Printing Options
 Hide Company Header - Leave lines blank
 Print continuously - Do not break pages
Adjuster Report
LKK Auto Consultants Pte Ltd (Co.Reg.No:199607198R)
51 Ubi Ave 1 #01-25, Paya Ubi Industrial Park
Singapore 408933
Tel: 6256-3561  Fax: 6844-8805   Email: sur@lkkauto.com;assignments@lkkauto.com

VEHICLE DAMAGE INSPECTION REPORT

  Our File No:CS/CTI20008462/KTF3N2
Date:21/08/2020

REFERENCE
Handling Insurer:China Taiping Insurance (Singapore) Pte. Ltd. Policy No:DMPCSNW00013272000
Claimant Vehicle No : SLA1820XInsured Vehicle No : SMR2739R
Date of Loss:11/08/2020 Nature of Claim:TP Claim No: SNM20D202860/C02/TKL

DESCRIPTION & IDENTIFICATION OF VEHICLE
Reg No:SLA1820X
Make & Model:MAZDA 3, 1.5 (A) Engine No:P520337036
Reg. Date:24/02/2016 (Man. Year: 2015) Chassis No: JM6BM42A8G0328343
Colour:Metallic Grey Odometer:89209 km
Engine Capacity:1496 cc
Market Value/New Car Price:N/A
Sum Insured (S$):Market Value/New Car Price

CONDITION OF VEHICLE AT THE TIME OF SURVEY
General Condition: Steering (Serviceable):Yes Footbrake (Serviceable):Yes
Handbrake (Serviceable):Yes Engine Modification:No Pre-accident Condition:

CONDITION OF TYRES
Front Tyre Size:205/60R16 Rear Tyre Size:205/60R16
Front Left Side: Continental  6 mm Rear Left Side: Continental  7 mm
Front Right Side:Continental  6 mm Rear Right Side:Continental  7 mm
The above values represent the remaining tyre treads depth

COST OF CLAIMS Repairer's Adjuster's DifferenceDiff %
Parts 2,637.84 1,731.68 906.16 34.35
Miscellaneous Items 0.00 0.00 0.00  
Labour 1,800.00 800.00 1,000.00 55.56
Paintwork Labour 0.00 0.00 0.00  
Towing 0.00 0.00 0.00  
  
Calculated Gross Total (S$) 4,437.84 2,531.68 1,906.16 42.95
Approved Total (Overridden) (S$) 2,000.00
  
(S$) 4,437.84 2,000.00 2,437.84 54.93
+ GST 7.00/7.00% (S$) 310.65 140.00 170.65 54.93
  
Nett Amount (S$) 4,748.49 2,140.00 2,608.49 54.93
  

INSPECTION
Date of Assignment:14/08/2020
Date Inspected:14/08/2020 Inspected At:COMPLETE VMS PTE LTD (HQ)
176 Sin Ming Drive #03-14 Sin Ming Autocare Complex
Singapore 575721
Estimated Period of Repair:3.0 days



Adjuster: KENNETH KONG   Manager: DENISE TAY KWEE CHENG
 
NOTE: This report represents our findings at the time and place of inspection stated herein. Such inspection has been carried out to the best of our knowledge and ability but any other liability under any other circumstances is hereby expressly excluded.

 
REPAIR DETAILS
Reference
Part Source:MRM-SGVersion: 1.0 (Last Synchronised: 21 Aug 2020)
Parts:144MAZDA 3 1.5 (A) (Catalogue:Merimen Singapore 1.0)
Labour:Repairer's(Price-denominated Standard List) 
Print Code:(Unsubmitted, no print-code for SLA1820X)
Validity:These estimates are valid only if they contain the print code (above) on all estimate pages, running page numbers with the END OF ESTIMATES marker on the last estimate page
Further Info:Items/values not in reference catalogue are prefixed with an asterisk *.


Recommended Parts
Report was unsubmitted during this print-out.
No.Qty Part No. Particulars Condition Repairer's Amount

1 1 *REAR BUMPER Buckled/Cracked 1,128.60 FL *1,128.60 FL
2 1 *REAR BUMPER BRACKET Repair 58.00 FL *- FL
3 6 *REAR BUMPER CLIP Necessary 39.00 FL *39.00 FL
4 1 *REAR BUMPER SIDE RETAINER Serviceable 32.00 FL *- FL
5 1 *REAR BUMPER REINFORCEMENT Bent 577.30 FL *565.00 FL
6 1 *REAR END PANEL IMMOBILIZER SENSOR Dented 182.00 FL *182.00 FL
7 1 *REAR END PANEL Repair 580.40 FL *- FL
8 2 *SET REVERSE SENSOR Scratched 560.00 FS *200.00 FS
F=Franchise part. S=SpcNett. L=ListItemDisc.
Sub Total (S$)3,157.30 2,114.60
- List Item Discount on L Items 20.00/20.00% (S$) 519.46382.92
 
Total Parts (S$) 2,637.84 1,731.68
 
 
Recommended Miscellaneous Items
There are no new miscellaneous items selected.

Recommended Labour
Report was unsubmitted during this print-out.
NoParticulars Lab.Type Repairer's Amount

Labour Items
1 RUST PROOFING TREATMENT New 100.00 0.00
2 SPRAY PAINT DAMAGED AREA AFFECTED New 800.00 400.00
3 TO CUT OFF REAR END PANEL,KNOCK AND STRAIGHTEN REAR CHASSIS FRAME AND CHANGE ALL NECESSARY PARTS New 900.00 400.00
 
Gross Labour Cost (S$) 1,800.00800.00
 

< END OF ESTIMATES >