Printing Options
 Hide Company Header - Leave lines blank
 Print continuously - Do not break pages
Adjuster Report
LKK Auto Consultants Pte Ltd (Co.Reg.No:199607198R)
51 Ubi Ave 1 #01-25, Paya Ubi Industrial Park
Singapore 408933
Tel: 6256-3561  Fax: 6844-8805   Email: sur@lkkauto.com;assignments@lkkauto.com

VEHICLE DAMAGE INSPECTION REPORT

  Our File No:CS/CTI20008045/UVF3N2
Date:25/08/2020

REFERENCE
Handling Insurer:China Taiping Insurance (Singapore) Pte. Ltd. Policy No:DMCVSN18120119011
Claimant Vehicle No : XE4288AInsured Vehicle No : YL3815L
Date of Loss:17/04/2020 Nature of Claim:TP Claim No: SNM20D201804/C02/LEWLC

DESCRIPTION & IDENTIFICATION OF VEHICLE
Reg No:XE4288A
Make & Model:ISUZU EXR52E, 15.7 D (A) Engine No:6WG1436193
Reg. Date:03/09/2018 (Man. Year: 2018) Chassis No: JALEXR52EJ7000055
Colour:Black Odometer:126268 km
Engine Capacity:15681 cc
Market Value/New Car Price:N/A
Sum Insured (S$):Market Value/New Car Price

CONDITION OF VEHICLE AT THE TIME OF SURVEY
General Condition: Steering (Serviceable):Yes Footbrake (Serviceable):Yes
Handbrake (Serviceable):Yes Engine Modification:No Pre-accident Condition:

CONDITION OF TYRES
Front Tyre Size:295/80R22.5 Rear Tyre Size:295/80R22.5(D)
Front Left Side: ANNAITE  4 mm Rear Left Side: ANNAITE  4/4 mm
Front Right Side:ANNAITE  4 mm Rear Right Side:ANNAITE  4/4 mm
The above values represent the remaining tyre treads depth

COST OF CLAIMS Repairer's Adjuster's DifferenceDiff %
Parts 5,430.65 3,779.35 1,651.30 30.41
Miscellaneous Items 0.00 0.00 0.00  
Labour 1,550.00 620.00 930.00 60.00
Paintwork Labour 0.00 0.00 0.00  
Towing 0.00 0.00 0.00  
  
Calculated Gross Total (S$) 6,980.65 4,399.35 2,581.30 36.98
Approved Total (Overridden) (S$) 3,500.00
  
(S$) 6,980.65 3,500.00 3,480.65 49.86
+ GST 7.00/7.00% (S$) 488.65 245.00 243.65 49.86
  
Nett Amount (S$) 7,469.30 3,745.00 3,724.30 49.86
  

INSPECTION
Date of Assignment:04/08/2020
Date Inspected:04/08/2020 Inspected At:Focus Auto Pte Ltd (HQ)
1 Kaki Bukit Ave 6, #02-48/50 Autobay
Singapore 417883
Estimated Period of Repair:3.0 days



Adjuster: MARCUS CHUA   Manager: VERON CHEN
 
NOTE: This report represents our findings at the time and place of inspection stated herein. Such inspection has been carried out to the best of our knowledge and ability but any other liability under any other circumstances is hereby expressly excluded.

 
REPAIR DETAILS
Reference
Part Source: (Last Synchronised: 25 Aug 2020)
Parts:N/AISUZU EXR52E 15.7 D (A) (Model not available in database)
Labour:Repairer's(Price-denominated Standard List) 
Print Code:(Unsubmitted, no print-code for XE4288A)
Validity:These estimates are valid only if they contain the print code (above) on all estimate pages, running page numbers with the END OF ESTIMATES marker on the last estimate page
Further Info:Items/values not in reference catalogue are prefixed with an asterisk *.


Recommended Parts
Report was unsubmitted during this print-out.
No.Qty Part No. Particulars Condition Repairer's Amount

1 1 *FRONT CONER PANEL-LH Cracked 856.00 FL *725.15 FL
2 1 *FRONT CONER PANEL RUBBER SEAL-LH Necessary 50.00 FL *50.00 FL
3 1 *FRONT BUMPER Bent/Buckled 2,984.00 FL *2,260.15 FL
4 1 *FRONT BUMPER CONER GARNISH-LH Serviceable 140.00 FL *- FL
5 1 *FRONT HEADLAMP RIM-LH Not Necessary 280.00 FL *- FL
6 1 *FRONT STEP PANEL GARNISH-LH Distorted 689.00 FL *525.00 FL
7 1 *FRONT SIDE MIRROR SUPPORT-LH Bent/Cracked 460.00 FL *460.00 FL
8 1 *FRONT SIDE MIRROR TOP BRACKET-LH Not Necessary 160.00 FL *- FL
9 1 *FRONT SIDE MIRROR SUPPORT GARNISH-LH Not Necessary 60.00 FL *- FL
10 1 *FRONT SIDE MIRROR-LH (TOP) Not Necessary 260.00 FL *- FL
11 1 *FRONT SIDE MIRROR LOWER-LH Broken 260.00 FL *260.00 FL
12 1 *FRONT LOWER CORNER GARNISH-LH Missing 190.00 FL *166.00 FL
F=Franchise part. L=ListItemDisc.
Sub Total (S$)6,389.00 4,446.30
- List Item Discount on L Items 15.00/15.00% (S$) 958.35666.95
 
Total Parts (S$) 5,430.65 3,779.35
 
 
Recommended Miscellaneous Items
There are no new miscellaneous items selected.

Recommended Labour
Report was unsubmitted during this print-out.
NoParticulars Lab.Type Repairer's Amount

Labour Items
1 PANEL BEATING New 850.00 300.00
2 CHECK WIRING New 60.00 20.00
3 RUST PROOFING New 60.00 0.00
4 SPRAY PAINTING New 580.00 300.00
 
Gross Labour Cost (S$) 1,550.00620.00
 

< END OF ESTIMATES >