amount

Labour Items
1 TO DISMANTLE & REPLACE DAMAGED PARTS AND PANEL BEATING New 650.00 300.00
2 TO PUTTY,APPLY PRIMER & SPRAYPAINT AFFECTED PORTION New 750.00 450.00
3 TO APPLY RUSTPROOFING ON REPAIRED,REPLACED PANEL New 150.00 0.00
4 TO CHECK ELECTRICAL WIRING FUNCTION New 60.00 30.00
 
Gross Labour Cost (S$) 1,610.00780.00
 

< END OF ESTIMATES >