Printing Options
 Hide Company Header - Leave lines blank
 Print continuously - Do not break pages
Adjuster Report
LKK Auto Consultants Pte Ltd (Co.Reg.No:199607198R)
51 Ubi Ave 1 #01-25, Paya Ubi Industrial Park
Singapore 408933
Tel: 6256-3561  Fax: 6844-8805   Email: sur@lkkauto.com;assignments@lkkauto.com

VEHICLE DAMAGE INSPECTION REPORT

  Our File No:CS/AIG20007140/AVF3N2
Date:28/07/2020

REFERENCE
Handling Insurer:AIG Asia Pacific Insurance Pte. Ltd. Policy No:2100411527-05
Claimant Vehicle No : SJM5808SInsured Vehicle No : SKS7447T
Date of Loss:07/07/2020 Nature of Claim:TP Claim No: 6368960645SG

DESCRIPTION & IDENTIFICATION OF VEHICLE
Reg No:SJM5808S
Make & Model:TOYOTA CAMRY, 2.5 (A) Engine No:2AR1944096
Reg. Date:23/05/2018 (Man. Year: 2018) Chassis No: MR053AK5004012750
Colour:Silver Odometer:29636 km
Engine Capacity:2494 cc
Market Value/New Car Price:N/A
Sum Insured (S$):Market Value/New Car Price

CONDITION OF VEHICLE AT THE TIME OF SURVEY
General Condition: Steering (Serviceable):Yes Footbrake (Serviceable):Yes
Handbrake (Serviceable):Yes Engine Modification:No Pre-accident Condition:

CONDITION OF TYRES
Front Tyre Size:215/55R17 Rear Tyre Size:215/55R17
Front Left Side: Dunlop  6 mm Rear Left Side: Dunlop  6 mm
Front Right Side:Dunlop  6 mm Rear Right Side:Dunlop  6 mm
The above values represent the remaining tyre treads depth

COST OF CLAIMS Repairer's Adjuster's DifferenceDiff %
Parts 6,710.08 3,241.90 3,468.18 51.69
Miscellaneous Items 0.00 0.00 0.00  
Labour 2,710.00 910.00 1,800.00 66.42
Paintwork Labour 0.00 0.00 0.00  
Towing 0.00 0.00 0.00  
  
Calculated Gross Total (S$) 9,420.08 4,151.90 5,268.18 55.93
Approved Total (Overridden) (S$) 3,300.00
  
Nett Amount (S$) 9,420.08 3,300.00 6,120.08 64.97
  

INSPECTION
Date of Assignment:08/07/2020
Date Inspected:09/07/2020 Inspected At:Yi Heng Motor Workshop (HQ)
Blk 1 Kaki Bt Ave 6 #02-19
Singapore 417883
Estimated Period of Repair:4.0 days



Adjuster: ADRIAN LING   Manager: VERON CHEN
 
NOTE: This report represents our findings at the time and place of inspection stated herein. Such inspection has been carried out to the best of our knowledge and ability but any other liability under any other circumstances is hereby expressly excluded.

 
REPAIR DETAILS


Recommended Parts
Report was unsubmitted during this print-out.
No.Qty Part No. Particulars Condition Repairer's Amount

1 1 *HEAD LAMP (RH) Cut 1,132.00 FL *1,132.00 FL
2 1 *HEAD LAMP CLIP (RH) Necessary 10.50 FL *10.50 FL
3 1 *HEAD LAMP CHROME (RH) Not Necessary 112.00 FL *- FL
4 1 *FRONT GRILLE Cracked 586.00 FL *586.00 FL
5 1 *FRONT BUMPER Distorted 1,635.00 FL *543.00 FL
6 1 *FRONT BUMPER SIDE ATTACHMENT O/s Necessary 96.48 FL *48.24 FL
7 1 *FRONT BUMPER SIDE GARNISH (RH) Deformed 118.00 FL *118.00 FL
8 1 *FRONT BUMPER GRILLE Cracked 546.00 FL *161.00 FL
9 1 *FRONT BUMPER GRILLE CHROME (LONG) Cut 281.00 FL *281.00 FL
10 1 *FRONT BUMPER GRILLE CHROME (RH) Not Necessary 218.00 FL *- FL
11 1 *FRONT BUMPER SPONGE Cracked 286.00 FL *286.00 FL
12 1 *FRONT BUMPER REINFORCEMENT Not Necessary 653.00 FL *- FL
13 1 *FRONT BUMPER SENSOR Not Necessary 428.00 FL *- FL
14 1 *WIPER TANK Deformed 247.00 FL *95.00 FL
15 1 *FRONT FENDER (RH) Dented 798.00 FL *798.00 FL
16 1 *FRONT FENDER INNER COWLING (RH) Torn 286.00 FL *191.00 FL
17 10 *FRONT FENDER INNER COWLING CLIP (RH) Necessary 89.00 FL *30.00 FL
18 1 *FRONT FENDER EMBLEM VVT-I Necessary 42.80 FL *42.80 FL
19 1 *FRONT SUPPORT PANEL Not Necessary 1,293.00 FL *- FL
20 10 *FRONT SUPPORT TOP GARNISH CLIP Not Necessary 89.00 FL *- FL
F=Franchise part. L=ListItemDisc.
Sub Total (S$)8,946.78 4,322.54
- List Item Discount on L Items 25.00/25.00% (S$) 2,236.701,080.64
 
Total Parts (S$) 6,710.08 3,241.90
 
 
Recommended Miscellaneous Items
There are no new miscellaneous items selected.

Recommended Labour
Report was unsubmitted during this print-out.
NoParticulars Lab.Type Repairer's Amount

Labour Items
1 TO CHECK WIRING SYSTEM New 50.00 30.00
2 TO APPLY UNDER SEALING ON AFFECTED AREAS New 120.00 0.00
3 TO REMOVE AND REFIX HEADLAMP ASSY AND REALIGNMENT LIGHTING SYSTEM New 120.00 30.00
4 TO REMOVE AND REFIX AIR-CON CONDENSOR,PIPING SYSTEM AND TOP UP GAS GAS ETC New 380.00 0.00
5 TO REMOVE AND REFIX RADIATOR ASSY AND CONDUCT PRESSOR TEST New 280.00 0.00
6 TO REPLACE NEW PARTS,CUT,WELD,KNOCK AND ETC New 880.00 450.00
7 TO RESPRAY ON AFFECTED AREAS New 880.00 400.00
 
Gross Labour Cost (S$) 2,710.00910.00
 

< END OF ESTIMATES >