Adjuster Report
VEHICLE DAMAGE INSPECTION REPORT
|
| |
Our File No: | CS/CTI20006147/USF3N2 |
| Date: | 25/06/2020 |
REFERENCE |
| Handling Insurer: | China Taiping Insurance (Singapore) Pte. Ltd. |
Policy No: | DMPCSNW00047232000 |
| Claimant Vehicle No : | SMS3585E | Insured Vehicle No : | SJW5507H |
| Date of Loss: | 17/05/2020 |
Nature of Claim: | TP |
Claim No: |
SNM20D201936C02
|
| DESCRIPTION & IDENTIFICATION OF VEHICLE |
| Reg No: | SMS3585E |
| Make & Model: | HONDA CITY, 1.5 (A) |
Engine No: | L15Z16933762 |
| Reg. Date: | 24/02/2020 (Man. Year: 2020) |
Chassis No: |
MRHGM6660LT000193 |
| Colour: | Grey |
Odometer: | 3558 km |
| Engine Capacity: | 1497 cc |
| Market Value/New Car Price: | N/A |
| Sum Insured (S$): | Market Value/New Car Price |
| CONDITION OF VEHICLE AT THE TIME OF SURVEY |
| General Condition: | |
Steering (Serviceable): | Yes | Footbrake (Serviceable): | Yes |
| Handbrake (Serviceable): | Yes |
Engine Modification: | No |
Pre-accident Condition: | |
| CONDITION OF TYRES |
| Front Tyre Size: | 185/55R16 |
Rear Tyre Size: | 185/55R16 |
|
Front Left Side:
| Bridgestone 9 mm | |
Rear Left Side:
| Bridgestone 9 mm | |
| Front Right Side: | Bridgestone 9 mm | |
Rear Right Side: | Bridgestone 9 mm | |
| The above values represent the remaining tyre treads depth |
| Parts |
916.66 |
614.58
|
302.08 |
32.95 |
| Miscellaneous Items |
0.00 |
0.00 |
0.00 |
|
| Labour |
2,700.00 |
1,250.00 |
1,450.00 |
53.70 |
| Paintwork Labour |
0.00 |
0.00 |
0.00 |
|
| Towing |
0.00 |
0.00 |
0.00 |
|
| | |
| Gross Total (S$) |
3,616.66 |
1,864.58 |
1,752.08 |
48.44 |
| +
GST 7.00/7.00% (S$)
|
253.17 |
130.52 |
122.65 |
48.45 |
| | |
| Nett Amount (S$) |
3,869.83 |
1,995.10 |
1,874.73 |
48.44 |
| | |
| INSPECTION |
| Date of Assignment: | 11/06/2020 |
| Date Inspected: | 08/06/2020 |
Inspected At: | Kah Motor Co Sdn Bhd (Ubi) 15 Ubi Road 4 Singapore 408610 |
| Estimated Period of Repair: | 3.0 days |
| Adjuster: |
MARCUS CHUA |
|
Manager:
|
Hiew May Fung
|
|
|
|
|
|
|
NOTE: This report represents our findings at the time and place of inspection stated herein. Such inspection has been carried out to the best of our knowledge and ability but any other liability under any other circumstances is hereby expressly excluded.
|
Reference |
| Part Source: | MRM-SG | Version: 1.0 (Last Synchronised: 25 Jun 2020) |
| Parts: | 143 | HONDA CITY 1.5 (A) (Catalogue:Merimen Singapore 1.0) |
| Labour: | Repairer's | (Price-denominated Standard List) | |
| Print Code: | (Unsubmitted, no print-code for SMS3585E) |
| Validity: | These estimates are valid only if they contain the print code (above) on all estimate pages, running page numbers with the END OF ESTIMATES marker on the last estimate page |
| Further Info: | Items/values not in reference catalogue are prefixed with an asterisk *. |
Recommended Parts
| Report was unsubmitted during this print-out. |
| No. | Qty |
Part No. |
Particulars |
Condition | Repairer's | |
Amount |
|
| 1 |
1 |
|
*FACE,FR BUMPER |
Dented/Deformed |
436.81 |
FS |
*436.81 |
FS |
| 2 |
1 |
|
*CLIP,BUMPER (15 Pcs) |
Necessary |
32.77 |
FS |
*32.77 |
FS |
| 3 |
1 |
|
*SPACERL,FR BUMPER SIDE |
Not Necessary |
9.88 |
FS |
*- |
FS |
| 4 |
1 |
|
*SPACERR,FR BUMPER SIDE |
Not Necessary |
9.88 |
FS |
*- |
FS |
| 5 |
1 |
|
*BEAM COMPFR BUMPER |
Not Necessary |
252.32 |
FS |
*- |
FS |
| 6 |
1 |
|
*SEAL NUMBER PLATE |
Necessary |
80.00 |
FS |
*80.00 |
FS |
| 7 |
1 |
|
*NUMBER PLATE WITH CASING-OPC-LL |
Bent |
45.00 |
FS |
*45.00 |
FS |
| 8 |
1 |
|
*SUNDRIES |
Necessary |
50.00 |
FS |
*20.00 |
FS |
| F=Franchise part. S=SpcNett. |
|
| Total Parts (S$) |
916.66 | | 614.58 | |
| |
|
Recommended Miscellaneous Items
There are no new miscellaneous items selected. |
Recommended Labour
| Report was unsubmitted during this print-out. |
| No | Particulars |
Lab.Type | Repairer's | Amount |
|
| Labour Items |
| 1 |
INSPECT FR LIGHTING MECHANISMS & FOCUS |
New |
100.00 | 80.00 |
| 2 |
STRAIGHTEN ALIGN BULKHEAD & RENEW DAMAGE PARTS |
New |
1,400.00 | 650.00 |
| 3 |
SPRAY PAINTING ON REPAIRED OR REPLACED AREAS (2P) |
New |
1,200.00 | 520.00 |
| |
|
| Gross Labour Cost (S$) |
2,700.00 | 1,250.00 |
| |
|
< END OF ESTIMATES >