Printing Options
 Hide Company Header - Leave lines blank
 Print continuously - Do not break pages
Adjuster Report
LKK Auto Consultants Pte Ltd (Co.Reg.No:199607198R)
51 Ubi Ave 1 #01-25, Paya Ubi Industrial Park
Singapore 408933
Tel: 6256-3561  Fax: 6844-8805   Email: sur@lkkauto.com;assignments@lkkauto.com

VEHICLE DAMAGE INSPECTION REPORT

  Our File No:CS/MSG20006313/UVF3N2
Date:09/07/2020

REFERENCE
Handling Insurer:MSIG Insurance (Singapore) Pte. Ltd. Policy No:MSD/VMS/20-506642-WTT
Claimant Vehicle No : SLP1919SInsured Vehicle No : FBM8055Y
Date of Loss:09/06/2020 Nature of Claim:TP Claim No: MSC/V/20-000565

DESCRIPTION & IDENTIFICATION OF VEHICLE
Reg No:SLP1919S
Make & Model:HONDA CIVIC, 2.0 TYPE-R (M) Engine No:K20A5824059
Reg. Date:25/06/2008 (Man. Year: 2008) Chassis No: FD21403922
Colour:Silver Odometer:191475 km
Engine Capacity:1998 cc
Market Value/New Car Price:N/A
Sum Insured (S$):Market Value/New Car Price

CONDITION OF VEHICLE AT THE TIME OF SURVEY
General Condition: Steering (Serviceable):Yes Footbrake (Serviceable):Yes
Handbrake (Serviceable):Yes Engine Modification:No Pre-accident Condition:

CONDITION OF TYRES
Front Tyre Size:225/45 ZR17 Rear Tyre Size:225/45 ZR17
Front Left Side: Michelin  6 mm Rear Left Side: Michelin  6 mm
Front Right Side:Michelin  6 mm Rear Right Side:Michelin  6 mm
The above values represent the remaining tyre treads depth

COST OF CLAIMS Repairer's Adjuster's DifferenceDiff %
Parts 5,851.20 1,162.28 4,688.92 80.14
Miscellaneous Items 0.00 0.00 0.00  
Labour 3,620.00 670.00 2,950.00 81.49
Paintwork Labour 0.00 0.00 0.00  
Towing 0.00 0.00 0.00  
  
Calculated Gross Total (S$) 9,471.20 1,832.28 7,638.92 80.65
Approved Total (Overridden) (S$) 1,450.00
  
(S$) 9,471.20 1,450.00 8,021.20 84.69
+ GST 7.00/7.00% (S$) 662.98 101.50 561.48 84.69
  
Nett Amount (S$) 10,134.18 1,551.50 8,582.68 84.69
  

INSPECTION
Date of Assignment:11/06/2020
Date Inspected:16/06/2020 Inspected At:Kaizen Motors Pte Ltd (HQ)
68 KAKI BUKIT AVE 6, #02-12 ARK @ KAKI BUKIT
Singapore 417896
Estimated Period of Repair:2.0 days



Adjuster: MARCUS CHUA   Manager: VERON CHEN
 
NOTE: This report represents our findings at the time and place of inspection stated herein. Such inspection has been carried out to the best of our knowledge and ability but any other liability under any other circumstances is hereby expressly excluded.

 
REPAIR DETAILS
Reference
Part Source:MRM-SGVersion: 1.0 (Last Synchronised: 09 Jul 2020)
Parts:144HONDA CIVIC 2.0 TYPE-R (M) (Catalogue:Merimen Singapore 1.0)
Labour:Repairer's(Price-denominated Standard List) 
Print Code:(Unsubmitted, no print-code for SLP1919S)
Validity:These estimates are valid only if they contain the print code (above) on all estimate pages, running page numbers with the END OF ESTIMATES marker on the last estimate page
Further Info:Items/values not in reference catalogue are prefixed with an asterisk *.


Recommended Parts
Report was unsubmitted during this print-out.
No.Qty Part No. Particulars Condition Repairer's Amount

1 1 *REAR BUMPER Deformed 1,091.00 F *1,091.00 FL
2 1 *REAR L/H TAIL LAMP OUTER Cracked 305.60 F *305.60 FL
3 1 *REAR L/H TAIL LAMP INNER Not Necessary 379.80 F *- FL
4 1 *REAR DIFFUSER Not Necessary 953.00 F *- FL
5 1 *REAR SPOILER Not Necessary 1,355.00 F *- FL
6 1 *REAR BOOT Not Necessary 1,112.80 F *- FL
7 1 *REAR REINFORCEMENT PANEL Not Necessary 574.00 F *- FL
8 1 *SET REAR BUMPER CLIPS Necessary 80.00 FS *45.00 FS
F=Franchise part. S=SpcNett. L=ListItemDisc.
Sub Total (S$)5,851.20 1,441.60
- List Item Discount on L Items 0.00/20.00% (S$) 0.00279.32
 
Total Parts (S$) 5,851.20 1,162.28
 
 
Recommended Miscellaneous Items
There are no new miscellaneous items selected.

Recommended Labour
Report was unsubmitted during this print-out.
NoParticulars Lab.Type Repairer's Amount

Labour Items
1 LABOUR FOR CHECKING ON WIRING New 120.00 20.00
2 LABOUR FOR DISMANTLING & REPLACING OF ACCIDENT DAMAGED PARTS,INCLUDING WELDING,KNOCKING,REPAIRING,STRAIGHTENING,RESHAPE & ADJUSTMENT OF REAR BUMPER,REAR END PANEL & TAIL LAMP PANEL New 1,800.00 200.00
3 SPRAYPAINTING & PUTTY OF REAR BUMPER,REAR BOOT,REAR DIFFUSER,REAR SPOILER New 1,200.00 450.00
4 APPLYING OF RUST-PROOFING New 250.00 0.00
5 LABOUR FOR RETROFIT & INSTALL TRIMMING New 250.00 0.00
 
Gross Labour Cost (S$) 3,620.00670.00
 

< END OF ESTIMATES >