Adjuster Report
VEHICLE DAMAGE INSPECTION REPORT
|
| |
Our File No: | CS/TMI20007821/T1VF3N2 |
| Date: | 17/08/2020 |
REFERENCE |
| Handling Insurer: | Tokio Marine Insurance Singapore Ltd |
Policy No: | ML000128 |
| Claimant Vehicle No : | SHA7029Y | Insured Vehicle No : | SLQ7270J |
| Date of Loss: | 28/07/2020 |
Nature of Claim: | TP |
Claim No: |
M2003798
|
| DESCRIPTION & IDENTIFICATION OF VEHICLE |
| Reg No: | SHA7029Y |
| Make & Model: | HYUNDAI I40, 1.7 D CRDI F/L ABS AIRBAG 4DR (A) |
Engine No: | D4FDFU606563 |
| Reg. Date: | 31/12/2014 (Man. Year: 2014) |
Chassis No: |
KMHLB41UMFU062622 |
| Colour: | Blue |
Odometer: | 742476 km |
| Engine Capacity: | 1685 cc |
| Market Value/New Car Price: | N/A |
| Sum Insured (S$): | Market Value/New Car Price |
| CONDITION OF VEHICLE AT THE TIME OF SURVEY |
| General Condition: | |
Steering (Serviceable): | Yes | Footbrake (Serviceable): | Yes |
| Handbrake (Serviceable): | Yes |
Engine Modification: | No |
Pre-accident Condition: | |
| CONDITION OF TYRES |
| Front Tyre Size: | 205/60R16 |
Rear Tyre Size: | 205/60R16 |
|
Front Left Side:
| Hankook 6 mm | |
Rear Left Side:
| Hankook 6 mm | |
| Front Right Side: | Hankook 6 mm | |
Rear Right Side: | Hankook 6 mm | |
| The above values represent the remaining tyre treads depth |
| Parts |
1,270.96 |
74.88
|
1,196.08 |
94.11 |
| Miscellaneous Items |
11.00 |
11.00 |
0.00 |
0.00 |
| Labour |
830.00 |
710.00 |
120.00 |
14.46 |
| Paintwork Labour |
0.00 |
0.00 |
0.00 |
|
| Towing |
0.00 |
0.00 |
0.00 |
|
| | |
| Calculated Gross Total (S$) |
2,111.96 |
795.88 |
1,316.08 |
62.32 |
| Approved Total (Overridden) (S$) |
|
650.00 |
| | |
| (S$) |
2,111.96 |
650.00 |
1,461.96 |
69.22 |
| +
GST 0.00/7.00% (S$)
|
0.00 |
45.50 |
-45.50 |
|
| | |
| Nett Amount (S$) |
2,111.96 |
695.50 |
1,416.46 |
67.07 |
| | |
| INSPECTION |
| Date of Assignment: | 06/08/2020 |
| Date Inspected: | 29/07/2020 |
Inspected At: | ComfortDelGro Engineering Pte Ltd (Loyang) 59 Loyang Drive Singapore 508969 |
| Estimated Period of Repair: | 2.0 days |
| Adjuster: |
MOHD TAUFIKH BIN HAMID |
|
Manager:
|
VERON CHEN
|
|
|
|
|
|
|
NOTE: This report represents our findings at the time and place of inspection stated herein. Such inspection has been carried out to the best of our knowledge and ability but any other liability under any other circumstances is hereby expressly excluded.
|
Reference |
| Part Source: | MRM-SG | Version: 1.0 (Last Synchronised: 17 Aug 2020) |
| Parts: | 143 | HYUNDAI I40 1.7 D CRDI F/L ABS AIRBAG 4DR (A) (Catalogue:Merimen Singapore 1.0) |
| Labour: | Repairer's | (Price-denominated Standard List) | |
| Print Code: | (Unsubmitted, no print-code for SHA7029Y) |
| Validity: | These estimates are valid only if they contain the print code (above) on all estimate pages, running page numbers with the END OF ESTIMATES marker on the last estimate page |
| Further Info: | Items/values not in reference catalogue are prefixed with an asterisk *. |
Recommended Parts
| Report was unsubmitted during this print-out. |
| No. | Qty |
Part No. |
Particulars |
Condition | Repairer's | |
Reference | |
Amount |
|
| 1 |
1 |
|
*FRT BUMPER GRILLE LH |
Cut |
93.60 |
FL |
-
| |
*93.60 |
FL |
| 2 |
1 |
|
*FRT WHEEL CAP LH |
Not Necessary |
107.10 |
FL |
-
| |
*- |
FL |
| 3 |
1 |
|
*HEADLAMP LH |
Not Necessary |
1,388.00 |
FL |
-
| |
*- |
FL |
| F=Franchise part. L=ListItemDisc. |
|
| Sub Total (S$) | 1,588.70 | |
93.60
| |
| - List Item Discount on L Items 20.00/20.00% (S$) |
317.74 | | 18.72 | |
| |
|
| Total Parts (S$) |
1,270.96 | |
| |
74.88 | |
| |
|
Recommended Miscellaneous Items
| No | Qty | Particulars |
Repairer's |
Amount |
|
| Miscellaneous Items |
| 1 |
1 |
OD/TP Case (Insurer) |
11.00 |
11.00 |
| |
|
| | Sub Total (S$) |
11.00 | 11.00 |
| |
|
Recommended Labour
| Report was unsubmitted during this print-out. |
| No | Particulars |
Lab.Type | Repairer's | Amount |
|
| Labour Items |
| 1 |
PANEL BEATING |
New |
300.00 | 280.00 |
| 2 |
SPRAY PAINTING (FRT BUMPER / FRT FENDER LH) |
New |
500.00 | 400.00 |
| 3 |
CHECK LIGHTINGS |
New |
30.00 | 30.00 |
| |
|
| Gross Labour Cost (S$) |
830.00 | 710.00 |
| |
|
< END OF ESTIMATES >