Printing Options
 Hide Company Header - Leave lines blank
 Print continuously - Do not break pages
Adjuster Report
LKK Auto Consultants Pte Ltd (Co.Reg.No:199607198R)
51 Ubi Ave 1 #01-25, Paya Ubi Industrial Park
Singapore 408933
Tel: 6256-3561  Fax: 6844-8805   Email: sur@lkkauto.com;assignments@lkkauto.com

VEHICLE DAMAGE INSPECTION REPORT

  Our File No:CS/CTI20006310/R1SF3N2
Date:07/07/2020

REFERENCE
Handling Insurer:China Taiping Insurance (Singapore) Pte. Ltd. Policy No:DMPCSNA00008192001
Claimant Vehicle No : SGM3203KInsured Vehicle No : SKR1157A
Date of Loss:09/06/2020 Nature of Claim:TP Claim No: SNM20D202091/C02/TAYHP

DESCRIPTION & IDENTIFICATION OF VEHICLE
Reg No:SGM3203K
Make & Model:HONDA EDIX, 1.7 (A) Engine No:D17A4053364
Reg. Date:13/10/2006 (Man. Year: 2006) Chassis No: BE11102915
Colour:Black Odometer:110559 km
Engine Capacity:1668 cc
Market Value/New Car Price:N/A
Sum Insured (S$):Market Value/New Car Price

CONDITION OF VEHICLE AT THE TIME OF SURVEY
General Condition: Steering (Serviceable):Yes Footbrake (Serviceable):Yes
Handbrake (Serviceable):Yes Engine Modification:No Pre-accident Condition:

CONDITION OF TYRES
Front Tyre Size:205/65R15 Rear Tyre Size:205/65R15
Front Left Side: Michelin  5 mm Rear Left Side: Michelin  5 mm
Front Right Side:Michelin  5 mm Rear Right Side:Michelin  5 mm
The above values represent the remaining tyre treads depth

COST OF CLAIMS Repairer's Adjuster's DifferenceDiff %
Parts 5,726.20 1,023.36 4,702.84 82.13
Miscellaneous Items 0.00 0.00 0.00  
Labour 2,280.00 1,300.00 980.00 42.98
Paintwork Labour 0.00 0.00 0.00  
Towing 0.00 0.00 0.00  
  
Calculated Gross Total (S$) 8,006.20 2,323.36 5,682.84 70.98
Approved Total (Overridden) (S$) 1,850.00
  
(S$) 8,006.20 1,850.00 6,156.20 76.89
+ GST 7.00/7.00% (S$) 560.43 129.50 430.93 76.89
  
Nett Amount (S$) 8,566.63 1,979.50 6,587.13 76.89
  

INSPECTION
Date of Assignment:11/06/2020
Date Inspected:12/06/2020 Inspected At:Hin Lung Workshop (HQ)
Blk 1008 Bukit Merah Lane 3, #01-20
Singapore 159722
Estimated Period of Repair:6.0 days



Adjuster: MOHD RASUL   Manager: Hiew May Fung
 
NOTE: This report represents our findings at the time and place of inspection stated herein. Such inspection has been carried out to the best of our knowledge and ability but any other liability under any other circumstances is hereby expressly excluded.

 
REPAIR DETAILS
Reference
Part Source:MRM-SGVersion: 1.0 (Last Synchronised: 07 Jul 2020)
Parts:144HONDA EDIX 1.7 (A) (Catalogue:Merimen Singapore 1.0)
Labour:Repairer's(Price-denominated Standard List) 
Print Code:(Unsubmitted, no print-code for SGM3203K)
Validity:These estimates are valid only if they contain the print code (above) on all estimate pages, running page numbers with the END OF ESTIMATES marker on the last estimate page
Further Info:Items/values not in reference catalogue are prefixed with an asterisk *.


Recommended Parts
Report was unsubmitted during this print-out.
No.Qty Part No. Particulars Condition Repairer's Amount

1 1 *REAR BUMPER Deformed 980.20 F *980.20 FL
2 1 *REAR SIDE RETAINER LH Necessary 34.00 F *34.00 FL
3 1 *REAR SIDE RETAINER RH Serviceable 34.00 F *- FL
4 10 *BUMPER CLIPS Necessary 55.00 F *55.00 FL
5 1 *REAR FENDER LH Repair 1,025.00 F *- FL
6 1 *REAR FENDER RH Serviceable 1,025.00 F *- FL
7 1 *REAR END PANEL Repair 530.00 F *- FL
8 1 *REAR BOOT WITH WORDINGS Repair 1,353.00 F *- FL
9 1 *PANEL GARNISH LH Cracked 210.00 F *210.00 FL
10 1 *LINING,FENDER LH Serviceable 319.00 F *- FL
11 1 *WEATHER STRIP,TAILGATE Serviceable 161.00 F *- FL
F=Franchise part. L=ListItemDisc.
Sub Total (S$)5,726.20 1,279.20
- List Item Discount on L Items 0.00/20.00% (S$) 0.00255.84
 
Total Parts (S$) 5,726.20 1,023.36
 
 
Recommended Miscellaneous Items
There are no new miscellaneous items selected.

Recommended Labour
Report was unsubmitted during this print-out.
NoParticulars Lab.Type Repairer's Amount

Labour Items
1 REPLACE NEW PARTS,REMOVE/REFIT ALL ATTACHMENT PARTS TO FACILITATE REPAIR New 1,200.00 500.00
2 SPRAY PAINT ON THE EFFECTED AREAS WITH 2K PAINT New 1,000.00 800.00
3 CHECK WIRING AND PROPER FUNCTIONING New 80.00 0.00
 
Gross Labour Cost (S$) 2,280.001,300.00
 

< END OF ESTIMATES >